Audit preparation
Skill Mattakushi432/Claude-Code-Skills-Custom-DevTools-Pack/plugins/devtools-pack/skills/audit-preparation
When to activate: audit preparation, audit readiness, evidence collection, control documentation, auditor management, compliance audit, SOC audit, ISO audit, external auditFrom its SKILL.md
npx -y skills add Mattakushi432/Claude-Code-Skills-Custom-DevTools-Pack --skill audit-preparationAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
8.3 KB, ~1.7k tokens by cl100k_base, as published. Nobody here has run it
Audit Preparation
Audit Readiness Checklist by Audit Type
SOC 2 Type II
- Trust Service Criteria (TSC) mapped to controls
- Control evidence collected for full audit period (typically 6-12 months)
- Vendor management program documented (SOC reports for critical vendors)
- Logical access reviews conducted at least semi-annually
- Change management process documented with approval evidence
- Incident response policy and incident log maintained
- Vulnerability scanning performed quarterly; penetration test annually
- Business continuity / disaster recovery tested and documented
- Employee background checks and security training documented
- Encryption standards documented for data at rest and in transit
ISO 27001
- Information Security Management System (ISMS) scope defined
- Risk assessment methodology documented and applied
- Statement of Applicability (SoA) completed (114 controls, Annex A)
- Risk treatment plan with residual risk acceptance documented
- Internal audit performed before external certification audit
- Management review meeting held and documented
- All mandatory documented information in place (policies, procedures)
- Corrective actions from prior nonconformities closed
PCI DSS (see also pci-dss.md)
- CDE scope document prepared
- Network diagrams current and accurate
- All 12 requirements assessed with evidence
- Penetration test report current (< 1 year)
- ASV scan reports current (quarterly)
- Patch levels current on all in-scope systems
HIPAA
- Risk analysis completed and documented
- Risk management plan with safeguards implemented
- Workforce training records current (annual)
- Business Associate Agreements in place
- Breach notification procedures documented
- Sanction policy documented and applied
Evidence Collection Strategy
Evidence Repository Structure
audit-evidence/
├── access-control/
│ ├── access-reviews/ # Quarterly access certification records
│ ├── user-provisioning/ # Joiner/mover/leaver records
│ └── privileged-access/ # PAM reports, admin account list
├── change-management/
│ ├── change-tickets/ # Approved change records
│ └── deployment-logs/ # Evidence of change review
├── vulnerability-management/
│ ├── scan-reports/ # Quarterly VA scan results
│ ├── pen-test-reports/ # Annual pen test + remediation
│ └── patch-records/ # Patch application evidence
├── incident-management/
│ ├── incident-log/ # Incident register
│ └── post-mortems/ # Root cause analysis docs
├── training/
│ ├── completion-records/ # Security awareness training completion
│ └── curricula/ # Training content documentation
├── vendor-management/
│ ├── vendor-assessments/ # Third-party risk assessments
│ └── contracts/ # DPAs, BAAs, service agreements
└── policies/
├── current/ # All active policies with review dates
└── prior-versions/ # Historical versions
Evidence Quality Standards
- Date range: Evidence must cover the full audit period
- Completeness: No gaps in periodic control evidence (e.g., monthly log reviews)
- Authenticity: Screenshots with timestamps; system-generated reports preferred over manual
- Traceability: Evidence links to the control it demonstrates
Control Documentation Standards
Control Template
Control ID: CC6.1-01
Control Name: Logical Access Authorization
Control Description: Access to production systems is authorized by the data owner
and IT Security prior to provisioning.
Control Type: Preventive
Frequency: Per event (each access request)
Owner: IT Security
Evidence: Approved access request tickets in ITSM system
Testing Procedure: Select sample of access grants; verify approval prior to provisioning
Sample Size: 25 or 100% if population < 25
Last Tested: [Date]
Deficiencies: None / [Description]
Control Frequency Mapping
| Frequency | Evidence expectation |
|---|---|
| Per event | Sample from population (25+ items or 100% if small) |
| Daily | Evidence for selected days + log summary |
| Weekly | Evidence for selected weeks |
| Monthly | All 12 months (or full audit period) |
| Quarterly | All 4 quarters |
| Annual | Completed once during period |
Auditor Management
Pre-Audit Kickoff Checklist
- Confirm audit scope, period, and objectives
- Introduce key contacts (control owners, IT leads, legal)
- Establish evidence request process (shared folder, naming convention)
- Agree on communication protocol (single point of contact)
- Schedule fieldwork calendar (walkthroughs, interviews, evidence submission)
- Review prior audit findings — status of remediation
Fieldwork Phase
- Designate one internal coordinator per auditor team request
- Respond to evidence requests within agreed SLA (typically 48-72 hours)
- For interview preparation: brief control owners on scope; no coaching on answers
- Keep log of all evidence submitted (filename, control, date submitted)
- Flag any evidence gaps proactively — surprises erode auditor trust
Closeout Phase
- Review draft findings before report is finalized
- For each finding, provide: management response, root cause, remediation plan, target date
- Negotiate finding classification (Major vs Minor vs Observation) with factual evidence
- Track all findings to closure in a remediation register
Evidence Request Response Process
Request Intake Template
Request #: [Auditor ref]
Date received: [Date]
Control(s): [Control IDs]
Evidence requested: [Description]
Period: [Date range]
Assigned to: [Internal owner]
Due date: [Agreed date]
Status: Open / In Progress / Submitted
Date submitted: [Date]
File submitted: [Filename]
Common Evidence Turnaround Times
| Evidence type | Typical prep time |
|---|---|
| System-generated reports | 1-2 hours |
| Access review records | 4-8 hours |
| Policy documents | 1 hour |
| Sampling from ticketing system | 2-4 hours |
| Interview scheduling | 1-2 days |
| Custom queries from DBA | 1-2 days |
Gap Remediation Tracking
Remediation Register
| Finding ID | Description | Severity | Root Cause | Owner | Target Date | Status | Evidence of Closure |
|---|---|---|---|---|---|---|---|
| F-001 | MFA not enforced for VPN | Major | Config gap | IT Sec | [Date] | In progress | |
| F-002 | Annual access review not completed | Minor | Process gap | IT | [Date] | Complete | ticket-1234 |
Severity Definitions
| Level | Definition | Remediation timeline |
|---|---|---|
| Major / Critical | Control failure creates significant risk of material misstatement or data breach | 30-90 days |
| Minor / Significant | Control weakness, compensating controls exist | 90-180 days |
| Observation | Best practice recommendation | Next planning cycle |
Continuous Audit Readiness Program
Monthly Activities
- Review control evidence is being generated and stored
- Check patch levels on critical systems
- Verify access reviews are on schedule
- Review any incidents for control implications
Quarterly Activities
- Run internal control walkthrough (sample 5-10 controls)
- Validate ASV scan completed and results clean
- Update control documentation for any process changes
- Review vendor SOC 2 reports as received
Annual Activities
- Full internal audit against audit framework
- Update risk assessment
- Management review and sign-off on control effectiveness
- Employee security training completion verification
- Penetration test commissioned and completed
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.