Plumbline plan engine

Skill nickyfactz/plumbline/skills/plumbline-plan-engine

Internal Plumbline engine. Use only after the Plumbline router or a Plumbline phase wrapper selects checkpoint planning.From its SKILL.md

Install
npx -y skills add nickyfactz/plumbline --skill plumbline-plan-engine

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

9.4 KB, as published. Nobody here has run it

Plan engine

Outcome and completion

Create one live implementation plan for one product outcome. The plan is the execution itinerary, not a task transcript or an implementation diary.

Planning is artifact-agnostic. Accept a sufficient external plan or work order without forcing it into Plumbline's file shape.

Use execution_mode: continuous for a new Plumbline plan unless the user explicitly selects Checkpoint Relay. A missing mode in an imported plan also means continuous. When Relay is selected, record execution_mode: checkpoint_relay, load references/checkpoint-relay.md, and plan explicit durable checkpoint boundaries. Do not infer Relay from plan size, host capability, or checkpoint count, and do not put host transport details in the shared plan.

Planning is complete when one controlling plan records the outcome, scope, non-goals, checkpoint dependency order, proof, current checkpoint, lifecycle owner, and one safe next action. Stop after planning; the user or router selects the explicit plumbline-execute phase when implementation is wanted.

Plans cannot override Plumbline lifecycle invariants. A failed attempt keeps the same candidate and objective active until it is accepted or the user explicitly defers or abandons it.

Apply the plan schema's execution-economy rule: a plan may add stricter proof requirements, but it must not mandate reseal, rebuild, or replay for every diagnostic correction when durable inputs and the proof boundary are unchanged.

Read the controlling inputs

Read the active specification, supplied design or work order, repository guidance, canonical documentation, current Git state, validation commands, and the relevant code seams. When creating or updating a Plumbline plan, read references/plan-schema.md and references/artifact-lifecycle.md. Read references/research-policy.md when the plan depends on external capability evidence. Resolve the repository's existing plan location before choosing a blank-repository default of docs/plans/<feature-slug>.md.

Adopt a sufficient external specification, design, handoff, plan, or work order even when it has no Plumbline frontmatter or conventional path. A companion specification or plan is useful only when it materially improves product clarity or recovery. When several artifacts could control the same task, name the competing candidates and the ambiguity; keep one controlling source rather than silently merging them.

Shape meaningful checkpoints

Keep the product outcome whole and use a small number of meaningful checkpoints. Batch adjacent evidence-only, packaging, receipt, and documentation work into its parent implementation checkpoint. Split only for an independent outcome or acceptance gate, rollback boundary, material contract/risk boundary, or distinct owner.

Prefer a vertical slice: one observable behavior carried through the relevant storage, service, interface, and proof seams. Internal implementation may still proceed in layers; the checkpoint is complete when the behavior works as a whole. For each slice, state its observable outcome, completion condition, proof, dependencies, write/review scope, and main-thread join condition.

Use a horizontal checkpoint when a shared contract, migration, build foundation, authentication seam, or other prerequisite genuinely must precede the behavior. Label the prerequisite, identify the downstream slice it unlocks, and keep it minimal. For broad refactors, use expand, migrate in bounded batches, then contract. Never split or merge work merely to satisfy a planning label. Do not split a coherent outcome only to narrate proof steps.

Map every acceptance criterion to a checkpoint. Mark shared contracts and shared files so false parallelism is visible. Within that topology, identify ready independent research, architecture, review, or implementation work and its main-thread join condition for safe parallel waves. Parallelism is useful only when it shortens the path without weakening the contract.

Use the compact checkpoint card from references/plan-schema.md by default. Expand it only for a material boundary. Every plan should answer:

  • What observable behavior or prerequisite is this checkpoint delivering, and what proof obligation makes it complete?
  • What proves completion, and what is the Done when condition?
  • What does it depend on, own, or share?
  • What must the main thread join before downstream work begins?

