Milestone retrospective analysis — analyze cycle times, blockers, failure patterns, and generate improvement suggestions. Use when the user says 'retrospective', 'retro for M1', 'what went wrong', or runs /retro.From its SKILL.md
npx -y skills add ezagent42/prd2impl --skill skill-11-retroAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
9.5 KB, as published. Nobody here has run it
Skill 11: Retrospective
<SUBAGENT-STOP> If you were dispatched as a subagent to execute a specific task, skip this skill. </SUBAGENT-STOP>Analyze a completed milestone's execution data to identify patterns, bottlenecks, and improvement opportunities.
Trigger
- User runs
/retro {milestone}(e.g.,/retro M1) - User says "retrospective", "retro for M1", "what went well/wrong"
- After a milestone gate passes
Input
- Required: Milestone ID
- Data sources:
{plans_dir}/tasks.yamlor{plans_dir}/task-status.md- Git log (commit history with timestamps)
.artifacts/registry.json(artifact creation times){plans_dir}/*-execution-plan.yaml(planned timeline)
Execution Flow
Path resolution: Before constructing any output path, resolve
{plans_dir}perlib/plans-dir-resolver.md. Alldocs/plans/references below (exceptdocs/plans/project.yaml, which stays at repo root) are relative to that resolved directory..artifacts/paths are NOT scoped — they remain shared across plans_dir (see design spec §8 Limitation 1).
Step 1: Gather Data
-
Task data: For each task in this milestone's phase, collect:
- Start time (first
→ in_progresscommit) - End time (first
→ completedcommit) - Cycle time = end - start
- Status changes (any blocked/failed transitions)
- Start time (first
-
Git data:
git log --oneline --since="{milestone_start}" --until="{milestone_end}" --grep="task:" -
Artifact data: Creation timestamps from registry.json
Step 2: Compute Metrics
metrics:
milestone: M1
planned_duration: "4 hours"
actual_duration: "5.5 hours"
slippage: "+37%"
tasks:
total: 17
completed_on_time: 14
completed_late: 2
blocked_during: 1
failed_and_redone: 0
cycle_times:
median: "45 min"
mean: "52 min"
p90: "2h 10min"
fastest: "T1A.7 — 15 min"
slowest: "T1A.4 — 3h 20min (Yellow, review wait)"
by_type:
green:
count: 13
median_cycle: "35 min"
total_time: "7h 30min"
yellow:
count: 3
median_cycle: "1h 45min"
total_time: "5h 15min"
review_wait_avg: "40 min"
red:
count: 1
median_cycle: "2h"
decision_wait: "30 min"
blockers:
count: 1
total_blocked_time: "45 min"
reasons:
- task: T1A.5
reason: "Waiting for T1A.4 review"
duration: "45 min"
Step 3: Pattern Analysis
Identify recurring patterns:
Bottlenecks:
- Tasks that caused the most downstream waiting
- Review wait times (Yellow tasks)
- Decision wait times (Red tasks)
- External dependency waits
Velocity trends:
- Did tasks get faster or slower as the milestone progressed?
- Any correlation between task type and cycle time?
- Cross-line velocity comparison (if multiple lines)
Quality signals:
-
How many tasks had to be redone?
-
How many had test failures?
-
How many contracts needed amendment?
-
Tasks shipped without executed test-plan (0.4.0+, dev-loop required):
/artifact-registry query --status-not executed --linked-task-status doneEach row is a coverage gap — a task that shipped without observed test execution. Surface in retro report as
## Coverage gaps (tasks done without executed test-plan): N (list). This is the metric the AutoService team has been re-discovering manually after every milestone (PV2 had 11+ post-gate fixes for bugs that never had a real test).Graceful degradation: when dev-loop missing, skip this signal with a note in the retro report.
Step 4: Generate Retrospective Report
# Retrospective: Milestone M1 — {date}
## Timeline
Planned: Wed 04-15 PM (4 hours)
Actual: Wed 04-15 13:00 - 18:30 (5.5 hours, +37%)
## What Went Well
- All 13 Green tasks completed efficiently (median 35 min)
- No tasks failed and needed redo
- All lines worked in parallel without conflicts
- Contract tests caught 2 issues early
## What Didn't Go Well
- Yellow tasks took 3x longer than Green (review wait bottleneck)
- T1A.4 (soul.md) took 3h 20min — largest single task
- Milestone slipped by 1.5 hours from plan
## Metrics Summary
| Metric | Value |
|--------|-------|
| Tasks completed | 17/17 |
| Median cycle time | 45 min |
| Slowest task | T1A.4 (3h 20min) |
| Blocked time | 45 min total |
| Review wait (avg) | 40 min |
## Root Causes
1. **Yellow review bottleneck**: Reviews took 40 min avg because reviewer
was busy with own tasks. Consider: dedicated review windows.
