agentsclimarketplace

Copr release

Skill fedora-copr/copr-skills/skills/copr-release

Release Copr RPM packages to Fedora infrastructure. Use when the user asks to release, tag, deploy, or do a mini release of Copr packages. Covers the full lifecycle: pre-release testing, tagging, Koji builds, infra tags, and deployment.From its SKILL.md

Install
npx -y skills add fedora-copr/copr-skills --skill copr-release

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

5.5 KB, as published. Nobody here has run it

Copr Release

Full release documentation: doc/how_to_release_copr.rst Hotfix documentation: doc/how_to_build_hotfix.rst

This skill adds agent-specific behavior on top of the docs: what to automate, what to ask the user, what NOT to run yourself, and how to poll for results.

Key Principle

Test before tagging. Never create tags or push them until sanity tests pass on dev machines. Never push to production without explicit user confirmation.

Git Remotes

Verify with git remote -v. Commands below assume upstream → fedora-copr/copr.


Phase 0: Verify clean state

Before starting, check the repo is ready:

git branch --show-current        # must be main (or hotfix-$DATE)
git status --porcelain           # must be empty
git remote -v                    # identify which remote is fedora-copr/copr

If dirty or wrong branch, stop and tell the user.


Phase 1: Pre-release Testing

1.1 Rebuild @copr/copr-dev

Stay on whatever branch Phase 0 verified — do NOT switch branches here.

For a regular release (branch is main), fetch the latest upstream changes first:

git pull --rebase upstream main

For a hotfix release (branch is hotfix-$DATE), skip the pull above — the hotfix branch is a fixed set of cherry-picked commits, not tracking main.

Then, on either branch:

./build_aux/rebuild-copr-stack

Poll builds until all succeed:

copr list-builds @copr/copr-dev --output-format text-row

Keep checking every ~60s. Do NOT proceed until all builds show succeeded. If any build fails, read the build log, tell the user, and stop.

1.2 Deploy to dev machines

Ask the user to run the relevant playbooks on batcave01 (you don't have SSH access). For a mini release (e.g. backend-only), only the relevant playbook is needed. See doc/how_to_release_copr.rst → "Upgrade -dev machines".

1.3 Verify + test

Tell the user to verify versions and run sanity tests. See doc/sanity_tests.rst for details, or testing-farm/all-on-single-host.sh for the single-host variant.

./releng/run-on-all-infra --devel 'rpm -qa | grep copr'

Do NOT proceed to tagging until the user confirms tests pass.


Phase 2: Tag

Follow doc/how_to_release_copr.rst → "Tag untagged packages". You can run tito report --untagged-commits and tito tag yourself.

After tito generates the changelog, clean it up — amend the tag commit with the polished changelog, then git tag -f <tag>.

Push: git push --follow-tags upstream


Phase 3: Build and Release to Koji

3.1 Build into @copr/copr

For each tagged package:

copr build-package @copr/copr --nowait --name <package-name>

Poll with copr-cli status <BUILD_ID> until all succeed.

3.2 Release to Fedora dist-git / Koji

Do NOT run tito release yourself — it requires interactive prompts (Kerberos auth, branch confirmations). Print the commands for the user. See doc/how_to_release_copr.rst → "Build packages for production" for the package→releaser mapping and known issues (Bodhi overrides, backend DistGit sources file).

Before printing commands, run klist yourself. If no valid FEDORAPROJECT.ORG ticket exists, stop and tell the user to run fkinit -u <FAS_USERNAME> first.

3.3 Determine NVRs for infra tags

After the user confirms tito release is done, ask: "Which Fedora version are the Copr servers running on?"

Look up NVR and arch from Koji:

koji taskinfo <TASK_ID> | grep "^Build:"
koji buildinfo <BUILD_ID>   # check RPMs section for arch (noarch vs x86_64)

Most Copr packages are noarch; copr-rpmbuild is the exception (per-arch). Use koji buildinfo to confirm the arch when constructing the RPM filename for koji-infratag-available.


Phase 4: Infra Tags and Production Deploy

Follow doc/how_to_release_copr.rst → "Submit packages into stg infra tags" through "Upgrade production machines". The releng scripts to use:

./releng/koji-infratag-staging <NVR> ...
./releng/koji-infratag-available --stg --wait <NVR>.<arch>.rpm
./releng/koji-infratag-move-prod <NVR> ...
./releng/koji-infratag-available --prod --wait <NVR>.<arch>.rpm

Koji race condition: There is a long-term race in Koji repo regeneration. When submitting multiple NVRs, submit all but one first, wait a few minutes, then submit the last one to "poke through" a potentially broken repo. This applies to both staging and production infra tags.

Agent-specific checkpoints:

  1. After staging verification, ask: "Staging looks good. Ready to push to production?" Wait for explicit confirmation.
  2. Tell the user to run upgrade playbooks on batcave01. Advise stopping copr-backend.target first.
  3. After production upgrade, ask user to run runtest-production.sh or submit a test build.

Phase 5: Post-release

Print the post-release checklist from doc/how_to_release_copr.rst → "Post-release" for the user. These are all manual steps (PyPI, Bodhi, Bugzilla, ReadTheDocs, release notes, outage announcement).


Hotfix

See doc/how_to_build_hotfix.rst. Key difference: work on a hotfix-$DATE branch, cherry-pick fixes, use .hotfix.N versions.

Keep looking

Skills are one crate of 607,721. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.