agentsclimarketplace

Version upgrade review

Skill LoogacyStudio/skills/plugins/godot-dotnet/skills/version-upgrade-review

This repository stores reusable agent skills, repo level benchmark workflow material, and plugin bundles for coding agents.

Install
npx -y skills add LoogacyStudio/skills --skill version-upgrade-review

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Use when a Godot/.NET task needs a Layer 4 overlay upgrade review that evaluates engine, SDK, C# compatibility, addons/plugins, export pipeline, verification, and rollback risk, then returns a staged sequence instead of a risky all-at-once migration.

SKILL.md

11.0 KB, as published. Nobody here has run it

Version Upgrade Review

Use this skill when a Godot + .NET/C# project needs a risk-aware upgrade plan before changing versions.

This skill is for planning and reviewing upgrades, not for blindly editing every versioned file and hoping the build gods are in a good mood.

Prefer this skill when one strong staged upgrade artifact is enough. Escalate only when explicit migration-quality structure, rollback triggers, and checkpoint-heavy validation are core parts of the ask.

Its job is to:

  • identify the upgrade type and blast radius
  • classify the highest-risk areas before changes begin
  • recommend a staged upgrade order rather than an all-at-once jump
  • account for Godot, .NET SDK, C# compatibility, addons/plugins, and export pipeline implications
  • define smoke, regression, and rollback thinking before execution starts

Purpose

This skill is used to:

  • review the current and target version state
  • assess whether the upgrade is patch, minor, major, SDK, or export-chain affecting
  • identify compatibility risks across engine, project files, packages, addons, and toolchain
  • propose a practical upgrade sequence with validation gates
  • produce an upgrade plan that includes verification checkpoints and rollback considerations

Use this skill when

Invoke this skill for requests such as:

  • planning a Godot engine upgrade
  • moving to a new .NET SDK or target framework
  • checking whether a C# language/runtime change is safe enough
  • reviewing addon or plugin compatibility before migration
  • validating whether export templates or export pipeline tooling may break
  • deciding how to sequence upgrades across engine, SDK, packages, and export settings

Trigger examples

  • "Help me plan the upgrade order for Godot 4.x"
  • "Before upgrading the .NET SDK, I want to understand the risks and validation points"
  • "Will this upgrade break addons or exports?"
  • "I want to upgrade this Godot + C# project without doing everything at once"
  • "Should I upgrade the engine or the SDK first?"

Do not use this skill when

Do not use this skill when:

  • the task is a known, tiny version pin change with no meaningful compatibility risk
  • the user wants direct implementation only and the upgrade path is already approved
  • the request is mainly about debugging a failure that already happened after the upgrade
  • the task is general bug fixing with no version, toolchain, or migration scope
  • the output would just repeat release notes without sequencing, validation, or rollback thinking

Pattern

  • Primary pattern: Generator
  • Secondary pattern: Tool Wrapper, Reviewer

Why this fit is better than the alternatives:

  • the core job is to produce a repeatable structured upgrade plan
  • the skill must also package reusable upgrade heuristics for Godot, .NET, C#, addons/plugins, and export chains
  • the skill includes a review step that highlights high-risk areas before changes are recommended
  • a full Pipeline is unnecessary because the required staged order can live directly in the workflow without extra ceremony

Upgrade domains that must be covered

Every result must explicitly assess the following areas, even if some are low risk:

  1. Godot engine version
  2. .NET SDK and project target changes
  3. C# compatibility implications
  4. addon / plugin compatibility
  5. export pipeline implications
  6. verification strategy
  7. rollback / branch strategy

If an area appears unaffected, say so briefly instead of silently skipping it.

Inputs

Collect or infer these inputs when available:

  • current Godot version and target Godot version
  • current .NET SDK, target SDK, current target framework, and proposed target framework
  • notable C# language or API compatibility constraints
  • addon, plugin, NuGet package, and tool dependencies that may be version-sensitive
  • current export targets, export templates, CI/export scripts, and distribution pipeline assumptions
  • recent pain points, known fragile scenes, build steps, or platform-specific constraints
  • desired risk appetite: conservative staged path vs faster migration path
  • whether the user wants a planning artifact only or also wants follow-up implementation later

If the current or target state is materially missing, ask for the smallest missing version facts before finalizing the sequence.

Workflow

Follow this sequence every time.

1. Confirm current state and target state

State the important version facts first.

At minimum, confirm:

  • current engine/toolchain state
  • target engine/toolchain state
  • whether the move is patch, minor, major, SDK, target-framework, or export-chain affecting

Do not start recommending order before the source and destination are clear.

2. Classify the upgrade scope

Classify the change using one or more of these buckets:

  • patch — bug-fix level version movement that still deserves verification
  • minor — feature/behavior change with moderate compatibility risk
  • major — migration-level change with meaningful API, tooling, or behavior risk
  • SDK / target — .NET SDK, target framework, language version, or build toolchain movement
  • export chain — export templates, platform exporters, CI packaging, signing, or deployment changes

Explain why the classification matters.