2. **T1A.4 scope**: soul.md for 4 roles was too large for one task.
Should have been split into 4 tasks.
## Improvement Suggestions
1. **Split large Yellow tasks**: Any task >2h should be subdivided
2. **Review windows**: Schedule 15-min review blocks between batches
3. **Parallel reviews**: Both devs review each other's Yellow tasks
simultaneously instead of sequentially
4. **Red task preemption**: Start Red tasks earlier (this worked well
for T3A.4-6, apply same pattern)
## Carry-Forward Items
- [ ] Apply task splitting rule to M2 Yellow tasks
- [ ] Schedule review windows in M2 kickoff
Step 5: Save & Share
- Write report to
{plans_dir}/retro-{milestone}-{date}.md - Commit:
retro: M1 retrospective - Print summary to terminal
- Suggest updating execution plan if patterns warrant schedule changes
Step 6: Framework Learning Loop
Why this exists: M3 retro produced 13 numbered improvement recommendations (R1–R13) in
docs/plans/m3/prd2impl-retro-notes.md. Most never propagated into prd2impl skill templates. PV2 reproduced nearly identical failure modes a sprint later. Step 6 closes the dead-end-report problem by turning each suggestion into a concrete skill patch.
Inputs
improvement_suggestions:block from Step 4 / Step 5 output- The current skill files at
skills/*/SKILL.mdin this plugin
Procedure
-
Classify each suggestion by target skill. Use these heuristics:
Suggestion shape Target skill "yellow review missed contract X" skill-13-autorun/SKILL.mdyellow checklist"task generated for tombstoned story" skills/using-prd2impl/SKILL.mdtombstone gate"test passed but missed prod bug" references/mock-policy.mdorskill-3-task-gen/SKILL.mdconnector_seam"dead code shipped per spec" skill-13-autorun/SKILL.mdtwo-stage yellow review"subagent invented an API method name" skill-12-contract-check/SKILL.md--preflight wiring"estimate was N× off" skill-3-task-gen/SKILL.mdsimilarity_hint guidance"operational default differs from code default" skill-3-task-gen/SKILL.mdenv_var.class declaration ruleFor suggestions that don't match any heuristic, surface them in a
## Unclassifiedsection of the patch directory's index. These need maintainer judgment before they can become skill rules. -
For each classified suggestion, derive:
- Baseline scenario — a runnable description of the failure
(e.g. "Yellow task whose diff calls
pool.acquire_for_sessionwhich does not exist on realCCPool; current skill-13 review approves it; expected after patch: review fails") - Proposed rule text — concrete sentence(s) to insert into the target SKILL.md
- Insertion point — section heading or line number where the rule belongs
- Baseline scenario — a runnable description of the failure
(e.g. "Yellow task whose diff calls
-
Invoke
superpowers:writing-skillswith the baseline scenario, proposed rule, and target file. The writing-skills skill pressure-tests the rule against the baseline:- Without rule → baseline fails (the bug ships)
- With rule → baseline passes (the bug is caught)
- If pressure test fails → revise the rule until it does
-
Emit one patch per suggestion under
{plans_dir}/framework-patches/{slug}.mdusingtemplates/framework-patch.mdformat.
Output
{plans_dir}/framework-patches/ directory containing N patches, each
ready for human review or auto-apply by a maintainer. Auto-apply is
out of scope for 0.4.0 — patches are committed artifacts the
maintainer copies into the prd2impl repo as a separate PR.
Graceful degradation
If superpowers:writing-skills is not installed, retro emits the
markdown patch without the pressure-test step. The patch file
documents that pressure testing was skipped — maintainer must
manually verify the rule catches the baseline before merging into
the skill.
Limitations
- Cycle time accuracy depends on consistent commit message formatting (
task: T1A.1 → in_progress/completed) - Cannot measure "thinking time" vs "active work time"
- Review wait time is estimated from git timestamps, not exact
- External blocker durations are approximated