agentsclimarketplace

Workflow ship and observe

Skill kensaurus/cursor-kenji/skills/workflow-ship-and-observe

Take merged, repository-green code all the way to a verified, monitored production release for any app stack. Confirm the target and the exact source revision, deploy (or trigger the deploy pipeline), verify the intended revision is actually live, smoke-test critical flows against production, then watch error/latency signals through a defined stability window and either confirm stable or execute an explicit rollback/hotfix. Use when "ship it", "deploy to production", "release this", "go live", "roll this out", "promote to prod", or "cut a release" for a running application (not an npm package — use deploy-npm for that). Complements deploy-verify with the observe-and-roll- back tail.From its SKILL.md

Install
npx -y skills add kensaurus/cursor-kenji --skill workflow-ship-and-observe

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 6 stars6 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its file declares

Copied from the file, not written here

The file declares its own license as MIT. That is the author’s claim about this one file, and it is not the same thing as the license GitHub reports for the repository, which is listed with the other numbers below.

SKILL.md

6.4 KB, ~1.4k tokens by cl100k_base, as published. Nobody here has run it

workflow-ship-and-observe — Release, Verify, Observe, Roll Back

Shipping is not merging. A release is done only when the intended revision is live on the confirmed target, production smoke checks pass, and a defined monitoring window elapses without crossing rollback thresholds — or a rollback/hotfix has been executed.

Prove the deployed revision, then watch it. A 200 from a URL is not proof that your code is live, and "it deployed" is not proof that it is healthy.

Before any browser action, read protocol-browser-anti-stall.

Phase 0 — Pin the target and the revision

Never guess where or what you are shipping. Establish:

  1. Source revision — the exact commit SHA to release. Confirm it is merged and that the repository is green (route to workflow-green-repo / complete-everything if not). Record the SHA.
  2. Target environment — which environment and provider. Discover from the repo, do not assume: vercel.json, netlify.toml, fly.toml, Dockerfile, render.yaml, Kubernetes manifests, GitHub Actions deploy workflows, app.json/EAS, supabase/config.toml, Terraform. Confirm the environment (staging vs production) with the user once and reuse it.
  3. Deploy mechanism — CI-on-merge, a manual pipeline trigger, or a CLI command. Identify the exact command/workflow and how to read its status.
  4. Backend dependencies — migrations, edge functions, RLS, buckets, secrets, cron. Per full-stack-ship-discipline, these must deploy and be verified alongside the frontend. Non-destructive schema required by the approved release ships without re-asking on a confirmed target; destructive data operations always ask first.
  5. Rollback plan — the concrete, executable way to revert this target (previous deployment promotion, image/tag rollback, revert-and-redeploy, migration down-path). If no rollback exists, say so before shipping.
  6. Signals — where errors and latency are observed (Sentry, provider logs, Supabase logs/advisors, uptime checks) and the thresholds that mean "roll back."

Write .cursor/ship-state.md:

# Ship & Observe: <app> → <environment>
Revision: <sha>
Target/provider: <name>
Deploy: <command/workflow>
Rollback: <exact procedure>
Monitor window: <duration> · thresholds: <error rate / latency / crash-free>

## Steps
- [ ] preflight: repo green + revision confirmed
- [ ] backend deps deployed + verified
- [ ] deploy triggered
- [ ] deployed revision matches <sha>
- [ ] production smoke: <critical flows>
- [ ] monitoring window elapsed within thresholds
- [ ] stable OR rollback/hotfix executed

## Evidence
- <step>: <command/result>

Phase 1 — Preflight

  • Confirm the release SHA is merged and green. Do not ship red or unmerged code.
  • Deploy and verify backend dependencies first, so the frontend does not hit a missing table/function on first request. Verify objects exist as the role the client uses.
  • Confirm the rollback procedure is real and, where possible, dry-run it.

Phase 2 — Deploy

  • Trigger the deploy via the identified mechanism. Never hand-edit production state outside the pipeline.
  • Wait for the deploy to reach a terminal state; capture the build/deploy logs. A failed or partial deploy is a stop-and-fix, not a proceed.

Phase 3 — Verify the revision is live

  • Confirm the deployed revision equals the intended SHA — via the provider's deployment metadata, a /version/build-id endpoint, a build stamp, or asset hashes. A reachable URL alone is not proof.
  • Run production smoke checks on the critical flows: real navigation, auth, a primary read and a primary write path. Capture console, network (2xx where expected), and screenshots as evidence. Keep artifacts under .playwright-mcp/.

Phase 4 — Observe the stability window

  • Watch the defined signals for the agreed window (scale it to release risk).
  • Track error rate/new issues (Sentry), latency and 5xx (provider/Supabase logs), new ERROR advisors, and crash-free rate for mobile.
  • Crossing a threshold triggers Phase 5. Not crossing it after the window elapses is the only path to a "stable" claim.

Phase 5 — Roll back or hotfix (only if a threshold is crossed)

  • If signals breach thresholds: execute the rollback procedure immediately, confirm the prior healthy revision is live, and re-verify smoke checks.
  • If forward-fix is clearly faster and safer than rollback, ship a hotfix through the same pipeline and re-enter Phase 3. Record the decision and why.
  • Never leave production in a known-bad state to "monitor more."

Phase 6 — Report

## Ship & Observe — report
Released: <sha> → <environment/provider>
### Result: STABLE | ROLLED BACK | HOTFIXED | BLOCKED
### Evidence
- deploy: <log/status>
- revision live: <how confirmed> = <sha>
- smoke: <flows> → <result + artifacts>
- monitoring: <window> → error rate <x>, latency <y>, crash-free <z>
### Rollback/hotfix (if any)
- trigger: <threshold crossed> → action: <what ran> → outcome
### Follow-ups
- none | <tracked item>

Completion level is deployed-verified after Phase 3 and observed-stable only after Phase 4 passes. Do not claim stability from a single smoke test.

Related

  • deploy-verify — the post-deploy smoke methodology this skill builds on
  • deploy-npm — for npm package releases (not app deployments)
  • full-stack-ship-discipline — backend must deploy and be verified too
  • iterate-post-launch — turn observed production signals into the next fixes
  • workflow-feedback-to-closure — route rollback/incident findings into tickets
  • verification-before-completion — deployed-verified vs observed-stable levels

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 326,736. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.