Planning and task breakdown

Skill factly/flowly-agent-skills/skills/planning-and-task-breakdown

Breaks work into ordered tasks. Use when you have a spec or clear requirements and need to break work into implementable tasks. Use when a task feels too large to start, when you need to estimate scope, or when parallel work is possible.From its SKILL.md

Install
npx -y skills add factly/flowly-agent-skills --skill planning-and-task-breakdown

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

9.7 KB, as published. Nobody here has run it

Planning and Task Breakdown

Overview

Decompose work into small, verifiable tasks with explicit acceptance criteria. Good task breakdown is the difference between an agent that completes work reliably and one that produces a tangled mess. Every task should be small enough to implement, test, and verify in a single focused session.

When to Use

  • You have a spec and need to break it into implementable units
  • A task feels too large or vague to start
  • Work needs to be parallelized across multiple agents or sessions
  • You need to communicate scope to a human
  • The implementation order isn't obvious

When NOT to use: Single-file changes with obvious scope, or when the spec already contains well-defined tasks.

The Planning Process

Step 1: Enter Plan Mode

Before writing any code, operate in read-only mode:

  • Read the spec and relevant codebase sections
  • Identify existing patterns and conventions
  • Map dependencies between components
  • Note risks and unknowns

Do NOT write code during planning. The output is a plan document written to the issue with put_planning_doc(kind="plan") and a task list recorded in the task list target (see Outputs), not implementation.

Step 2: Identify the Dependency Graph

Map what depends on what:

Database schema
    │
    ├── API models/types
    │       │
    │       ├── API endpoints
    │       │       │
    │       │       └── Frontend API client
    │       │               │
    │       │               └── UI components
    │       │
    │       └── Validation logic
    │
    └── Seed data / migrations

Implementation order follows the dependency graph bottom-up: build foundations first.

Step 3: Slice Vertically

Instead of building all the database, then all the API, then all the UI — build one complete feature path at a time:

Bad (horizontal slicing):

Task 1: Build entire database schema
Task 2: Build all API endpoints
Task 3: Build all UI components
Task 4: Connect everything

Good (vertical slicing):

Task 1: User can create an account (schema + API + UI for registration)
Task 2: User can log in (auth schema + API + UI for login)
Task 3: User can create a task (task schema + API + UI for creation)
Task 4: User can view task list (query + API + UI for list view)

Each vertical slice delivers working, testable functionality.

Step 4: Write Tasks

Each task follows this structure, whether it is written with put_todo_tasks or recorded as an item in another tracker (see Outputs):

## Task [N]: [Short descriptive title]

**Description:** One paragraph explaining what this task accomplishes.

**Acceptance criteria:**
- [ ] [Specific, testable condition]
- [ ] [Specific, testable condition]

**Verification:**
- [ ] Tests pass: [the repository's focused-test command]
- [ ] Build succeeds: [the repository's build command]
- [ ] Manual check: [description of what to verify]

**Dependencies:** [Task numbers this depends on, or "None"]

**Files likely touched:**
- `src/path/to/file.ts`
- `tests/path/to/test.ts`

**Estimated scope:** [Small: 1-2 files | Medium: 3-5 files | Large: 5+ files]

Step 5: Order and Checkpoint

Arrange tasks so that:

  1. Dependencies are satisfied (build foundation first)
  2. Each task leaves the system in a working state
  3. Verification checkpoints occur after every 2-3 tasks
  4. High-risk tasks are early (fail fast)

Add explicit checkpoints to the task list target:

## Checkpoint: After Tasks 1-3
- [ ] All tests pass
- [ ] Application builds without errors
- [ ] Core user flow works end-to-end
- [ ] Review with human before proceeding

Task Sizing Guidelines

SizeFilesScopeExample
XS1Single function or config changeAdd a validation rule
S1-2One component or endpointAdd a new API endpoint
M3-5One feature sliceUser registration flow
L5-8Multi-component featureSearch with filtering and pagination
XL8+Too large — break it down further—

If a task is L or larger, it should be broken into smaller tasks. An agent performs best on S and M tasks.

