把工作拆解成有顺序的任务。Use when you have a spec or clear requirements and need to break work into implementable tasks. Use when a task feels too large to start, when you need to estimate scope, or when parallel work is possible.From its SKILL.md

Install
npx -y skills add Hayatelin/agent-skills-zh-CN --skill planning-and-task-breakdown

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

7.0 KB, as published. Nobody here has run it

规划与任务拆解

概观

把工作分解成小而可验证、带明确验收条件的任务。好的任务拆解,决定了一个 agent 是稳定完成工作、还是产出一团乱麻。每个任务都应该小到能在单一次专注的 session 里实现、测试并验证完。

使用时机

  • 你有规格,需要拆成可实现的单位
  • 任务感觉太大或太模糊,不知从何开始
  • 工作需要在多个 agent 或 session 之间平行化
  • 你需要向人沟通范围
  • 实现顺序不明显

**不适用时机:**范围明显的单文件变更,或规格已内含定义完善的任务。

规划流程

步骤 1:进入 Plan Mode

写任何代码之前,先以唯读模式操作:

  • 阅读规格与相关的代码区段
  • 辨认既有的模式与惯例
  • 描绘组件之间的依赖关系
  • 记下风险与未知数

**规划期间不要写代码。**产出是存到 tasks/plan.md 的计划文档与存到 tasks/todo.md 的任务清单,不是实现。

步骤 2:找出依赖图

画出谁依赖谁:

数据库 schema
    │
    ├── API 模型/类型
    │       │
    │       ├── API endpoint
    │       │       │
    │       │       └── 前端 API client
    │       │               │
    │       │               └── UI 组件
    │       │
    │       └── 验证逻辑
    │
    └── Seed 数据 / migration

实现顺序沿着依赖图由下而上:先打地基。

步骤 3:垂直切片

不要先盖完整个数据库、再盖完所有 API、再盖完所有 UI——一次打通一条完整的功能路径:

坏例子(水平切片):

Task 1: 建好整个数据库 schema
Task 2: 建好所有 API endpoint
Task 3: 建好所有 UI 组件
Task 4: 全部接起来

好例子(垂直切片):

Task 1: 用户可以创建帐号(注册的 schema + API + UI)
Task 2: 用户可以登录(auth schema + API + 登录 UI)
Task 3: 用户可以创建任务(任务 schema + API + 创建 UI)
Task 4: 用户可以查看任务列表(查询 + API + 列表 UI)

每个垂直切片都交付可运作、可测试的功能。

步骤 4:撰写任务

每个任务遵循这个结构:

## Task [N]: [简短的描述性标题]

**Description:** 一段话说明这个任务要达成什么。

**Acceptance criteria:**
- [ ] [具体、可测试的条件]
- [ ] [具体、可测试的条件]

**Verification:**
- [ ] 测试通过:`npm test -- --grep "feature-name"`
- [ ] Build 成功:`npm run build`
- [ ] 手动检查:[描述要验证什么]

**Dependencies:** [依赖的任务编号,或“None”]

**Files likely touched:**
- `src/path/to/file.ts`
- `tests/path/to/test.ts`

**Estimated scope:** [Small: 1-2 个文件 | Medium: 3-5 个文件 | Large: 5 个以上]

步骤 5:排序与设检查点

任务的安排要做到:

  1. 依赖先被满足(先打地基)
  2. 每个任务完成后系统都处于可运作状态
  3. 每 2–3 个任务就有一个验证检查点
  4. 高风险任务排前面(fail fast)

加上明确的检查点:

## Checkpoint: After Tasks 1-3
- [ ] 所有测试通过
- [ ] 应用程序 build 无错误
- [ ] 内核用户流程端对端可运作
- [ ] 续行前先由人审查

任务大小准则

大小文件数范围范例
XS1单一函数或设置变更加一条验证规则
S1-2一个组件或 endpoint添加一个 API endpoint
M3-5一个功能切片用户注册流程
L5-8多组件功能带筛选与分页的搜索
XL8+太大——再往下拆—

任务到 L 以上就该拆成更小的任务。agent 在 S 和 M 大小的任务上表现最好。

什么时候该再往下拆:

  • 一次专注的 session 做不完(约 2 小时以上的 agent 工作量)
  • 验收条件没办法用 3 点以内写完
  • 触及两个以上彼此独立的子系统(例如 auth 和帐务)
  • 你发现任务标题里写了“和”(这是两个任务的征兆)

产出文件

  • **计划文档:**实现计划存到 tasks/plan.md。
  • **任务清单:**checklist 形式的任务清单存到 tasks/todo.md。

tasks/ 目录不存在就创建。这些路径是 /build 指令与其他下游工具预期的惯例。

计划文档模板

# Implementation Plan: [功能/项目名称]

## Overview
[一段话总结我们要建什么]

## Architecture Decisions
- [关键决策 1 与理由]
- [关键决策 2 与理由]

## Task List

### Phase 1: Foundation
- [ ] Task 1: ...
- [ ] Task 2: ...

### Checkpoint: Foundation
- [ ] 测试通过、build 干净

### Phase 2: Core Features
- [ ] Task 3: ...
- [ ] Task 4: ...

### Checkpoint: Core Features
- [ ] 端对端流程可运作

### Phase 3: Polish
- [ ] Task 5: ...
- [ ] Task 6: ...

### Checkpoint: Complete
- [ ] 所有验收条件达成
- [ ] 可送审

## Risks and Mitigations
| 风险 | 影响 | 缓解措施 |
|------|--------|------------|
| [风险] | [High/Med/Low] | [策略] |

## Open Questions
- [需要人回答的问题]

平行化机会

当有多个 agent 或 session 可用时:

  • **可安全平行化:**彼此独立的功能切片、已实现功能的测试、文档
  • **必须循序:**数据库 migration、共享状态的变更、依赖链
  • **需要协调:**共用 API 契约的功能(先定契约,再平行化)

常见的自我合理化

合理化说法实际情况
“我边做边想”这就是一团乱麻和重工的由来。10 分钟的规划省下数小时。
“任务很明显啊”还是写下来。明确的任务会让隐藏的依赖和被遗忘的边界案例浮现。
“规划是额外负担”规划就是任务本身。没有计划的实现只是打字。
“我全都记在脑子里”Context window 是有限的。写下来的计划能撑过 session 边界与压缩。

警讯

  • 没有书面任务清单就开始实现
  • 任务只写“实现这个功能”,没有验收条件
  • 计划中没有验证步骤
  • 所有任务都是 XL 大小
  • 任务之间没有检查点
  • 没有考虑依赖顺序

验证

开始实现前,确认:

  • 每个任务都有验收条件
  • 每个任务都有验证步骤
  • 任务依赖已辨识并正确排序
  • 没有任务触及超过约 5 个文件
  • 主要阶段之间设有检查点
  • 计划已由人审查并核准

延伸阅读

验收条件是逐任务的,回答“我们做的东西对吗?”。它们架在全项目的 Definition of Done 之上——那是每个任务在算数之前都必须跨过的固定标准。见 references/definition-of-done.md。