What its author says it does
Copied from the file, not written here
Analyze current sprint health by examining sprint goals, issue status, PR readiness, and recent comments for risks and blockers. Produces a goal-oriented sprint health report with confidence assessments. Use during check-ins, refinement, or async updates.
The file declares its own license as MIT. That is the author’s claim about this one file, and it is not the same thing as the license GitHub reports for the repository, which is listed with the other numbers below.
SKILL.md
9.4 KB, as published. Nobody here has run it
Sprint Status
Analyze the current sprint against its goals. Goes beyond "what's in progress" to assess whether sprint goals will actually be met, surface risks from issue/PR activity, and flag items that need attention.
When to use
- "What is the current sprint?" — Quick summary: name, dates, issue counts, goals, on track/at risk
- "Get sprint breakdown" — Full analysis: goal-by-goal status, PR readiness, comment signals, risk assessment
- "Update sprint status" — Generate a copyable status update to paste into the project board's status/notes field
- Before backlog refinement or team check-ins
- Mid-sprint risk assessment
- As input for weekly snippets
Prerequisites
- GitHub Projects board with sprint iterations configured
- Sprint goals defined as epics or initiative issues assigned to the current iteration
- GitHub CLI (
gh) authenticated with org and project access - Team roster (
team.json) for mapping assignees
Modes
This skill operates in three modes depending on what the user asks for. All three share Steps 1-2 (identify sprint, fetch items). They diverge after that.
Mode 1: Current Sprint (Quick Summary)
Triggered by: "what is the current sprint?", "current sprint", "where are we?"
A fast, lightweight answer. No deep analysis. Just the facts.
Output:
## Sprint [Name] ([Start] → [End], [N] days remaining)
**Goals:**
1. [Epic/Initiative title] — [X/Y] issues done
2. [Epic/Initiative title] — [X/Y] issues done
**Counts:** [Done] completed, [In Progress] in progress, [Todo] not started, [Total] total
**Status:** [On Track / At Risk / Behind] — [one-sentence justification based on completion % vs. time elapsed]
The on-track/at-risk assessment here is real, not a label someone set on the board. Compare completion percentage against time elapsed: if 30% done with 20% time remaining, that's at risk.
After the quick summary, skip to Step 7 (present to user).
Mode 2: Sprint Breakdown (Full Analysis)
Triggered by: "get sprint breakdown", "sprint breakdown", "sprint health check", "how's the sprint going?"
This is the full analysis. Run all steps (1-7) as documented below.
Mode 3: Update Sprint Status (Pasteable Note)
Triggered by: "update sprint status", "write sprint update", "sprint status note"
Generate a concise, pasteable status update designed to be added to the project board's status/notes field. This is what the user posts for async visibility.
Process:
- Run Steps 1-5 (identify sprint, fetch items, group by goal, analyze signals, assess confidence)
- Read any existing status notes/updates on the project board to understand the update cadence and voice
- Generate the update in this format:
**Sprint [Name] Update — [Date]**
[1-2 sentence overall status. Direct and honest.]
**Goals:**
- ✅ [Goal 1]: [one-line status, what shipped]
- ⚠️ [Goal 2]: [one-line status, what's at risk and why]
- 🔄 [Goal 3]: [one-line status, in progress]
**Risks:**
- [Risk 1 with context, not just "at risk"]
**Wins:**
- [Notable completions this sprint]
**Next up:**
- [What's being worked on in the remaining days]
Present this as a copyable block. The user will paste it into the project board.
Process (Full Breakdown)
Step 1: Identify the current sprint
Query the project board to find the active sprint iteration:
# List project iterations to find current one
gh project field-list {project-number} --owner {org} --format json
Parse iteration fields to find the one whose date range includes today. Extract:
- Sprint name/number
- Start date and end date
- Days remaining
If you can't determine the current sprint programmatically, ask the user.
Step 2: Fetch sprint items
# Get all items in the project with their field values
gh project item-list {project-number} --owner {org} --format json --limit 200
Filter to items assigned to the current sprint iteration. For each item, extract:
- Issue/PR number and title
- Status column (Todo, In Progress, In Review, Done)
- Assignee(s)
- Labels (especially epic/initiative labels)
- Parent issue (if applicable)
Step 3: Group by sprint goal
Sprint goals are the epics or initiative-level issues in the sprint. Group child issues under their parent:
Sprint Goal: "Notification Model for XYZ" (#1234)
├── ✅ #1235 Backend data model (Done)
├── 🔄 #1236 API endpoint (In Progress, PR open)
├── 🔄 #1237 Frontend integration (In Review)
└── ⬜ #1238 E2E tests (Todo)
Items without a parent get grouped under "Ungrouped / Standalone."
