Stakeholder status update
Skill nicholashidalgo/claude-skillforge/writing/stakeholder-status-update
npx -y skills add nicholashidalgo/claude-skillforge --skill stakeholder-status-updateAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
Writes concise, credible stakeholder updates: status, risks, decisions needed. No puffery.
SKILL.md
3.4 KB, as published. Nobody here has run it
stakeholder-update-writer
Purpose: Convert raw project status into a clear stakeholder update: RAG status, what's done, what's at risk, what needs a decision.
Input Schema
| Field | Type | Required |
|---|---|---|
project_name | string | yes |
period | string | yes - e.g., "Week of March 18" |
rag_status | string | yes - RED/AMBER/GREEN |
completed | string[] | yes |
in_progress | string[] | yes |
risks | string[] | yes |
decisions_needed | string[] | no |
preserve_facts | string[] | yes |
{
"project_name": "Checkout v2",
"period": "Week of March 18",
"rag_status": "AMBER",
"completed": ["Auth integration shipped to staging", "Load test: 50K RPS sustained"],
"in_progress": ["Payment provider switchover (60%)"],
"risks": ["Payment provider API docs are incomplete - may delay switchover by 1 week"],
"decisions_needed": ["Approve 1-week delay or re-scope?"],
"preserve_facts": ["50K RPS", "March 31 deadline", "payment provider: Stripe"]
}
Prompt Flow
Pass 1: Format as RAG + bullets structure. Remove: significance inflation (P1), promotional language (P4), chatbot artifacts (P19), sycophancy (P21), filler (P22), generic conclusions (P24).
Pass 2 Audit + Final: Eliminate any remaining vague attributions or puffery. Every risk must name the specific blocker and owner.
Examples
Short (GREEN status)
Before: "The project is progressing well and we are excited about the outstanding results we are achieving together as a team." After: "GREEN: Auth shipped to staging. Load test passed at 50K RPS. On track for March 31."
Medium (AMBER)
Before: "Despite facing some challenges typical of complex projects, the team continues to demonstrate resilience and commitment as we navigate this journey." After: "AMBER: Payment provider API docs are incomplete. Switchover is at 60% but may slip 1 week. Decision needed by Thursday: approve delay or re-scope the March 31 release?"
Long (RED escalation)
Before: "It is widely believed that the project has encountered some headwinds, and industry observers have noted that integration challenges are not uncommon." After: "RED: Stripe's 3DS2 sandbox is returning 500s on all card-not-present transactions. We're blocked on the payment switchover. Unblocking options: (1) use Stripe test cards only through March 27, (2) switch to Adyen for the launch - needs exec sign-off by EOD Monday."
Unit Tests
# tests/skills/test_stakeholder_update_writer.py
from ai_pattern_scrubber import detect_patterns
GREEN = "GREEN: Auth shipped to staging. Load test passed at 50K RPS. On track for March 31."
AMBER = "AMBER: Payment provider API docs incomplete. Switchover at 60% - may slip 1 week. Decision needed Thursday."
def test_green_no_promotional_language():
assert not [h for h in detect_patterns(GREEN) if h.id == 4]
def test_amber_no_high_severity():
assert not [h for h in detect_patterns(AMBER) if h.severity == "high"]
def test_amber_no_generic_conclusion():
assert not [h for h in detect_patterns(AMBER) if h.id == 24]