agentsclimarketplace

Test plan

Skill katalon-labs/true-skills/skills/test-plan

Install
npx -y skills add katalon-labs/true-skills --skill test-plan

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 3 stars3 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Plan Katalon True Platform/TestOps testing for a release, sprint, or feature. Use when you need to translate quality goals into scope, prioritize testing by requirement coverage and risk, decide what to test first, or build the executable plan structure (folders, suites, and sprint/release association) that stands in for a formal Test Plan. Reads project/repository/iteration context and requirement coverage, then proposes and materializes a prioritized plan. For designing the actual test cases, hand off to create-test-cases; for the ship/no-ship call, hand off to release-analyze.

SKILL.md

4.4 KB, as published. Nobody here has run it

Katalon Test Plan

Use this skill for the planning stage of the Katalon lifecycle: turn quality goals into a scoped, risk-prioritized, executable plan. The output is a plan the team can act on plus the folder/suite/release structure that makes it runnable. Prefer Katalon MCP tools for platform data; use the human as a tool when scope, risk appetite, or release target cannot be resolved safely.

Availability Boundary

State the boundary before promising a plan:

  • Available via MCP: resolve scope (list_projects, list_repositories, find_iterations), read requirement coverage and gaps (fetch_requirement_data, find_requirements, find_test_cases_by_requirement), and build the executable plan structure (manage_test_folder, manage_test_suite, add cases to suites).
  • Not directly available: create a Release or Build entity, create a formal Test Plan entity, or author release gates through MCP. These live in the TestOps UI.
  • Workaround (the MCP-legal test plan): a named folder + test suite associated with a sprint/release is the executable plan. Create it, populate it, and report it as the plan of record.

Planning Workflow

+---------------+     +----------------------+     +----------------------+
| Resolve scope | --> | Read coverage + risk | --> | Prioritize what first|
+---------------+     +----------------------+     +----------------------+
        |                        |                             |
        v                        v                             v
+---------------+     +----------------------+     +----------------------+
| Propose plan  | --> | Build folder + suite | --> | Associate sprint/rel |
+---------------+     +----------------------+     +----------------------+

Steps and tool rules

  1. Resolve scope. list_projects -> list_repositories. If exactly one matches the user's wording or context, use it. Use find_iterations to bind the plan to a sprint/release when named.
  2. Read coverage and gaps. Use fetch_requirement_data for requirement coverage status and find_test_cases_by_requirement to see which requirements already have cases. find_requirements / read_requirement when requirement keys are supplied.
  3. Prioritize by risk and evidence. Rank scope using: requirement coverage gaps first, then high-change/high-traffic areas, then areas with historically unstable tests (defer stability detail to test-review). State the risk basis; do not invent traffic numbers the MCP does not return.
  4. Propose the plan in chat. Objectives, in-scope / out-of-scope, coverage matrix (requirement -> planned cases), risk ranking, target environments, and the suite/folder structure you will create.
  5. Materialize the executable structure. manage_test_folder for the plan folder, manage_test_suite for the runnable suite, add the selected/known cases. Reuse an existing folder/suite when one already matches instead of creating a duplicate.
  6. Verify and report. read_test_suite to confirm; report the plan of record with the suite as the executable artifact and the open gaps to fill next.

Prompt recipes

  • Plan testing for sprint 3.2 in project Cellphone Shop: show coverage gaps and build the executable suite.
  • What should we test first for release R-2026-Q3 based on requirement coverage? Propose a risk-ranked plan.
  • Create a test plan structure (folder + suite) for requirement CEL-6 and associate it with the current sprint.

Hand-offs

  • Gaps to fill -> create-test-cases.
  • Plan ready to run -> execute-test.
  • Ship decision on the planned scope -> release-analyze.
  • Traceability audit of the plan -> test-management.

Read references/planning-workflow.md before proposing scope. Read the orchestrator true-platform-testing/references/unavailable-capabilities.md when the user asks "can Katalon plan X?".

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.