agentsclimarketplace

Full pipeline

Skill indranilbanerjee/socialforge/skills/full-pipeline

Open-source agency-grade social media production plugin — 16 skills, 25 commands, AI image (Nano Banana Pro) + AI video (Kling v3.0 Pro) + C2PA signing (EU AI Act Article 50). Installs on Claude Code, Cowork, Codex, Cursor, Copilot CLI, Antigravity. By Indranil Banerjee (indranil.in).

Install
npx -y skills add indranilbanerjee/socialforge --skill full-pipeline

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 22 stars22 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Run the complete end-to-end production pipeline — parse, match, compose, copy, preview, review, finalize.

SKILL.md

6.0 KB, as published. Nobody here has run it

/socialforge:full-pipeline — Complete Production Pipeline

Run all phases sequentially with quality gates between each.

Context efficiency

Asset-heavy skill. Grep before Read the asset catalog (${CLAUDE_PLUGIN_DATA}/<brand>/assets/index.json) — never list the asset directory. Reference generated images / videos by path, not by loading metadata. Brand profile loads once per session.

Pipeline Phases

PhaseSkillGate
-1credential-checkAPI credentials configured (Vertex AI and/or WaveSpeed)
0parse-calendarCalendar parsed, all required fields present
1match-assetsAsset matches confirmed by user
2compose-creativeAll images/videos generated, quality scores ≥7.0
3adapt-copyCopy adapted, compliance passed
4create-previewsPreviews rendered for all posts
5build-review-galleryGallery built and accessible (images + video)
6manage-reviewsAll posts reviewed (async — pipeline pauses here)
7finalize-monthAll approved posts packaged for delivery

Phase -1: Credential Check

Before any production work begins, verify that the required API credentials are configured via credential_manager.py.

  1. Run credential_manager.py status to check Vertex AI and WaveSpeed configuration
  2. Image generation requires Vertex AI credentials configured via /socialforge:setup
  3. Video generation requires WaveSpeed API key (only checked if calendar contains video posts)
  4. If any required credential is missing, stop the pipeline and prompt the user: "Required credentials not configured. Run /socialforge:setup to configure API keys before starting production."
  5. If all credentials are valid, proceed to Phase 0

Phase 2: Compose Creative

Phase 2 operates in two distinct modes depending on how it is invoked.

Interactive mode (/socialforge:generate-post)

Produces creative for a single post with full user control at each stage.

Image posts — 4-stage approval:

  1. Direction — Review creative direction and prompt before generation
  2. Generate — AI generates 2-3 variants; user picks the best or requests regeneration
  3. Composite — Selected variant composited with brand asset, overlay, and logo; user approves
  4. Resize — Platform-specific resizes produced; user confirms final set

Video posts — 5-stage approval:

  1. Direction — Review video concept, storyboard outline, and scene descriptions
  2. Script — Approve shot-by-shot script with timing and transitions
  3. Generate — AI generates video clip; user reviews motion and pacing
  4. Composite — Overlay, logo, and captions applied; user approves
  5. Resize — Platform-specific aspect ratios produced; user confirms final set

Batch mode (/socialforge:generate-all)

Produces creative for all posts in the calendar with minimal interruption.

  1. Group-based direction — Posts are grouped by creative mode (ANCHOR, ENHANCE, STYLE_REF, PURE). User approves creative direction per group rather than per post.
  2. Auto-generate — All posts generate in sequence using the approved group directions. Progress is displayed per post with quality scores.
  3. Gallery review — Once all posts are generated, a review gallery is built automatically so the user can review everything at once.
  4. Flagged regeneration — User flags any posts that need rework. Flagged posts regenerate with adjusted prompts. Unflagged posts proceed as approved.

Phase 5: Review Gallery

The review gallery (/socialforge:review) now supports both image and video content:

  • Image posts display as before — preview thumbnail, quality score, copy, and compliance status
  • Video posts display with side-by-side <video> tags showing the raw generated clip alongside the composited version with overlays, enabling direct comparison of motion, pacing, and brand overlay placement

Progress

SocialForge Full Pipeline — AcmeCorp / April 2026

[pre] Credential Check ✓ — Vertex AI ready, WaveSpeed ready
[1/7] Parse Calendar ✓ — 28 posts extracted (24 image, 4 video)
[2/7] Match Assets ✓ — 8 ANCHOR, 5 ENHANCE, 9 STYLE_REF, 4 PURE, 2 CAROUSEL
[3/7] Compose Creative → IN PROGRESS
  Mode: batch (group-based direction)
  Groups approved: ANCHOR ✓ ENHANCE ✓ STYLE_REF ✓ PURE → awaiting direction
  Generated: 18/28 posts (~10 min remaining)
  Latest: P18 — STYLE_REFERENCED — Score: 8.4/10 ✓
  Videos: 2/4 generated — P07 Score: 7.8/10 ✓
[4/7] Adapt Copy — waiting
[5/7] Create Previews — waiting
[6/7] Review Gallery — waiting
[7/7] Finalize — waiting

Rules

  • Each phase must pass its gate before the next starts
  • Phase -1 (Credential Check) is the first gate — no production without valid credentials
  • Phase 6 (Review) is async — pipeline pauses for human review
  • User can interrupt at any phase and resume later
  • Status persists in status-tracker.json

Async Review Gate (Phase 6)

Phase 6 (manage-reviews) is the only async gate — the pipeline pauses here because human review takes hours or days.

When pipeline reaches Phase 6:

  1. Gallery is built and shared (Phase 5 output)
  2. Pipeline shows: "Review gallery ready. Pipeline paused — resume after reviews complete."
  3. User reviews posts via /socialforge:review or /socialforge:manage-reviews
  4. To resume after reviews: run /socialforge:full-pipeline --resume or /socialforge:finalize directly

Escalation (per approval-chain.json):

  • Reminder after N days (configurable per tier)
  • Escalate to next reviewer after M days
  • Auto-finalize HYGIENE tier after N days if configured

Timeout: No automatic timeout — Phase 6 stays paused until human action. The /socialforge:status command shows pending review counts.

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.