Skill morning-start/agent-skills/process/project-management/references/planning

项目规划专家 — 支持远期路线图(ROADMAP)和近期任务规划(TODO)的全流程行动指南,集成OKR/SMART/Eisenhower矩阵/MoSCoW等最佳实践方法论,帮助AI Agent产出高质量的项目规划文档From its SKILL.md

Install
npx -y skills add morning-start/agent-skills --skill planning

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

9.9 KB, ~3.7k tokens by cl100k_base, as published. Nobody here has run it

项目规划专家 (Planning Skill)

激活条件

当用户需要以下任一操作时激活:

  • 制定或更新项目的远期规划(ROADMAP / 路线图)
  • 制定或更新项目的近期任务计划(TODO / 待办清单)
  • 设定目标和关键结果(OKR)
  • 进行优先级排序或任务分解
  • 建立里程碑进度跟踪机制

意图路由

用户意图触发关键词/示例执行子技能核心输出优先级
🗺️ 远期规划"roadmap"/"路线图"/"远期目标"/"季度规划"/"年度计划"1-roadmap-plannerROADMAP.md 文件P0
✅ 近期规划"todo"/"待办"/"近期任务"/"本周计划"/"任务分解"2-todo-plannerTODO.md 文件P0
🎯 设定OKR"okr"/"目标与关键结果"/"对齐目标"1-roadmap-planner → OKR 章节OKR 对齐表P1
📊 优先级排序"优先级"/"MoSCoW"/"重要还是紧急"/"排序"2-todo-planner → 排序方法优先级矩阵P1
📍 里程碑管理"milestone"/"里程碑"/"阶段目标"/"节点"1-roadmap-planner → 里程碑里程碑时间轴P2
📈 进度跟踪"进度"/"跟踪"/"燃尽图"/"看板"/"健康度"progress-tracking跟踪方案P2

通用工作流

所有规划任务遵循 ANALYZE → DESIGN → CREATE → VALIDATE → DELIVER 流程:

① ANALYZE(分析需求)
   │
   ├── 明确规划范围(远期 vs 近期?个人 vs 团队?)
   ├── 收集输入信息(项目现状/战略目标/资源约束/利益相关者)
   ├── 识别时间跨度(季度/年度/月度/周?)
   └── 确定使用的方法论组合(OKR? SMART? MoSCoW?)
   │
   ▼
② DESIGN(设计方案)
   │
   ├── 选择合适的模板(见 [roadmap-templates](references/roadmap-templates.md))
   ├── 定义目标层级结构(愿景 → 年度目标 → 季度OKR → 月度任务)
   ├── 设计度量体系(如何衡量成功?)
   └── 规划评审节奏(何时回顾和调整?)
   │
   ▼
③ CREATE(生成文档)
   │
   ├── 编写 ROADMAP.md(如需远期规划)
   │   ├─ 战略愿景(1-3年方向)
   │   ├─ 季度目标(O + KR)
   │   ├─ 里程碑时间轴
   │   └─ 资源与风险
   │
   ├── 编写 TODO.md(如需近期规划)
   │   ├─ 当前冲刺/周期任务
   │   ├─ 优先级标记(P0/P1/P2 或 MoSCoW)
   │   ├─ 责任人与截止日期
   │   └─ 依赖关系与阻塞项
   │
   └── (可选)生成辅助文档
       ├─ OKR 对齐表
       └─ 进度跟踪配置
   │
   ▼
④ VALIDATE(质量验证)
   │
   ├── SMART 检查(目标是否具体/可衡量/可达成/相关/有时限?)
   ├── 完整性检查(是否覆盖所有关键维度?)
   ├── 可行性评估(资源和时间是否合理?)
   └── 利益相关者对齐(是否与上级目标一致?)
   │
   ▼
⑤ DELIVER(交付成果)
   │
   ├── 输出最终文档(ROADMAP.md / TODO.md)
   ├── 提供维护建议(多久更新一次?如何调整?)
   └── (可选)建立跟踪机制(看板/仪表盘/定期会议)

质量门禁

必须通过的检查项

对于 ROADMAP.md(远期规划)

  • 愿景清晰: 有明确的 1-3 年方向描述
  • 目标符合 OKR 标准: O(定性激励性)+ KR(量化可衡量)
  • KR 符合 SMART: 具体(S)/可衡量(M)/可实现(A)/相关(R)/有时限(T)
  • 时间轴合理: 里程碑分布均匀,无过度集中
  • 包含风险评估: 至少标注 3 个关键风险点
  • 有明确的负责团队/人

对于 TODO.md(近期规划)

  • 任务符合 SMART: 每个任务都明确且可执行
  • 优先级清晰: 使用统一的标准(P0-P3 或 MoSCoW)
  • 有时间约束: 有明确的截止日期或时间盒
  • 责任人明确: 每个任务有 Owner
  • 依赖关系可见: 阻塞关系已标注
  • 工作量估算: 有预估工时或故事点

