agentsclimarketplace

Monitor progress

Skill KirKruglov/claude-project-manager/skills/monitor-progress

AI Project Manager plugin for Claude Cowork — full project lifecycle automation: charter, plan, risks, budget, monitoring, comms, closure. 21 skills, PMBoK + Agile.

Install
npx -y skills add KirKruglov/claude-project-manager --skill monitor-progress

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 5 stars5 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Monitors project progress across 6 operational modes: sprint progress report, deviation check (schedule vs budget), launch stream synchronization, actual data collection for project closure, weekly status report (scheduled), and daily deviation check (scheduled). Reads project-plan, project-budget, and Jira data to produce structured reports. Triggers email notifications via send-email for deviations (level 2 draft) and weekly status (level 1 autonomous). Falls back to file-only output if Jira MCP is unavailable. Covers PM tasks #18, #19, #25, #28 and scheduled tasks weekly-status (Р1) and daily-deviation (Р2). Triggers EN: 'check progress', 'project status', 'weekly report'.

SKILL.md

13.4 KB, as published. Nobody here has run it

Skill: monitor-progress

Monitors project execution across 6 modes — from sprint progress tracking to stream synchronization and final data collection. Reads Jira, project-plan, and project-budget. Generates structured reports; triggers email notifications for deviations and weekly status. Falls back gracefully when Jira is unavailable.


Triggers

Russian: «проверь прогресс», «статус проекта», «отчёт по прогрессу», «еженедельный отчёт», «проверь отклонения», «отклонения по срокам/бюджету», «синхронизация потоков», «собери фактические данные», «данные для закрытия» English: "check progress", "project status", "progress report", "weekly status", "check deviations", "deviation report", "sync streams", "collect actual data", "closing data"


Language Detection

  • Request in Russian → templates *-ru.md, all outputs in Russian
  • Otherwise → templates *-en.md, all outputs in English

Modes

ModeTaskPhaseTrigger typeOutput
progress-report#184commandprogress-report-{date}.md
deviation-check#194command / schedule (daily)deviation-report-{date}.md + email E4
sync-streams#255command / schedule (weekly Mon, phase 5 only)sync-report-{date}.md + email E5
actual-data#286commandactual-data-report.xlsx (schema)
weekly-statusР13–5scheduled (Mon 9:00)weekly-status-{date}.md + email E7
daily-deviationР23–5scheduled (Mon–Fri 9:00)daily-deviation-{date}.md

Input

DataRequiredSource
Mode (explicit or inferred)yesPM in chat or scheduled task prompt
project-state.mdyesproject root
project-plan.mdyes (most modes)02-planning/
project-budget.xlsxfor deviation/closure02-planning/
Jira sprint datapreferredJira MCP (fallback: PM provides manually)
Stream reports (sync-streams)yesreports/ — latest progress-report-*.md
All Jira data (actual-data)yesJira MCP (fallback: PM provides)

Output

FilePathMode
progress-report-{date}.mdreports/progress-report
deviation-report-{date}.mdreports/deviation-check, daily-deviation
sync-report-{date}.mdreports/sync-streams
actual-data-report.xlsx06-closure/actual-data
weekly-status-{date}.mdreports/weekly-status
Email E4 (deviation deadline)via send-emaildeviation-check (level 2)
Email E5 (stream sync)via send-emailsync-streams (level 2)
Email E7 (weekly status)via send-emailweekly-status (level 1)

Instructions

Step 1 — Determine Mode

Determine the mode from the PM's request or the scheduled task prompt.

CuesMode
"progress", "sprint tasks", "what's done", "task status"progress-report
"deviations", "overdue", "behind schedule", "over budget"deviation-check
"stream sync", "launch streams", "dev/marketing/ops status"sync-streams
"actual data", "closing data", "final figures", "project closure"actual-data
"weekly status", "weekly report", "статус недели", "еженедельный отчёт" — or scheduled prompt contains "weekly-status"weekly-status
"daily check", "daily deviation", "ежедневная проверка" — or scheduled prompt contains "daily-deviation"daily-deviation

If mode is ambiguous and the request came from PM in chat → ask: "Which report do you need?

