agentsclimarketplace

Grace execute

Skill osovv/grace-marketplace/skills/grace/grace-execute

Execute an approved GRACE 4 GraceChangePlan in sequential or parallel-safe mode with recovery-aware preflight and centralized durable apply.From its SKILL.md

Install
npx -y skills add osovv/grace-marketplace --skill grace-execute

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • runs commandsInstructs the agent to run 6 commands, including `grace lint --path PROJECT --assertions current` and 5 more.

SKILL.md

2.9 KB, 600 tokens by cl100k_base, as published. Nobody here has run it

<skill> <preflight> Require one active bundle with approved, identity-matched `spec.xml` and `plan.xml`. Approved plans are immutable. Read context, projections, assertions, scopes, task dependencies, and verification before editing. </preflight>

<assertion_commands>

  • Current validation: grace lint --path PROJECT --assertions current
  • Selected baseline: grace lint --path PROJECT --change C-ID --assertions baseline (add --run-commands when the baseline declares MustPassCommand)
  • Selected target without commands: grace lint --path PROJECT --change C-ID --assertions target
  • Selected target with command evidence: grace lint --path PROJECT --change C-ID --assertions target --run-commands
  • Final end-state validation: grace lint --path PROJECT --change C-ID --assertions final (add --run-commands when the target declares MustPassCommand)
  • Parallel preflight: grace lint --path PROJECT --parallel-preflight </assertion_commands>

<mode_selection> Wait for explicit sequential or parallel-safe choice. Parallel-safe requires the explicit preflight to pass. Workers never mutate approved plans; durable .grace changes are applied centrally after observed work verifies. </mode_selection>

<recovery_decision_table> | state | required action | | clean-to-start | Run selected baseline, then execute tasks. | | partial-observed-writes | Inspect the declared observed scope and ask whether to resume or revert. | | durable-state-changed | Hard stop; supersede and replan. Approved assertions are immutable. | | target-already-satisfied | Run final end-state validation, opted-in command evidence when declared, durable reconciliation, and ask for explicit apply confirmation. | | unsafe-unknown-drift | Hard stop and report unexplained files. | </recovery_decision_table>

<execution_rules>

  1. Run the selected baseline before implementation, including explicit --run-commands when its assertions declare MustPassCommand.
  2. Execute one dependency-ready task or one verified parallel-safe batch at a time.
  3. Run each task's acceptance and verification immediately.
  4. Apply approved durable context, graph, and verification changes centrally.
  5. Reconcile durable state, run plan gates, then run selected --assertions final, including --run-commands when MustPassCommand is declared. Final mode performs full project lint, evaluates the selected target, keeps unrelated approved baselines active, and does not re-evaluate the selected plan's superseded baseline.
  6. Ask for explicit apply confirmation after fresh end-state evidence passes.
  7. Only then set spec and plan to applied and archive the complete bundle.
  8. Never edit approved assertions/scopes/tasks in place, bypass stale evidence, or continue through unknown drift. </execution_rules> </skill>

What ships with it: 1 file

130 B alongside SKILL.md

agents/

Keep looking

Skills are one crate of 325,949. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.