Pre-deployment canary and rollout planning. Activate when the user mentions "deploy", "ship it", "release", "roll out", "go live", "production", "deploy plan", "deployment runbook", "canary", "staged rollout", "blue-green", "rollback plan", "feature flag rollout", "harness canary", or invokes /harness:canary. Also use this Skill without being asked whenever work that just passed verification is headed for production, and treat it as mandatory when the change touches database migrations, authentication, payment paths, or a new environment or region — the gap between "verified" and "safely in production" is where incidents originate.From its SKILL.md

Install
npx -y skills add huangbaixun/harness-engineering --skill canary

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 3 stars3 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

11.6 KB, as published. Nobody here has run it

harness:canary — Pre-Deployment Canary Planning

Generate a structured deployment runbook with risk-based canary stages, rollback triggers, and observability checklists. Core principle: The gap between "code verified" and "safely in production" is where most incidents originate. A structured runbook closes that gap.

When to Use

Under any of the following circumstances, execute this workflow before deploying to production:

CircumstanceExample
Feature passed harness:verification-before-completion, ready to ship"Let's deploy this to production"
Preparing a release with database migrations"We have schema changes, need a deploy plan"
Deploying to a new environment or region"Rolling out to EU region"
Any change touching auth, payments, or core data paths"The auth rewrite is ready to go live"
Team wants a deployment checklist"Write a deploy runbook", "How should we roll this out"

Decision rule: If the change affects production users or infrastructure, a canary plan is recommended. If it involves database migrations, auth, or payment paths, it is mandatory.

Canary Planning Workflow

Step 1: Gather Change Context

Collect information from three sources:

1a. Git diff analysis

# Compare against the deployment base (main or last release tag)
git diff main...HEAD --stat
git diff main...HEAD --name-only
git log main...HEAD --oneline

Extract:

  • Total files changed, lines added/removed
  • Which directories and modules are affected
  • Whether migrations, config files, or environment variables changed

1b. Constraint check (if features.json exists)

cat features.json 2>/dev/null || cat docs/features.json

Identify which features are being deployed and their constraint types:

  • rigid constraints (acceptance_criteria, forbidden_patterns) — these map to mandatory verification steps in the runbook
  • dependencies — confirm all are satisfied before deployment

1c. Architecture impact (if docs/architecture.md exists)

cat docs/architecture.md

Identify which layers/services are affected and their downstream consumers.

Step 2: Risk Assessment

Score the deployment across five dimensions. Each dimension adds to the total risk score:

DimensionConditionScore
DataDatabase schema migration (ALTER TABLE, new index, column change)+3
DataData backfill or bulk update+2
Auth/SecurityChanges to authentication, authorization, or encryption+3
Payment/FinancialChanges to payment processing, billing, or financial calculations+3
Blast radiusChanges span 3+ services or modules+2
Blast radiusChanges span 10+ files+1
NoveltyNew service, new external dependency, or new infrastructure component+2
NoveltyFirst deployment to this environment/region+2
ReversibilityIncludes irreversible migration (DROP COLUMN, data format change)+3
ReversibilityFeature flag not available for quick disable+1

Risk level mapping:

Total ScoreLevelCanary Strategy
0-2Low2-stage: 50% -> 100%
3-5Medium3-stage: 10% -> 50% -> 100%
6-8High4-stage: 1% -> 10% -> 50% -> 100%
9+Critical5-stage: 1% -> 5% -> 25% -> 50% -> 100%

Step 3: Generate Runbook

Output the runbook to deploy/runbook-<feature-or-release-name>.md using the following structure:

# Deployment Runbook: [Feature/Release Name]

> Generated: [DATE]
> Risk level: [Low/Medium/High/Critical] (score: N)
> Author: harness:canary

## 1. Pre-Deploy Checklist

- [ ] All CI checks passing on the deployment branch
- [ ] harness:verification-before-completion completed (4-layer check passed)
- [ ] Environment variables confirmed for target environment
  - [ ] [List any new env vars introduced in this change]
- [ ] Database migration reviewed and tested against staging data
  - [ ] Migration is backward-compatible (old code can run against new schema)
  - [ ] Rollback migration exists and has been tested
- [ ] Feature flags configured (if applicable)
  - [ ] [List flags and their initial state]
- [ ] On-call engineer identified and available: _______________
- [ ] Rollback procedure reviewed by deploying engineer

## 2. Risk Assessment

| Dimension | Finding | Score |
|-----------|---------|-------|
| Data | [specific finding] | +N |
| Auth/Security | [specific finding] | +N |
| ... | ... | ... |
| **Total** | | **N** |

Risk level: [Level] — [one-line justification]

## 3. Canary Stages

### Stage 1: [X]% traffic
- **Duration**: [observation window]
- **Deploy command**: [platform-specific or manual steps]
- **Monitor**:
  - [ ] Error rate < [threshold]% (baseline: [current]%)
  - [ ] p99 latency < [threshold]ms (baseline: [current]ms)
  - [ ] No new error types in logs
- **Proceed criteria**: All monitors green for full duration
- **Rollback trigger**: Any monitor breached -> immediate rollback

### Stage 2: [Y]% traffic
[same structure]

### Stage N: 100% traffic (full rollout)
- **Duration**: 30 min observation after full rollout
- **Monitor**: Same as above + business metrics
  - [ ] [Business-specific metric] within normal range
- **Stabilization**: Keep previous version available for 24h after full rollout