Keep the live plan as a current-state projection, not an append-only diary. Rewrite the compact card and resume fields in place with current decisions, status, evidence pointers, residuals, and next action. Put raw attempts, transcripts, logs, and superseded approaches in existing supporting evidence or Git history; link the conclusion and do not make historical sections required reading for workers.

Add risk-shaped proof

For a checkpoint involving material state, persistence, concurrency, security, a public contract, or cross-boundary ownership transfer, expose the applicable identity/ownership, transition and terminal-ordering, failure/recovery/ cancellation or shutdown, compatibility, and runtime-proof requirements in one compact scenario-to-proof matrix. Include only relevant rows. This is a risk filter, not a universal checklist and not a reason to create micro-checkpoints.

Carry that matrix into the implementer and QA briefs when it exists. For a material checkpoint, make the checkpoint card or matrix sufficient to form a transient dispatch contract: outcome, invariants and owners, operation or partial-failure boundary, edge behavior, proof, write set, non-goals, and assumptions. Keep it in the prompt; it is not a new durable artifact.

Identify known proof obligations before implementation from acceptance criteria, invariants, contracts, and meaningful regression risks. A new durable behavior discovered during implementation may extend the existing proof/evidence surface; do not create a second testing artifact or a test-count target.

Resolve uncertainty at the right level

Resolve technical boundaries, names, module placement, test seams, and ordinary implementation choices from repository evidence and safe reversible defaults. If an architect finds a material product uncertainty, return a structured escalation to the main orchestrator. The main thread may use the existing Shape conversation inside the active goal, preserve the lifecycle owner, and block only the dependent checkpoint while independent work continues. The escalation does not end the goal or create a competing plan.

Maintain resumable state

Use statuses Pending, In Progress, Blocked, Complete, Reopened, and Superseded when the plan is Plumbline-managed. Keep the compact resume fields and the body synchronized. Before saving a plan update, verify exactly one current checkpoint, matching frontmatter status, and a next_safe_action that points to it. Classify unresolved items as Acceptance blocker, Residual risk, Operational follow-up, or Future enhancement. Blocked and Reopened stop the affected checkpoint and never count as completion. An Acceptance blocker or an unresolved Blocked/Reopened checkpoint prevents Ready for Acceptance; it does not authorize abandoning the objective. Use Superseded only after accepted work or an explicit user-approved defer or abandonment.

Preserve failed attempts

Normalize checkpoint outcomes as follows: CHANGES_REQUIRED reopens the affected checkpoint; INCONCLUSIVE, environment failures, and harness failures block it until Diagnose repairs or replaces the evidence path. Then the same candidate returns through correction and review. P0/P1 severity does not automatically mean rejection, rollback, abandonment, or fresh owner selection. Reject a plan clause that maps severity directly to those terminal actions. If safety requires a rollback, preserve the candidate in durable Git history before the main thread rolls it back; an ignored patch or build output is supporting evidence, not candidate retention. A successor objective is not eligible while the current objective is unresolved.

For a checkpoint with useful delegated work, reserve the compact delegation_roles/delegation_status fields for Execute to carry delegation across compaction. Use not-applicable when no bounded role-owned unit exists; an imported plan may use its existing equivalent state instead of being rewritten into this schema.

Treat changing telemetry as timestamped sample evidence rather than a reason to rewrite stable acceptance. Keep the plan recoverable from the controlling source, specification, Git state, and last verified evidence after compaction. Every artifact or announcement must support recovery, validation, authorization, or ownership; omit the rest.

Create a kickoff or recovery-boundary commit only when the user or repository requires it, recovery across sessions needs it, a material contract is being established, or an auditable approval boundary calls for it. Otherwise keep source, specification, and plan changes uncommitted until the first coherent boundary. Stage only intended files and preserve unrelated dirty work.

Unless the user explicitly requests checkpoint-by-checkpoint execution or a checkpoint contains a deliberate approval gate, the checkpoint sequence is the full execution itinerary. Checkpoints are internal team handoffs, not implicit user pauses.