项目规划专家 — 支持远期路线图(ROADMAP)和近期任务规划(TODO)的全流程行动指南,集成OKR/SMART/Eisenhower矩阵/MoSCoW等最佳实践方法论,帮助AI Agent产出高质量的项目规划文档From its SKILL.md
npx -y skills add morning-start/agent-skills --skill planningAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
2 things to look at
- no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
- 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
9.9 KB, ~3.7k tokens by cl100k_base, as published. Nobody here has run it
项目规划专家 (Planning Skill)
激活条件
当用户需要以下任一操作时激活:
- 制定或更新项目的远期规划(ROADMAP / 路线图)
- 制定或更新项目的近期任务计划(TODO / 待办清单)
- 设定目标和关键结果(OKR)
- 进行优先级排序或任务分解
- 建立里程碑或进度跟踪机制
意图路由
| 用户意图 | 触发关键词/示例 | 执行子技能 | 核心输出 | 优先级 |
|---|---|---|---|---|
| 🗺️ 远期规划 | "roadmap"/"路线图"/"远期目标"/"季度规划"/"年度计划" | 1-roadmap-planner | ROADMAP.md 文件 | P0 |
| ✅ 近期规划 | "todo"/"待办"/"近期任务"/"本周计划"/"任务分解" | 2-todo-planner | TODO.md 文件 | P0 |
| 🎯 设定OKR | "okr"/"目标与关键结果"/"对齐目标" | 1-roadmap-planner → OKR 章节 | OKR 对齐表 | P1 |
| 📊 优先级排序 | "优先级"/"MoSCoW"/"重要还是紧急"/"排序" | 2-todo-planner → 排序方法 | 优先级矩阵 | P1 |
| 📍 里程碑管理 | "milestone"/"里程碑"/"阶段目标"/"节点" | 1-roadmap-planner → 里程碑 | 里程碑时间轴 | P2 |
| 📈 进度跟踪 | "进度"/"跟踪"/"燃尽图"/"看板"/"健康度" | 见 progress-tracking | 跟踪方案 | P2 |
通用工作流
所有规划任务遵循 ANALYZE → DESIGN → CREATE → VALIDATE → DELIVER 流程:
① ANALYZE(分析需求)
│
├── 明确规划范围(远期 vs 近期?个人 vs 团队?)
├── 收集输入信息(项目现状/战略目标/资源约束/利益相关者)
├── 识别时间跨度(季度/年度/月度/周?)
└── 确定使用的方法论组合(OKR? SMART? MoSCoW?)
│
▼
② DESIGN(设计方案)
│
├── 选择合适的模板(见 [roadmap-templates](references/roadmap-templates.md))
├── 定义目标层级结构(愿景 → 年度目标 → 季度OKR → 月度任务)
├── 设计度量体系(如何衡量成功?)
└── 规划评审节奏(何时回顾和调整?)
│
▼
③ CREATE(生成文档)
│
├── 编写 ROADMAP.md(如需远期规划)
│ ├─ 战略愿景(1-3年方向)
│ ├─ 季度目标(O + KR)
│ ├─ 里程碑时间轴
│ └─ 资源与风险
│
├── 编写 TODO.md(如需近期规划)
│ ├─ 当前冲刺/周期任务
│ ├─ 优先级标记(P0/P1/P2 或 MoSCoW)
│ ├─ 责任人与截止日期
│ └─ 依赖关系与阻塞项
│
└── (可选)生成辅助文档
├─ OKR 对齐表
└─ 进度跟踪配置
│
▼
④ VALIDATE(质量验证)
│
├── SMART 检查(目标是否具体/可衡量/可达成/相关/有时限?)
├── 完整性检查(是否覆盖所有关键维度?)
├── 可行性评估(资源和时间是否合理?)
└── 利益相关者对齐(是否与上级目标一致?)
│
▼
⑤ DELIVER(交付成果)
│
├── 输出最终文档(ROADMAP.md / TODO.md)
├── 提供维护建议(多久更新一次?如何调整?)