## 4. Rollback Plan

**Automated rollback triggers** (any ONE triggers immediate rollback):
- Error rate exceeds [X]% (2x baseline)
- p99 latency exceeds [X]ms (3x baseline)
- Any 5xx spike > [N] errors/minute
- [Feature-specific condition]

**Rollback procedure**:
1. [Platform-specific rollback command or manual steps]
2. Verify rollback: confirm previous version is serving traffic
3. Notify team in [channel]: "Rollback executed for [feature], investigating"
4. Create incident ticket if rollback was triggered by monitor breach

**Database rollback** (if applicable):
- [ ] Rollback migration: [migration name/path]
- [ ] Data backfill reversal: [procedure or N/A]
- ⚠️ If migration is irreversible, document the forward-fix strategy instead

## 5. Observability Checklist

Dashboards to watch during deployment:
- [ ] [Primary dashboard URL/name] — overall service health
- [ ] [Database dashboard] — query latency, connection pool, slow queries
- [ ] [Business metrics dashboard] — conversion, signup, core flows

Alerts that should be active:
- [ ] [Alert name] — [what it monitors]
- [ ] [Alert name] — [what it monitors]

Log queries to have ready:
- [ ] `[query for new error types]`
- [ ] `[query for the specific feature's log lines]`

## 6. Post-Deploy Verification

After reaching 100% and observation window passes:
- [ ] Smoke test: [list key user flows to manually verify]
- [ ] Verify rigid constraints from features.json are met in production
- [ ] Confirm monitoring baselines have stabilized at new normal
- [ ] Update deployment log / changelog
- [ ] Notify stakeholders: "[Feature] successfully deployed to production"
- [ ] Schedule: remove feature flag after [N] days (if applicable)

Step 4: Platform-Specific Appendix

If the user specifies a deployment platform, append a platform-specific section.

Generic (no platform specified):

  • Use placeholder commands: [deploy command], [rollback command]
  • Focus on the process and decision framework

Kubernetes:

## Appendix: Kubernetes Commands

### Canary deployment
```bash
# Stage 1: Deploy canary with reduced replicas
kubectl set image deployment/<app> <container>=<image>:<tag> -n <namespace>
kubectl scale deployment/<app>-canary --replicas=1 -n <namespace>

# Monitor canary pods
kubectl get pods -l app=<app>,track=canary -n <namespace> -w
kubectl logs -l app=<app>,track=canary -n <namespace> --tail=100 -f

Traffic splitting (Istio/Linkerd)

# Adjust canary weight (example: Istio VirtualService)
kubectl patch virtualservice <app> -n <namespace> --type merge -p '
spec:
  http:
  - route:
    - destination:
        host: <app>
        subset: stable
      weight: 90
    - destination:
        host: <app>
        subset: canary
      weight: 10
'

Rollback

kubectl rollout undo deployment/<app> -n <namespace>
kubectl rollout status deployment/<app> -n <namespace>

Health checks

kubectl get events -n <namespace> --sort-by=.lastTimestamp | tail -20
kubectl top pods -l app=<app> -n <namespace>

### Step 5: Human Confirmation Gate

**After generating the runbook, present a summary and wait for user confirmation.**

Deployment runbook generated: deploy/runbook-<name>.md

Risk: [Level] (score: N)

  • [Top risk factor]
  • [Second risk factor if applicable]

Canary strategy: [N]-stage ([percentages]) Estimated total deployment time: [sum of observation windows]

Key items requiring your input:

  • On-call engineer name
  • Dashboard URLs (if not auto-detected)
  • Platform-specific deploy commands (if generic)

Review the runbook and confirm before proceeding with deployment.


Do not initiate any deployment. The runbook is a planning artifact, not an execution trigger.

## Integration with Harness Workflow

| Upstream | This Skill | Downstream |
|----------|-----------|------------|
| harness:verification-before-completion (code quality confirmed) | **harness:canary** (deploy plan) | Manual deployment execution |
| harness:writing-plans (rigid constraints) | Risk assessment uses rigid constraints | harness:archive (post-deploy cleanup) |

## Runbook Quality Checklist

A good runbook satisfies:
- [ ] Risk score is computed with explicit reasoning for each dimension
- [ ] Canary stages match the risk level (not over- or under-cautious)
- [ ] Every stage has quantitative monitor thresholds, not vague "check if things look ok"
- [ ] Rollback triggers are automated conditions, not "team decides"
- [ ] Rollback procedure is specific enough to execute under pressure (no ambiguity)
- [ ] Observability section references real dashboards/alerts (or marks them as TBD for user to fill)
- [ ] Post-deploy verification covers both technical health and business metrics
- [ ] Feature-specific risks are called out (not just generic checklist items)

## Anti-pattern Reminders

| Anti-pattern | Reason | Correct approach |
|--------|------|---------|
| Skipping canary for "small changes" | Small changes cause a disproportionate share of incidents | Risk-score the change; even Low risk gets a 2-stage canary |
| Observation windows < 10 minutes | Latent issues (memory leaks, connection pool exhaustion) take time to surface | Minimum 15 min per stage, 30 min for High/Critical |
| "We can always rollback" without testing | Rollback procedures that haven't been tested often fail when needed | Rollback migration must be tested on staging before deploy |
| Deploying on Friday afternoon | Reduced team availability for incident response | Prefer early-week deployments; flag Friday deploys as +1 risk |
| No feature flag for new user-facing features | No way to disable without full rollback | Recommend feature flags for any user-visible change |