Project mvp
IT project planning Stage 3 — MVP matrix with Impact/Complexity/Stack Risk evaluation, release staging from Prototype to final version, primary KPI with formula, advanced economic model, and system positioning. Run after /project-research. Triggers on: "stage 3", "MVP", "prioritize stories", "KPI", "release plan", "roadmap", "what goes in the MVP", "plan the MVP", "which stories first".From its SKILL.md
npx -y skills add niki8885/claude-project-planner --skill project-mvpAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
9.0 KB, as published. Nobody here has run it
IT Project Planner — Stage 3: MVP Matrix, Release Staging & KPIs
Language rule: Respond in the same language the user writes in. The generated document is always in English.
Input validation
Before starting, verify you have Stage 2 output. You need:
- Project name, description, confirmed variant
- Team composition, stack, complexity level (from Stage 1)
- Full list of User Stories US1–USN with cluster groupings (from Stage 2)
If [ProjectName]-research.md or the user stories are not available, ask:
I need the Stage 2 output to build the MVP plan. Either:
- Paste the User Stories section from
[ProjectName]-research.mdand the Stage 1 Handoff Summary from[ProjectName]-requirements.md, or- Run
/project-research [ProjectName]first if Stage 2 isn't done yet.
Do not proceed without the user stories. Do not invent priorities or stories.
Scoping question
Ask:
What do you want me to produce?
A) MVP Matrix only — evaluate all user stories, mark which go to Prototype and which to later releases. Faster, one document.
B) Full release breakdown — distribute every story across all stages: Prototype → MVP → Post-MVP → Final version. More detailed.
Wait for the answer. Then proceed.
Step 1 — Evaluation Dimensions
Open the document with this section, adapted to the actual project:
## Evaluation Dimensions
- **User Impact**
- High — Critical for core value delivery; removing it breaks the product promise
- Medium — Useful, expected, but the product functions without it at first
- Low — Enhancement, edge case, or niche need
- **Implementation Complexity**
- High — Requires ML / external APIs / hardware / advanced math / unfamiliar technology
- Medium — Standard backend/frontend logic, API integration, data processing
- Low — Basic UI, simple logic, CRUD, configuration
- **Stack Risk**
- Elevated — Story requires technology the team does not yet know
- Normal — Story uses technology the team is comfortable with
Calibrate "High complexity" to the actual stack. If the team is learning Haskell, any Haskell story is High. Solo developer + external API = Elevated risk.
Step 2 — Full Matrix
Every story from Stage 2 must appear. No story may be silently dropped.
| US ID | User Story (short name) | Impact | Complexity | Stack Risk | Priority | Rationale |
|-------|------------------------|--------|------------|------------|----------|-----------|
Priority values — Option A:
Prototype / MVP / Post-MVP / Backlog
Priority values — Option B:
Prototype / MVP / v1.1 / v1.5 / v2.0 / Backlog
Calibration rules:
- Solo dev → elevate complexity by one level for any unfamiliar tech
- Team with role gaps → flag stories that require the missing role
- Educational project → learning technologies go to Prototype regardless of complexity (that's the point)
- High Impact + Low Complexity + Normal Stack Risk → never Backlog without an explicit written reason
Step 3 — Core User Loop
The minimal sequence a user must complete for the product to be worth testing.
[Action 1] → [Action 2] → [Action 3] → [Outcome]
This loop must be fully covered by Prototype stories. If it isn't, move stories up.
Step 4 — Prototype Scope
### Included in Prototype ([N] Stories)
| US | Feature | Role in Core Loop |
|----|---------|------------------|
### Excluded from Prototype
#### Technical Risk
- US#, US# → [reason]
#### External Dependencies
- US#, US# → [reason]
#### Non-Core Features
- US#–US# → enhancements that don't affect whether the core idea works
Step 5 — Full Stage Breakdown (Option B only)
For each release stage:
## [Stage Name] — [Label, e.g. Prototype / MVP / v1.1]
### Goal
[One sentence: what must be true when this stage is complete?]
