agentsclimarketplace

SoftwareArchitecture

Skill Exquisite0828/AI_writer_plugin/skills/document-types/SoftwareArchitecture

中文优先指导汽车控制器产品 Software Architecture(SwAD,软件架构)文档写作;保留 ASPICE SWE.2、ISO 26262-6 软件层接口、SwRS 追溯、组件分配、接口边界、tier、HITL 与 candidate-update 约束。From its SKILL.md

Install
npx -y skills add Exquisite0828/AI_writer_plugin --skill SoftwareArchitecture

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

4.7 KB, as published. Nobody here has run it

Software Architecture Document Type Skill

Use this skill for task_type: SoftwareArchitecture only when the agent workflow explicitly selects this guidance. This is a non-official L3 Skill/overlay asset. The metadata builder may place its paths/hashes in StepContextPackage for that exact task type, but Python has no Software Architecture rules registry or end-to-end content engine. Default communication is Chinese; keep Software Architecture、SwAD、SWE.2、ISO 26262-6、SwRS、System Architecture、SWA-COMP-xx、SWA-IF-xx、RTE、BSW、HITL、NEEDS_USER_CONFIRMATION.

Purpose

Software Architecture supports a review-ready ECU software architecture package in ASPICE SWE.2 / ISO 26262-6 context. It organizes software boundary, layers, logical/physical architecture, components, interfaces, SwRS allocation, diagnostics/degradation, safety-related software constraints by citation only, resources/timing, verification method candidates, assumptions, and open confirmations.

It does not produce HARA, FSR, TSC, detailed design, code-level design, ASPICE assessment pass, ISO compliance, architecture approval, or production release approval.

Method Boundaries

  • Read materials by L1→L2→L3→original text.
  • One architecture fact = one claim with T0/T1 EVD or explicit open; no blanket evidence for whole tables.
  • From-Scratch: many confirmation_required / placeholder rows are expected; do not fill missing SwRS, interface direction, task period, stack size, RTE port direction, or component split.
  • With-Reference: historical SwAD is sample only. It may guide section/table shape, never component/interface/task/resource facts. Include SEC-DIFF / TASK-DIFF when reference is used.

Typical Inputs

T1 source examples: SwRS, current project System Architecture, software context/layering, AUTOSAR/BSW/MCAL/OS constraints, RTE/service/internal API specs, diagnostics/degradation notes, chip/memory/timing budgets, existing TSR/software safety inputs for SEC-SAFE-ARCH citation only.

Template/checklist/reference/sample keep their roles. Historical SwAD is T4 sample unless the user provides explicit current-project source status.

Expected Sections

Core sections: scope, inputs/source boundary, software context/layers, upstream SwRS/System Architecture, logical architecture, physical/task architecture, components, interfaces/direction, SwRS allocation, diagnostics/degradation, safety-related architecture constraints by citation, resources/timing, verification candidates, assumptions/open items, review status, optional SEC-DIFF for With-Reference.

Critical Claims

Critical claims include architecture decomposition, upstream linkage, component definition, interface direction/boundary, allocation rationale, task/scheduling, diagnostics/degradation, resource/timing budgets, safety-related software architecture linkage, verification method, completeness/consistency/sufficiency, and final approval/compliance. They require T0/T1 support or remain NEEDS_USER_CONFIRMATION.

Forbidden Content

  • hazard、hazardous event、S/E/C、ASIL、Safety Goal as new HARA/FSR output.
  • TSR / technical safety mechanisms as TSC final content.
  • detailed design, unit design, algorithms, code, class-level implementation.
  • approved / compliant / ASPICE level achieved / ISO 26262 compliant / production ready.
  • sample SwAD components, interfaces, tasks, timing, resource budgets as project facts.

SEC-SAFE-ARCH may only cite existing TSR/software safety source and link it to components/interfaces/partitioning; no new HARA, ASIL, or TSR judgment.

Source Policy

T0=HITL, T1=current project source, T2=template/checklist, T3=reference methodology, T4=sample shape/style, T5=inference. Current project SystemArchitecture and SwRS can be T1. Historical SwAD cannot support SWA-COMP-xx, SWA-IF-xx, task periods, memory/stack budgets, interface timeouts, or allocation facts.

sample 绝不是 fact source。reference is not project-specific fact support.

Review / Verification Focus

  • SWE.2 architecture decomposition, allocation, interface, and design constraints.
  • Every component/interface/allocation has source or open.
  • Interfaces include direction, peer, boundary, responsibility.
  • Logical and physical architecture are consistent.
  • Diagnostics/degradation/resources/timing have source or open.
  • No HARA/ASIL/SG/TSR/TSC/detailed-design leakage.
  • Historical SwAD/sample not used as fact.
  • NEEDS_USER_CONFIRMATION preserved.

Final report is review-ready, not formal sign-off.

Keep looking

Skills are one crate of 607,721. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.