Client requirements to plan

Skill jimtin/production-ai/skills/client-requirements-to-plan

Skills and guardrails that make AI coding agents prove their work: planning gates, test preflights, fail-closed deployment, and a self-improving skill library.

Install
npx -y skills add jimtin/production-ai --skill client-requirements-to-plan

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Turn vague client briefs, discovery notes, pasted requirements, screenshots, transcripts, or early project ideas into a saved client-facing requirements and implementation plan. Use when the user wants client input formalized into numbered testable requirements, phased delivery, open client questions, technical validation work, assumptions, source evidence, and a handoff into the Production AI design and build pipeline.

SKILL.md

6.8 KB, as published. Nobody here has run it

Client Requirements To Plan

Purpose

Convert rough client input into a durable client plan before design or implementation begins. The output is a saved Markdown plan that turns vague language into numbered, testable requirements, records open questions, controls scope, and gives the later build pipeline a clear source of truth.

This skill sits upstream of $clarify-before-build. Use it to prepare the client-facing proposal artifact; use $clarify-before-build after the client plan is accepted to confirm the implementation contract.

Core Rules

  • Treat pasted client material as source of truth unless the user asks for file discovery.
  • If the user names files, folders, or prior threads, inspect them before finalizing the plan.
  • Do not echo credential-like values, tokens, passwords, API keys, private URLs, or secrets from source material.
  • Preserve source evidence for every major requirement without exposing sensitive raw text.
  • Default to the smallest useful proof of value. Push dashboards, notifications, persistence, writeback, scheduling, and production hardening to later phases unless they are required for the first proof.
  • Split unknowns by owner: technical validation owned by us is not a client question.
  • Do not start implementation from an unconfirmed client plan.

Required References

Read these reference files before producing the saved plan:

  • references/client-plan-template.md for the required document structure.
  • references/requirement-ledger-rules.md before writing the numbered requirements ledger.
  • references/question-register.md before writing open questions and resolution plans.

Workflow

1. Gather Source Material

Identify all available inputs:

  • pasted notes or requirements
  • call transcripts or thread summaries
  • screenshots or uploaded files
  • spreadsheets or example exports
  • API documentation or vendor docs
  • existing client-folder artifacts
  • user clarifications in the current conversation

Record what was reviewed and what was not available. If a relevant source is unavailable, list it as missing evidence instead of inventing content.

2. Normalize The Brief

Translate vague client language into observable statements. For each meaningful ask, identify:

  • actor or user
  • trigger or entry point
  • input data
  • required behavior
  • output
  • success state
  • failure or exception state
  • owner or decision maker
  • proof evidence

Keep the client-facing wording clear, but make each requirement testable.

3. Build The Requirements Ledger

Use stable requirement IDs such as R-001, R-002, and R-003. Do not renumber existing IDs when updating a plan unless the user explicitly asks for a rewrite.

Each requirement needs:

  • requirement ID
  • title
  • source evidence
  • phase
  • type
  • acceptance criteria
  • proof evidence
  • status

Use references/requirement-ledger-rules.md for the exact field rules and statuses.

4. Model Source Of Truth

For every important data source, classify its role:

  • expected state
  • actual state
  • user-entered state
  • derived state
  • audit evidence
  • output/report

If multiple systems disagree, state which system wins for each decision and which conflicts must be surfaced as exceptions.

5. Phase By Risk Reduction

Use phases to control scope:

  • Phase 0: discovery and evidence gathering
  • Phase 1: smallest useful proof
  • Phase 2: interpretation, assessment, business rules, or workflow depth
  • Phase 3: operational automation and production hardening

Phase 1 should prove the core value with the fewest moving parts. Move anything interpretation-heavy or platform-shaped to later phases unless it is essential to proving value.

6. Separate Questions And Validation Work

Create separate registers for:

  • technical validation owned by us
  • Phase 1 client questions
  • later-phase client questions
  • deferred decisions and explicit non-goals

Each question needs a reason, owner, resolution plan, and the phase it affects. Use references/question-register.md.

7. Write And Save The Plan

Save the plan as Markdown. If the user gives a client folder, save it there. If no folder is provided and the current workspace has a clients/ directory, use:

clients/<client-slug>/<project-slug>/plans/YYYY-MM-DD-client-plan.md

If there is no obvious client folder, ask one focused question for the target save location before writing. When operating headless, write to a clearly named draft path under the current workspace and mark the plan DRAFT - location unconfirmed.

Use references/client-plan-template.md as the document structure. Include a final Production AI Handoff section naming the next skills.

8. Report The Outcome

In the final response, include:

  • saved plan path
  • implementation readiness status: READY, CONDITIONAL, or BLOCKED
  • top blockers or open client questions
  • next recommended Production AI skill

Readiness Status

Use exactly one status:

  • READY: client plan has enough confirmed requirements and evidence to enter $clarify-before-build.
  • CONDITIONAL: work can proceed only under named assumptions or safe defaults.
  • BLOCKED: implementation planning should not proceed until named evidence or client answers are available.

Most early client plans should be DRAFT - not confirmed and either CONDITIONAL or BLOCKED.

Production AI Handoff

End every plan with a handoff section:

  • Use $clarify-before-build after the client accepts the plan.
  • Use $feature-design-preflight for nontrivial features, third-party APIs, file parsing, AI calls, background work, storage, auth, payments, or operational workflows.
  • Use $repo-testing-setup if the work becomes a new repo or an adopted repo without a proven containerized gate.
  • Use $user-action-coverage-review before substantial user-facing implementation.
  • Use $security-threat-model before implementation in sensitive areas and before any push.
  • Use $test-readiness-preflight before expensive local container validation.

Completion Blockers

Do not call the client plan complete while any of these are true:

  • Requirements are not numbered and testable.
  • Major requirements lack source evidence.
  • Client questions are mixed with technical validation work.
  • The first phase is a full platform when a smaller proof would prove value.
  • Sensitive source text or credentials are repeated.
  • Assumptions are hidden.
  • The saved file path is not reported.
  • The plan lacks a Production AI handoff.