When to break a task down further:

  • It would take more than one focused session (roughly 2+ hours of agent work)
  • You cannot describe the acceptance criteria in 3 or fewer bullet points
  • It touches two or more independent subsystems (e.g., auth and billing)
  • You find yourself writing "and" in the task title (a sign it is two tasks)

Outputs

  • Plan document: Write the implementation plan to the issue with put_planning_doc(kind="plan"). Design decisions, risks and open questions do not map cleanly onto individual tracker items, so they stay together in one document rather than being scattered across them.
  • Task list: Record each task in the task list target (defined below).

Nothing goes into the working tree. No planning artifact is written to a file, and no directory is created to hold one.

Task List Target

The task list target is where tasks and checkpoints are recorded. It is defined once, here; every other reference in this skill defers to it.

  • In this distribution the target is Flowly, and there is no file fallback. Write the task list with put_todo_tasks, which renders the issue's todo doc from your task objects. This is what the /flowly:build command and other downstream tooling read back.
  • Another tracker: if you are working in a project that keeps its work elsewhere (GitHub Issues, Jira, Linear, bd/beads), create one item per task there instead. Map the Step 4 structure onto that tracker's fields: acceptance criteria and verification steps in the item body, dependencies via its own linking mechanism (bd dep add, "blocked by", etc.). Record Step 5 checkpoints as items too, or as a checklist in the plan document if it has no natural equivalent.

Upstream's version of this skill makes the working tree the default and a tracker the opt-in. This distribution inverts that, and the reason is the failure mode rather than taste: a soft default requires the consuming project to have designated a tracker, a plugin cannot guarantee that any project did, and what happens when none has is an agent writing a plan into a file nothing will ever read back.

When using a tracker other than Flowly, note it in the plan document (e.g. "Tasks tracked in Linear project FOO") so downstream steps and future sessions know where to look, and keep the plan document's Task List section as an ordered index of item IDs or links rather than a duplicate checklist.

Plan Document Template

# Implementation Plan: [Feature/Project Name]

## Overview
[One paragraph summary of what we're building]

## Architecture Decisions
- [Key decision 1 and rationale]
- [Key decision 2 and rationale]

## Task List

### Phase 1: Foundation
- [ ] Task 1: ...
- [ ] Task 2: ...

### Checkpoint: Foundation
- [ ] Tests pass, builds clean

### Phase 2: Core Features
- [ ] Task 3: ...
- [ ] Task 4: ...

### Checkpoint: Core Features
- [ ] End-to-end flow works

### Phase 3: Polish
- [ ] Task 5: ...
- [ ] Task 6: ...

### Checkpoint: Complete
- [ ] All acceptance criteria met
- [ ] Ready for review

## Risks and Mitigations
| Risk | Impact | Mitigation |
|------|--------|------------|
| [Risk] | [High/Med/Low] | [Strategy] |

## Open Questions
- [Question needing human input]

When tasks live in an external tracker, keep the Task List section above as an ordered index of tracker item IDs or links instead of a duplicate checklist.

Parallelization Opportunities

When multiple agents or sessions are available:

  • Safe to parallelize: Independent feature slices, tests for already-implemented features, documentation
  • Must be sequential: Database migrations, shared state changes, dependency chains
  • Needs coordination: Features that share an API contract (define the contract first, then parallelize)

Common Rationalizations

RationalizationReality
"I'll figure it out as I go"That's how you end up with a tangled mess and rework. 10 minutes of planning saves hours.
"The tasks are obvious"Write them down anyway. Explicit tasks surface hidden dependencies and forgotten edge cases.
"Planning is overhead"Planning is the task. Implementation without a plan is just typing.
"I can hold it all in my head"Context windows are finite. Written plans survive session boundaries and compaction.

Red Flags

  • Starting implementation without a written task list
  • Writing the task list into the working tree at all, or scattering tasks across two targets
  • Tasks that say "implement the feature" without acceptance criteria
  • No verification steps in the plan
  • All tasks are XL-sized
  • No checkpoints between tasks
  • Dependency order isn't considered

Verification

Before starting implementation, confirm:

  • Every task has acceptance criteria
  • Every task has a verification step
  • Task dependencies are identified and ordered correctly
  • Tasks are recorded in the task list target — put_todo_tasks, never a file
  • No task touches more than ~5 files
  • Checkpoints exist between major phases
  • The human has reviewed and approved the plan

See Also

Acceptance criteria are per-task and answer "did we build the right thing?". They sit on top of the project-wide Definition of Done, the standing bar every task clears before it counts as done. See ../../references/definition-of-done.md.