└── (可选)建立跟踪机制(看板/仪表盘/定期会议)
质量门禁
必须通过的检查项
对于 ROADMAP.md(远期规划)
- 愿景清晰: 有明确的 1-3 年方向描述
- 目标符合 OKR 标准: O(定性激励性)+ KR(量化可衡量)
- KR 符合 SMART: 具体(S)/可衡量(M)/可实现(A)/相关(R)/有时限(T)
- 时间轴合理: 里程碑分布均匀,无过度集中
- 包含风险评估: 至少标注 3 个关键风险点
- 有明确的负责团队/人
对于 TODO.md(近期规划)
- 任务符合 SMART: 每个任务都明确且可执行
- 优先级清晰: 使用统一的标准(P0-P3 或 MoSCoW)
- 有时间约束: 有明确的截止日期或时间盒
- 责任人明确: 每个任务有 Owner
- 依赖关系可见: 阻塞关系已标注
- 工作量估算: 有预估工时或故事点
推荐验证命令
# 检查 ROADMAP 质量
if [ -f ROADMAP.md ]; then
echo "=== ROADMAP 质量检查 ==="
echo "行数: $(wc -l < ROADMAP.md)"
grep -c "^## " ROADMAP.md # 章节数
grep -ciE "(Q[1-4]|202[0-9]|里程碑)" ROADMAP.md # 时间标记数
fi
# 检查 TODO 质量
if [ -f TODO.md ]; then
echo "=== TODO 质量检查 ==="
echo "任务数: $(grep -c '^- \[' TODO.md)"
grep -cE "\[P[0-3]\]|\[Must\]|\[Should\]" TODO.md # 优先级标记数
grep -cE "@.*\|负责人:" TODO.md # 责任人标记数
fi
知识库索引
| 文件 | 内容概要 | 适用场景 |
|---|---|---|
| okr-methodology.md | OKR完整方法论:目标设定/关键结果编写/对齐机制/评分复盘 | 设定远期目标时必读 |
| smart-principle.md | SMART原则5维实战指南 + 自检清单 | 验证目标质量时使用 |
| roadmap-templates.md | 4类ROADMAP模板(战略型/技术型/功能型/敏捷型) | 选择模板时参考 |
| todo-methods.md | 3种TODO方法(Eisenhower矩阵/MoSCoW/时间盒) | 任务排序时使用 |
| progress-tracking.md | 进度跟踪方法(里程碑/燃尽图/看板/健康度指标) | 建立跟踪机制时参考 |
| planning-examples.md | 不同规模项目的真实规划案例 | 学习参考 |
子技能总览
| # | 子技能 | 核心能力 | 典型输出 | 适用场景 |
|---|---|---|---|---|
| 1 | 1-roadmap-planner | 远期路线图规划 | ROADMAP.md | 季度/年度规划、OKR设定、里程碑定义 |
| 2 | 2-todo-planner | 近期任务规划 | TODO.md | 周/月任务分解、优先级排序、Sprint规划 |
核心方法论速查
🎯 OKR(目标与关键结果)
目标 (Objective): 定性、激励性、回答"我们要做什么"
↓
关键结果 (Key Results): 量化、可衡量、回答"怎么知道做到了"
├─ KR1: 具体指标 + 目标值 + 时间
├─ KR2: 具体指标 + 目标值 + 时间
└─ KR3: 具体指标 + 目标值 + 时间
标准配置: 1-3 个 O,每个 O 对应 2-5 个 KR
周期推荐: 季度(3个月)/ 月度跟踪 / 年度对齐
📖 详见: okr-methodology.md
📏 SMART 原则
| 维度 | 问题 | 检验标准 |
|---|---|---|
| Specific | 要完成什么? | 清晰明确,无歧义 |
| Measurable | 如何衡量? | 可量化(数字/百分比/频率) |
| Achievable | 能做到吗? | 跳一跳够得着,非遥不可及 |
| Relevant | 为什么重要? | 与大目标/战略一致 |
| Time-bound | 何时完成? | 有明确截止日期 |
📖 详见: smart-principle.md
📊 优先级方法对比
| 方法 | 适用场景 | 核心逻辑 | 输出格式 |
|---|---|---|---|
| P0-P3 | 通用任务分级 | 影响力×紧急度 | 4级优先级 |
| MoSCoW | 需求/功能排序 | Must/Should/Could/Won't | 4类标签 |
| Eisenhower | 个人效率 | 重要×紧急 | 4象限矩阵 |
| RICE | 产品功能 | Reach×Impact×Confidence/Effort | 数值评分 |
| WSJF | 敏捷开发 | 价值/Size/Job/Complexity/Failure | 故事点权重 |
📖 详见: todo-methods.md
数据来源
本技能基于以下研究和实践构建:
- 理论来源: OKR (John Doerr/Andy Grove)、SMART (Peter Drucker)、MoSCoW (敏捷开发)
- 实践来源: Atlassian/Google/Intel 的 OKR 实施指南、产品路线图最佳实践(ProcessOn/Lark)
- 工具参考: Jira Roadmap/Trello/Asana/Notion 的规划功能设计
注意事项
⚠️ 核心理念: 本技能产出的是规划文档(ROADMAP/TODO),不是执行计划(那是 Project Manager 的工作)。规划 = "做什么 + 为什么 + 何时",而非 "怎么做"。
⚠️ 规划 vs 计划的区别:
- 规划 (Planning): 战略层面,确定方向、目标、优先级(本技能的范围)
- 计划 (Scheduling): 战术层面,拆解任务、分配资源、排期(超出本技能范围)
⚠️ 动态调整意识: 规划不是静态文档!建议:
- ROADMAP: 季度评审 + 必要时调整
- TODO: 周/双周更新 + 每日站会同步
⚠️ 方法论选择建议:
- 个人项目 → SMART + 简单 TODO 即可
- 小团队 (2-5人) → OKR (简化版) + MoSCoW TODO
- 中大型团队 (5+人) → 完整 OKR + Eisenhower + 看板跟踪
- 企业级 → OKR 全套 + RICE评分 + 仪表盘监控
⚠️ 避免过度规划:
- 规划时间不应超过执行时间的 10%
- 远期规划(>6个月)的细节度应递减
- 保持"现在-接下来-未来"(Now-Next-Later)的三段式结构
版本历史
| 版本 | 日期 | 主要变更 |
|---|---|---|
| v1.0.0 | 2026-05-17 | 🎉 初始版本:完整的规划技能,包含 ROADMAP + TODO 双模块,集成 6 大方法论 |
What ships with it: 7 files
70.5 KB alongside SKILL.md
- INDEX.md5.0 KB
- okr-methodology.md12.1 KB
- planning-examples.md12.3 KB
- progress-tracking.md6.1 KB
- roadmap-templates.md12.9 KB
- smart-principle.md10.8 KB
- todo-methods.md11.3 KB