Do not assume a minor upgrade is painless. Minor releases are perfectly capable of creative mischief.

3. Map the risk areas

Review each required domain and identify the highest-risk seams.

Look for risks such as:

  • Godot project format or editor behavior changes
  • API shifts affecting C# code or generated bindings
  • target framework support drift in SDK, NuGet packages, or IDE tooling
  • nullable, language version, analyzer, or source-generator behavior changes
  • addon/plugin version ranges, undocumented breakage, or maintenance gaps
  • export preset, template, platform SDK, signing, and packaging drift
  • CI or local environment mismatches between old and new toolchains

Separate high-risk blockers from likely follow-up cleanup. Do not frame every warning as a release blocker.

4. Propose a staged upgrade sequence

Recommend the safest practical order.

The sequence should usually favor:

  1. branch and rollback preparation
  2. baseline verification on the current version
  3. the smallest foundational toolchain upgrade that unlocks later work
  4. one major compatibility surface at a time
  5. smoke verification after each step
  6. regression checks on the most fragile paths before moving to the next step

If a combined step is acceptable, explain why it is safe enough.

The output must show stepwise upgrade thinking. Avoid all-at-once migrations unless the evidence strongly supports it.

5. Define smoke and regression checkpoints

For each meaningful step, recommend the smallest useful validation.

Cover at least:

  • project open / import / editor startup
  • restore / build / run
  • one or more critical scenes or flows
  • addon/plugin dependent paths
  • export pipeline baseline for at least one important target
  • any path known to be historically fragile

Prefer high-signal checks over giant wish lists.

6. Define rollback and branch strategy

Every plan must include rollback thinking.

At minimum, address:

  • recommended branch or checkpoint structure
  • when to tag or snapshot the pre-upgrade state
  • what signals should trigger rollback vs continue with fixes
  • whether rollback should be full, partial, or step-local
  • how to preserve comparison evidence between old and new behavior

Do not plan upgrades as if failure is impossible.

7. Return the upgrade plan

Return the result using assets/upgrade-plan.md.

The plan should:

  • summarize the current and target state
  • classify the upgrade scope clearly
  • identify the main risks
  • recommend an ordered sequence
  • include validation checkpoints
  • include rollback considerations

Output contract

Return the result using assets/upgrade-plan.md in this section order:

  • Current state
  • Target state
  • Upgrade scope
  • Risk areas
  • Recommended sequence
  • Validation checklist
  • Rollback considerations

Output rules:

  • prefer ordered steps over broad advice
  • explicitly distinguish high-risk areas from lower-risk follow-up work
  • do not recommend upgrading everything at once by default
  • do not treat migration work as ordinary bug fixing
  • do not stop at version numbers; always include validation and rollback thinking
  • mention third-party dependencies explicitly when they materially affect risk
  • keep the output staged and section-aligned so each upgrade step has an obvious validation and rollback context

Upgrade heuristics

  • Prefer one major compatibility surface at a time when risk is moderate or high.
  • Confirm the current baseline before the first upgrade step so later failures have meaning.
  • If engine and SDK changes are both significant, avoid moving both at once unless one is a hard prerequisite.
  • Treat export and deployment as a separate compatibility surface, not as an afterthought.
  • A green local build is not enough if editor import, addons, or export templates can still fail.
  • If a dependency has unclear compatibility status, downgrade confidence and isolate that change.
  • Resolve blockers first, warnings second, nice-to-have cleanup last.

Companion files

  • assets/upgrade-plan.md — reusable template for the final upgrade plan
  • references/migration-notes.md — risk categories, pre-upgrade inventory prompts, addon/plugin and export-chain notes, and smoke test ideas

Validation

A good result should satisfy all of the following:

  • current and target states are explicit enough to reason about
  • the upgrade type is classified correctly
  • all seven upgrade domains are considered explicitly
  • high-risk areas are identified and explained
  • the sequence is staged rather than all-at-once by default
  • validation checkpoints are tied to meaningful risk
  • rollback thinking is concrete rather than ceremonial
  • third-party dependencies are not ignored

Common pitfalls

  • assuming a minor upgrade is automatically safe
  • collapsing Godot, SDK, addon, and export changes into one giant step
  • treating migration work like an ordinary bug-fix patch
  • planning only the version changes and forgetting verification
  • ignoring third-party dependency compatibility or maintenance status
  • trying to clear every warning before confirming the main upgrade path works
  • having no branch, tag, or rollback checkpoint

Completion rule

This skill is complete when the agent has:

  • confirmed the current and target states
  • classified the upgrade scope accurately
  • identified the highest-risk compatibility areas
  • proposed a staged upgrade order
  • defined smoke and regression checks for the important steps
  • included rollback and branch strategy thinking
  • returned a structured upgrade plan rather than loose upgrade advice

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.