### Stories
| US | Feature | Rationale |
|----|---------|-----------|
### What this stage proves / delivers
[2–3 sentences on user value or learning unlocked]
### Team requirements
[Which roles needed, what skills exercised, any new tech introduced]
Stages must be realistic for team size — do not stack 20 stories into MVP for a solo developer.
Step 6 — MVP Validation
| Criterion | Status | Explanation |
|-----------|--------|-------------|
| Complete | Yes/No | Full user journey from input to outcome? |
| Minimal | Yes/No | Can any included story be removed without breaking the core loop? |
| Realistic | Yes/No | Achievable given team size, stack, and timeline? |
| Testable | Yes/No | Can real users validate the core hypothesis with what's included? |
Any "No" row must include a recommendation for how to fix it.
Step 7 — Primary KPI
The single most important success metric. Must be:
- Tied directly to the core value proposition from Stage 2
- Measurable at Prototype or MVP stage
- Expressed as a formula where the project domain allows it
## Primary KPI — [Metric Name]
### Definition
[What this measures and why it is the best signal of product success.]
**Formula:**
[Plain text or LaTeX notation]
Variables:
- [var]: [definition]
**Measurement:**
- Unit: [%, seconds, dollars, events/day, etc.]
- Frequency: [daily / per session / per release]
- Source: [user logs / analytics / survey / etc.]
### Business Link
| Aspect | Explanation |
|--------|-------------|
| Value delivered | [What the user gains] |
| Willingness to pay | [Connection to monetization or retention] |
| Differentiation | [How this proves the product's unique claim] |
### KPI Targets
| Stage | Target | Stretch | Justification |
|-------|--------|---------|---------------|
| Prototype | ... | ... | ... |
| MVP | ... | ... | ... |
Step 8 — Advanced KPI / Secondary KPIs
Decision rule — which section to generate:
Use Advanced KPI (mathematical model with formula) if the project measurably reduces or produces something with a countable unit:
- Time saved (hours/day, minutes/task)
- Money saved or earned (cost reduction, revenue increase)
- Error or risk reduced (error rate %, false negative rate)
- Resources optimized (hectares treated, API calls reduced, queries per second)
Use Secondary KPIs (table format) for everything else:
- Dev tools and internal tooling
- Dashboards and analytics viewers
- Educational and learning projects
- Platforms where value is engagement, not economic output
If the project fits the Advanced KPI trigger, add:
## Advanced KPI — Net [Impact] Value
### Definition
Integrates: [gain components] minus [cost/risk components]
### Mathematical Model
[Combined formula]
### Components
#### [Component name]: [Formula + variable definitions]
#### Risk Component: P(missed event) × damage value
#### System Cost: subscription + infra + optional hardware
If the project is a dev tool, educational, or has no clean economic model, replace with:
## Secondary KPIs
| Metric | Definition | Target at MVP | Why It Matters |
|--------|------------|---------------|----------------|
3–5 metrics covering: engagement, quality, performance, and — if educational — a Learning KPI tracking how deeply the target technology was exercised.
Step 9 — System Positioning
## System Positioning
### What [Project Name] IS at Prototype:
- [Capability 1 — what users can actually do]
- [Capability 2]
### What [Project Name] IS NOT at Prototype:
- [Excluded capability — why intentionally excluded]
### What [Project Name] IS at MVP:
- [All prototype capabilities, plus:]
- [New capability]
### What [Project Name] IS NOT at MVP:
- [Still excluded — with rationale]
Be honest. Do not say the Prototype "is" something it only partially implements.
Output: One Document
Save as [ProjectName]-mvp.md
Sections in order:
- Evaluation Dimensions
- Full Matrix
- Core User Loop
- Prototype Scope
- Full Stage Breakdown (Option B only)
- MVP Validation
- Primary KPI
- Advanced KPI / Secondary KPIs
- System Positioning
Closing
After the document is written, tell the user:
Stage 3 complete. Saved as
[ProjectName]-mvp.md.Next:
/project-sprints [ProjectName]— Jira board setup, epics, sprint plan with typed tasks, full task cards with acceptance criteria, team assignment, and system architecture.Note: If you haven't run
/project-interviewsyet, you can still do it now. Interview findings can validate or challenge the priorities set in this MVP plan — useful before committing to the sprint breakdown.