推荐验证命令

# 检查 ROADMAP 质量
if [ -f ROADMAP.md ]; then
  echo "=== ROADMAP 质量检查 ==="
  echo "行数: $(wc -l < ROADMAP.md)"
  grep -c "^## " ROADMAP.md  # 章节数
  grep -ciE "(Q[1-4]|202[0-9]|里程碑)" ROADMAP.md  # 时间标记数
fi

# 检查 TODO 质量
if [ -f TODO.md ]; then
  echo "=== TODO 质量检查 ==="
  echo "任务数: $(grep -c '^- \[' TODO.md)"
  grep -cE "\[P[0-3]\]|\[Must\]|\[Should\]" TODO.md  # 优先级标记数
  grep -cE "@.*\|负责人:" TODO.md  # 责任人标记数
fi

知识库索引

文件内容概要适用场景
okr-methodology.mdOKR完整方法论:目标设定/关键结果编写/对齐机制/评分复盘设定远期目标时必读
smart-principle.mdSMART原则5维实战指南 + 自检清单验证目标质量时使用
roadmap-templates.md4类ROADMAP模板(战略型/技术型/功能型/敏捷型)选择模板时参考
todo-methods.md3种TODO方法(Eisenhower矩阵/MoSCoW/时间盒)任务排序时使用
progress-tracking.md进度跟踪方法(里程碑/燃尽图/看板/健康度指标)建立跟踪机制时参考
planning-examples.md不同规模项目的真实规划案例学习参考

子技能总览

#子技能核心能力典型输出适用场景
11-roadmap-planner远期路线图规划ROADMAP.md季度/年度规划、OKR设定、里程碑定义
22-todo-planner近期任务规划TODO.md周/月任务分解、优先级排序、Sprint规划

核心方法论速查

🎯 OKR(目标与关键结果)

目标 (Objective): 定性、激励性、回答"我们要做什么"
    ↓
关键结果 (Key Results): 量化、可衡量、回答"怎么知道做到了"
    ├─ KR1: 具体指标 + 目标值 + 时间
    ├─ KR2: 具体指标 + 目标值 + 时间
    └─ KR3: 具体指标 + 目标值 + 时间

标准配置: 1-3 个 O,每个 O 对应 2-5 个 KR
周期推荐: 季度(3个月)/ 月度跟踪 / 年度对齐

📖 详见: okr-methodology.md

📏 SMART 原则

维度问题检验标准
Specific要完成什么?清晰明确,无歧义
Measurable如何衡量?可量化(数字/百分比/频率)
Achievable能做到吗?跳一跳够得着,非遥不可及
Relevant为什么重要?与大目标/战略一致
Time-bound何时完成?有明确截止日期

📖 详见: smart-principle.md

📊 优先级方法对比

方法适用场景核心逻辑输出格式
P0-P3通用任务分级影响力×紧急度4级优先级
MoSCoW需求/功能排序Must/Should/Could/Won't4类标签
Eisenhower个人效率重要×紧急4象限矩阵
RICE产品功能Reach×Impact×Confidence/Effort数值评分
WSJF敏捷开发价值/Size/Job/Complexity/Failure故事点权重

📖 详见: todo-methods.md

数据来源

本技能基于以下研究和实践构建:

  • 理论来源: OKR (John Doerr/Andy Grove)、SMART (Peter Drucker)、MoSCoW (敏捷开发)
  • 实践来源: Atlassian/Google/Intel 的 OKR 实施指南、产品路线图最佳实践(ProcessOn/Lark)
  • 工具参考: Jira Roadmap/Trello/Asana/Notion 的规划功能设计

注意事项

⚠️ 核心理念: 本技能产出的是规划文档(ROADMAP/TODO),不是执行计划(那是 Project Manager 的工作)。规划 = "做什么 + 为什么 + 何时",而非 "怎么做"。

⚠️ 规划 vs 计划的区别:

  • 规划 (Planning): 战略层面,确定方向、目标、优先级(本技能的范围)
  • 计划 (Scheduling): 战术层面,拆解任务、分配资源、排期(超出本技能范围)

⚠️ 动态调整意识: 规划不是静态文档!建议:

  • ROADMAP: 季度评审 + 必要时调整
  • TODO: 周/双周更新 + 每日站会同步

⚠️ 方法论选择建议:

  • 个人项目 → SMART + 简单 TODO 即可
  • 小团队 (2-5人) → OKR (简化版) + MoSCoW TODO
  • 中大型团队 (5+人) → 完整 OKR + Eisenhower + 看板跟踪
  • 企业级 → OKR 全套 + RICE评分 + 仪表盘监控

⚠️ 避免过度规划:

  • 规划时间不应超过执行时间的 10%
  • 远期规划(>6个月)的细节度应递减
  • 保持"现在-接下来-未来"(Now-Next-Later)的三段式结构

版本历史

版本日期主要变更
v1.0.02026-05-17🎉 初始版本:完整的规划技能,包含 ROADMAP + TODO 双模块,集成 6 大方法论