  1. Sprint progress — task completion status (Phase 4)
  2. Deviation check — schedule and budget deviations (Phase 4)
  3. Stream sync — dev/marketing/ops synchronization (Phase 5)
  4. Actual data — final figures for project closure (Phase 6)"

Phase validation:

  • sync-streams: only available in Phase 5. If current phase ≠ 5 → inform PM and stop. Message: "sync-streams is only available in Phase 5 (Launch). Current phase: {PHASE}. If you need current sprint progress data, use progress-report mode instead."
  • actual-data: only available in Phase 6. If current phase ≠ 6 → inform PM and stop. Message: "actual-data collection is only available in Phase 6 (Closure). Current phase: {PHASE}."

Step 2 — Read Project Context

Always read:

  • project-state.md → project name, current phase, sprint number, last update date

Read per mode:

ModeFiles to read
progress-report02-planning/project-plan.md
deviation-check, daily-deviation02-planning/project-plan.md, 02-planning/project-budget.xlsx
sync-streamslatest reports/progress-report-*.md (last 1–2), 03-execution/launch-checklist.md
actual-data02-planning/project-plan.md, 02-planning/project-budget.xlsx
weekly-status02-planning/project-plan.md, latest reports/progress-report-*.md (if exists)

If files are not found → continue with available data, note missing files in the report with placeholder [DATA NOT AVAILABLE — fill manually].


Step 3 — Query Jira (if available)

Attempt to retrieve data via Jira MCP:

ModeWhat to query
progress-reportCurrent sprint tasks — status, assignee, completion %
deviation-check, daily-deviationOverdue tasks, tasks at risk (due within 3 days)
sync-streamsOpen tasks by epic/label per stream (dev, marketing, ops)
actual-dataAll closed tasks: actual hours, completion dates, story points
weekly-statusSprint velocity, completed vs planned, overdue count

Fallback if Jira MCP unavailable:

  • Continue without Jira data
  • Mark all Jira-dependent fields with the language-matched placeholder:
    • EN: [JIRA DATA UNAVAILABLE — fill manually]
    • RU: [JIRA НЕДОСТУПЕН — заполнить вручную]
  • Notify in chat (match detected language):
    • EN: "Jira MCP unavailable — report generated with placeholders. Fill in Jira sections manually."
    • RU: "Jira MCP недоступен — отчёт сгенерирован с плейсхолдерами. Заполни разделы Jira вручную."

Step 4 — Generate Report

Load the template matching mode and language:

ModeTemplate (EN)Template (RU)
progress-reporttemplates/progress-report-template-en.mdtemplates/progress-report-template-ru.md
deviation-check, daily-deviationtemplates/deviation-report-template-en.mdtemplates/deviation-report-template-ru.md
sync-streamstemplates/sync-report-template-en.mdtemplates/sync-report-template-ru.md
actual-datatemplates/actual-data-report-schema.md(same, bilingual schema)
weekly-statustemplates/weekly-status-template-en.mdtemplates/weekly-status-template-ru.md

Populate all template sections with data from Step 2 + Step 3.

Deviation assessment rules:

  • Schedule deviation: task overdue by >0 days → flag as deviation
  • Budget deviation: actual spend > planned by >5% → flag as deviation
  • Critical threshold: >10% schedule delay or >10% budget overrun → mark as CRITICAL
  • No deviations found → for deviation-check and daily-deviation: write to logs/log.md "no deviations" and STOP (do not generate report file)

For actual-data mode:

  • Output is an xlsx schema — generate the schema structure per templates/actual-data-report-schema.md
  • Save as 06-closure/actual-data-report.xlsx (structure only; PM fills actual values from populated template or Jira export)

Step 5 — Handle Email (where applicable)

ModeEmail templateAutonomy levelCondition
deviation-checkemail-tpl-deviation-deadline-{lang}.md2 (draft for PM)Deviations found
sync-streamsemail-tpl-deviation-sync-{lang}.md2 (draft for PM)Desync detected
weekly-statusemail-tpl-weekly-status-{lang}.md1 (autonomous)Always
daily-deviationNone (no email)

Level 1 (autonomous): Generate email draft → pass to send-email for immediate dispatch. Level 2 (draft): Generate email draft in reports/email-draft-{mode}-{date}.md → notify PM: "Email draft ready — review and confirm before sending via send-email."

