Task breakdown

Skill RainLib/full-stack-skill/.claude/skills/task-breakdown

full-stack development lifecycle

Install
npx -y skills add RainLib/full-stack-skill --skill task-breakdown

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

将程序设计拆分为可管理的开发任务单元,定义优先级、依赖和开发顺序。在程序设计之后、单元测试之前使用。

SKILL.md

1.6 KB, as published. Nobody here has run it

任务拆分

何时使用

  • 全栈工作流第 5 阶段:程序设计完成后、单元测试之前。
  • 用户要求将设计拆为可管理的开发节奏时。

输入

读取当前迭代目录下的:

  • 需求文档(requirements-{id}.md
  • 技术评审文档(technical-review-{id}.md
  • 程序设计文档(program-design-{id}.md

执行要点

  1. 拆分粒度:每个任务应在 1~4 小时内可完成,包含明确的输入和产出。
  2. 依赖排序:标注任务间依赖关系,生成执行顺序(可并行的标注为并行)。
  3. 优先级:P0(核心流程)、P1(重要功能)、P2(增强/优化)。
  4. 验收标准:每个任务附简要验收条件(与后续单元测试对应)。
  5. 分批建议:按开发批次(Sprint/Batch)组织,建议每批 3~7 个任务。

产出

文档与状态

  • 产出写入 docs/{current_iteration_id}/task-breakdown-{task_breakdown_id}.md
  • 开始前:调用 history-manager skill 的 get-phase task_breakdowncheck-file 确认是否已完成。
  • 完成后:调用 history-manager skill 的 set-phase task_breakdown {task_breakdown_id} 记录并推进状态。