Prd
Turn an initiative that spans more than one feature into a plan under plans/ — a short header, a checklist of tasks, and references to the specs that will be built separately. Use it when someone arrives with a PRD, a roadmap item, an epic, or a rough idea too large for one spec, and the first job is to find out what it actually decomposes into. For a single feature whose shape is already clear, skip this and run `scc spec new`.From its SKILL.md
npx -y skills add protonspy/open-wiki --skill prdAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
4.9 KB, as published. Nobody here has run it
You take an initiative that is too big for one spec and turn it into a plan: one
file under plans/, holding the decomposition and nothing else.
A note on the word. "PRD" is what you arrive with — a product document, a
roadmap line, a paragraph in a chat. It is not an artifact this project keeps. The
artifact is a plan, and the vocabulary in
.claude/rules/routing.md is what the rest of the workspace uses. Do not
create a docs/prd/ directory.
First, check this is a plan at all
.claude/rules/routing.md asks one question, and it is worth asking
before you start: does this need requirements and a design settled before any code?
- Too large for one spec — decomposes into several. That is a plan. Continue.
- One feature, requirements not yet settled — that is a spec. Run
scc spec new <feature>and writerequirements.md. Do not wrap one feature in a plan for ceremony. - Small enough that the what was never in doubt — that is a plan too, but a bare checklist. Skip the interrogation below and write the list.
Then find out what it really is
An initiative arrives underspecified. Your job before writing anything is to make it specific enough to decompose, and the fastest way there is a small batch of concrete multiple-choice questions, asked once — not a long interview, and not guessing:
- Who is this for, and what can they not do today? An initiative that cannot name the user is not ready to be decomposed.
- What is in and what is explicitly out? The out-list is the more valuable half; it is the one that prevents the third spec from growing a fourth.
- What does "done" mean for the whole of it? Not per feature — the condition under which the initiative is finished and the plan can be closed.
- What is already decided and not up for discussion? A deadline, a vendor, an existing system that has to keep working.
Ask them together, offer concrete options rather than open prompts, and stop asking once you can name the leaves. If a question's answer would not change the decomposition, do not ask it.
Decompose
scc plan new <name>
Then fill it in. The plan's sections are closed — the title, one to three
sentences, then ## Why, ## Paths, ## References, ## Out of scope, ## Tasks,
## Done when, and nothing else. There is deliberately nowhere for prose to grow: the
file is carried by every session that runs it. The rules it must hold to:
## Tasksholds the work;## Referencesnames the specs. A task carries a checkbox and the box is its state. A reference carries none — that spec's state lives in that spec and is read from there. An item that does both keeps two records of one fact, andscc validatereports it asplan.item-has-two-records.- A referenced spec is an ordinary spec.
specs/<feature>/is not nested under the plan and is built by exactly the same rules as one somebody asked for directly. A task that consumes one is ticked when that spec closes. - Each spec-sized piece is one coherent feature — something a person could describe in a sentence and verify on its own. If it needs three sentences and an "and", it is two.
- Order is
_Depends_, not position. A task that cannot start until another is done says so:_Depends 1.1_._Priority 2_breaks a tie. Nothing else records order, and nothing restates it in prose. - A plan is work, not knowledge. It lives in
plans/, never indocs/.
Referenced specs must exist, or scc validate reports plan.unknown-spec. Create
them with scc spec new as you name them — an empty spec directory is a real
placeholder; a reference to nothing is a broken plan.
Before you hand it over
scc validate— exit 0, or fix what it names. Thenscc plan approve <name>, which fixes the content and seals it, so a later edit outsidesccis visible rather than silent. Approving is the hand-over.- Read the list back as a whole and ask what is missing. Migration, backfill, the switch-over, the thing that has to keep working while this ships, and how it gets turned off if it goes wrong. Decompositions fail at the seams, not in the middle of a feature.
- Check the vocabulary. Every term the plan coins is a term three specs will
inherit. If any of them is contested or new, use the
glossaryskill now, while it costs one edit. - A choice made here that is hard to reverse is an ADR, not prose in the plan.
Use the
adrskill, and cite the record from the item it governs.