Load the matching email template, populate with report key findings, recipients from 01-initiation/stakeholder-map.md (or comm-plan.md).


Step 6 — Save Files and Update State

  1. Save the report file to the correct path (see Output table).
  2. For actual-data mode: save 06-closure/actual-data-report.xlsx schema.
  3. Update project-state.md:
    • Add artifact record with status completed and date.
    • For weekly-status: update field last_weekly_report.
    • For deviation-check/daily-deviation: update field last_deviation_check.
  4. Write to logs/log.md: {DATE}: monitor-progress [{MODE}] — {RESULT}. Saved: reports/{FILENAME}
    • RESULT examples: "3 deviations found", "no deviations", "report generated", "Jira unavailable — manual fill needed"
  5. Output to chat:
    • File saved path
    • Key findings summary (2–5 bullet points)
    • Email action (if applicable): "Email draft ready at reports/email-draft-{mode}-{date}.md"
    • If deviations are critical: "⚠️ CRITICAL deviation detected — immediate PM attention required."

Templates

FilePurpose
templates/progress-report-template-en.mdSprint progress report (EN) — Task #18
templates/progress-report-template-ru.mdSprint progress report (RU) — Task #18
templates/deviation-report-template-en.mdDeviation report (EN) — Task #19, Р2
templates/deviation-report-template-ru.mdDeviation report (RU) — Task #19, Р2
templates/weekly-status-template-en.mdWeekly status report (EN) — Р1
templates/weekly-status-template-ru.mdWeekly status report (RU) — Р1
templates/sync-report-template-en.mdStream sync report (EN) — Task #25
templates/sync-report-template-ru.mdStream sync report (RU) — Task #25
templates/actual-data-report-schema.mdxlsx schema for actual data collection — Task #28
templates/email-tpl-deviation-deadline-en.mdEmail E4 — deviation notification (EN)
templates/email-tpl-deviation-deadline-ru.mdEmail E4 — deviation notification (RU)
templates/email-tpl-deviation-sync-en.mdEmail E5 — stream desync notification (EN)
templates/email-tpl-deviation-sync-ru.mdEmail E5 — stream desync notification (RU)
templates/email-tpl-weekly-status-en.mdEmail E7 — weekly status distribution (EN)
templates/email-tpl-weekly-status-ru.mdEmail E7 — weekly status distribution (RU)

Dependencies

Reads (required):

  • project-state.md — project name, phase, sprint number
  • 02-planning/project-plan.md — planned milestones, tasks, deadlines
  • 02-planning/project-budget.xlsx — budget plan (deviation modes)

Reads (optional):

  • 01-initiation/stakeholder-map.md — email recipients
  • 02-planning/comm-plan.md — communication preferences
  • reports/progress-report-*.md — previous reports for trend comparison
  • 03-execution/launch-checklist.md — launch readiness (sync-streams)

External actions:

  • Jira MCP — sprint and task data (fallback: PM provides manually)
  • send-email skill — email dispatch (E4 level 2, E5 level 2, E7 level 1)

Writes:

  • reports/progress-report-{date}.md
  • reports/deviation-report-{date}.md
  • reports/sync-report-{date}.md
  • reports/weekly-status-{date}.md
  • reports/daily-deviation-{date}.md
  • 06-closure/actual-data-report.xlsx
  • project-state.md (status update)
  • logs/log.md (action record)

Constraints

  • sync-streams mode is only available in Phase 5
  • actual-data mode is only available in Phase 6
  • Does NOT make decisions about deviations — generates report and notifies PM
  • Does NOT update project-plan.md — PM decides how to respond to deviations
  • For deviation-check and daily-deviation: if no deviations found, logs the check and stops — no report file created
  • Fallback mode does not block report generation — produces report with placeholders
  • One invocation = one mode; do not combine modes in a single run
  • Email for weekly-status (E7, level 1) is sent autonomously — no PM confirmation required
  • Email for deviation-check (E4) and sync-streams (E5) are level 2 — PM must confirm before sending

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.