Step 4: Analyze activity signals
For each sprint goal and its child issues, fetch recent activity:
Issue comments (within sprint window):
gh issue view {number} --repo {org}/{repo} --json comments
Scan comments for signal:
- Blockers: "blocked by", "waiting on", "can't proceed", "dependency"
- Risks: "found an issue", "more complex than expected", "scope change", "need to revisit"
- Wins: "shipped", "merged", "done", "looks good"
- Updates: DRI status updates, decision notes
Also check the parent/epic issue for updates posted during the sprint window.
Open PR analysis:
gh pr view {number} --repo {org}/{repo} --json state,reviewDecision,reviews,comments,additions,deletions,createdAt,updatedAt
For each open PR, assess:
- Review status: approved, changes requested, no reviews yet
- Staleness: days since last update (>3 days in a 2-week sprint = concern)
- Size: large PRs (>500 lines) late in sprint = risk
- Comment sentiment: active discussion vs. silence vs. unresolved threads
Step 5: Assess confidence per goal
For each sprint goal, synthesize a confidence rating:
| Rating | Criteria |
|---|---|
| ✅ On Track | >50% child issues done, remaining have active PRs with approvals, no blockers in comments |
| ⚠️ At Risk | Open items with stale PRs, blocker language in comments, large scope remaining with <40% sprint left |
| 🔴 Blocked | Explicit blocker identified, dependency not met, no PR activity in 3+ days on critical path items |
| ✅ Complete | All child issues closed/merged |
Include a brief justification for each rating. Reference specific comments, PR states, or patterns that informed the assessment.
Confidence note: When inferring risk from PR activity or comment sentiment, state your confidence level. "PR #456 has been open 5 days with no reviews; this is likely at risk" is better than "this will miss the sprint."
Step 6: Generate the report
## Sprint Status: [Sprint Name] ([Start] → [End], [N] days remaining)
### Summary
- [X] of [Y] sprint goals on track
- [N] items completed, [M] in progress, [K] not started
- [Risks/blockers count] items flagged
---
### [Sprint Goal 1]: [Title] ([#epic](url))
**Status: ⚠️ At Risk**
**DRI:** @{assignee}
| Issue | Status | Assignee | Notes |
|-------|--------|----------|-------|
| [#1235](url) Backend model | ✅ Done | @alice | Merged 5/10 |
| [#1236](url) API endpoint | 🔄 In Progress | @bob | PR open, 1 approval, 1 change request |
| [#1237](url) Frontend | 🔄 In Review | @carol | Large PR (800 lines), opened yesterday |
| [#1238](url) E2E tests | ⬜ Not started | @bob | Depends on #1236 |
**Activity signals:**
- @bob commented on #1236 (5/12): "found a race condition in the job queue, investigating"
- PR #1236 has unresolved review thread about error handling
- #1238 can't start until #1236 merges; with 4 days left, this is tight
**Assessment:** API endpoint has a known issue being investigated. E2E tests are blocked behind it. If the race condition fix takes more than a day, tests won't make this sprint.
---
### [Sprint Goal 2]: [Title] ([#epic](url))
**Status: ✅ On Track**
...
---
### Ungrouped Items
[Items in the sprint without a parent epic]
---
### Risks & Blockers
1. 🔴 [Specific blocker with context and suggested action]
2. ⚠️ [Risk with mitigation suggestion]
### Wins This Sprint
- [Notable completions worth calling out]
Step 7: Present to user
Summarize the key findings conversationally:
Sprint is 60% through. 2 of 4 goals on track, 1 at risk (API endpoint has a race condition, blocking tests), 1 complete. 3 PRs need review attention. Want me to save the full report?
Rules
- Goals over items. The sprint succeeds or fails at the goal level, not the individual issue level. Always frame status in terms of "will this goal be met?"
- Evidence-based assessments. Every confidence rating should cite specific data (PR state, comment, date, staleness). Don't rate on vibes.
- Distinguish inference from fact. "PR has been open 5 days" is fact. "This probably won't merge in time" is inference. Label them differently.
- Don't catastrophize. A stale PR might just mean someone was on PTO. Note the risk but don't assume the worst.
- Actionable flags. Every risk or blocker should come with a suggested action: "needs review", "assignee should update", "scope cut candidate", "escalate dependency."
- Respect the sprint boundary. Only analyze items assigned to the current sprint. Don't pull in backlog items or future sprint work.