Launch readiness
Skill event4u-app/agent-config/dist/agent-src/skills/launch-readiness
Use before merging a release-shaped PR — pre-merge checklist, rollout plan, rollback criteria, ops handoff. Triggers on 'ready to ship', 'launch checklist', 'rollout plan for X'.From its SKILL.md
npx -y skills add event4u-app/agent-config --skill launch-readinessAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 7 stars7 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
9.3 KB, ~2.2k tokens by cl100k_base, as published. Nobody here has run it
launch-readiness
When to use
- A change is about to merge that crosses a release boundary (new feature on
main, version bump, public-facing comms attached). - An ops handoff is implied — the on-call rotation, support team, or downstream consumers need to know.
- A rollback criterion has not been written down yet.
Do NOT use for routine internal merges
(finishing-a-development-branch)
or for the comms text itself (release-comms).
This skill produces the decision to ship and the rollback contract.
Cognition cluster
- Mental model 10 — Reversible vs irreversible. Map every step
of the rollout to a reversibility class; the rollback criteria
must name the irreversible steps and the abort threshold for each.
See
docs/contracts/mental-models.md§ 10. - Mental model 29 — Pre-mortems. Imagine the rollout failed in
six hours; what failed first? The pre-mortem becomes the rollback
criteria, not a separate document. See
mental-models.md§ 29. - Mental model 4 — Second-order thinking. Enumerate what
becomes harder after the launch (rollback cost, contributor
ergonomics, doc churn). See
mental-models.md§ 4. - Team + product context-spine slots. Read team for the
on-call rotation and ops handoff path; read product for the
segment / cohort exposure of the rollout. See
context-spine.
Procedure
1. Identify the launch shape
One sentence: "This change ships X to segment Y behind
rollout mechanism Z." If you cannot, the change is not
release-shaped; route to finishing-a-development-branch.
2. Inspect the pre-merge checklist
Walk the diff with the following gates:
- Tests green on the integration suite (cite the run).
- Quality gates green (static analysis / linters / type-checks).
- Migrations are reversible OR the irreversibility is explicit.
- Feature flag / kill switch named, default off unless intended.
- Doc / changelog / release notes present (hand off to
release-commsfor the prose). - Rollback path tested at least mentally; named in step 4.
Cells without evidence block the launch — surface, do not hand-wave.
2b. Epistemics block — the diagnostic report (contract-backed)
For a consumer-facing diagnostic (not just the merge decision), emit a
report per docs/contracts/prelaunch-diagnostics.md
(schema: prelaunch-report.schema.json). Rules:
- Coverage backbone — diagnose exactly the fixed area vocabulary
(
prelaunch-areas.yml): auth · migrations · secrets · observability · rollback · agent-governance. No ad-hoc areas. - Every area gets one state:
pass(cited evidence REQUIRED) ·finding(IDs listed) ·unknown(honest default — absence of findings is Unknown, never an automatic Pass) ·not-applicable(reason required). - Findings carry immutable IDs (
AC-<AREA>-NNN) — retitle freely, never re-assign; the ID is the diff key across runs. - Verdict: any open P0 → NOT ready, regardless of every other area; any open P1 or a launch-gate area not at pass/N-A → NOT ready. Ready is the residual state, never the default.
- Questions section — list the questions that would change the diagnosis; the next run converts them into evidence or findings.
- Validate + verdict via
./scripts-run src/scripts/prelaunch_diagnostics validate <report.json>; regression-gate against the committed baseline via… diff <baseline> <current> --ci(contract § 4–6).
2c. Fix loop (approval-gated, read-only diagnostic)
Rank open findings by severity, then launch-gate membership; propose the
safest first approval batch (reversible, small blast radius — explicitly
not the full backlog). Status vocabulary per finding: open · fixed · accepted-risk · deferred-with-reason · suppressed-with-evidence · not-applicable — everything except open/fixed carries a reason. Rescore
whenever evidence changes. The diagnostic itself never mutates the project;
fixes flow through the normal approval-gated engines.
3. Plan the rollout
- Mechanism — flag, canary cohort, blue-green, immediate.
- Order — internal → trusted segment → general; cite the segment per stage from the product spine slot.
- Telemetry — the metric that proves rollout health.
- Owner — named role per stage (not name); from the team spine slot.
4. Write rollback criteria
For each stage:
- Trip wire — the metric value that fires rollback.
- Decision window — how long the trip wire must hold.
- Abort path — what the on-call does (revert PR, flip flag, drain queue), pre-rehearsed.
- Irreversible steps — explicit list; if any irreversible step is in scope, the launch needs a written sign-off, not implicit.
Pre-mortem rule: every trip wire must answer "what would have caused this in six hours?" If you cannot, the trip wire is wrong.
4b. Post-deploy verification fragments (manual checks, not an auto-canary)
Right after deploy, the on-call runs these quick checks by hand. They are checklist items, not an automated canary loop — a real canary is a runtime and out of scope here; these are cheap "did the deploy silently break a thing that doesn't page" probes. Include only the ones that apply to the stack:
- SSE / streaming heartbeat — if the app serves Server-Sent Events or a long-lived stream, confirm a connection stays open and emits a heartbeat past the proxy's idle timeout (a deploy that changes proxy/buffering config silently kills streaming while every other endpoint looks fine).
- Static-asset content-type drift — fetch a built asset and assert the
Content-Type(JS astext/javascript/application/javascript, CSS astext/css); a CDN/build change that serves assets astext/plainorapplication/octet-streambreaks the app in the browser but returns HTTP 200. - LCP delta — spot-check Largest-Contentful-Paint on the top route against the pre-deploy baseline; a regression beyond the agreed delta is a trip wire even when no error fires.
Each fragment is a one-shot check with a pass/fail an on-call can eyeball; failures feed the § 4 trip wires. Do not build a standing canary service for them.
5. Ops handoff
- Who is paged on which alert (from team spine slot).
- Where the rollback runbook lives (link).
- Date / time of the handoff conversation; sign-off from the receiving role.
6. Hand back
Hand the artefact below to whoever requested the launch decision;
route comms to release-comms and
post-launch metrics tracking to the team's monitoring stack.
Related Skills
WHEN to use this
- A release-shaped PR is about to merge.
- Rollback criteria need to land in writing before the merge button is pressed.
- Ops handoff is implied and not yet executed.
WHEN NOT to use this
- The change is internal and routine — route to
finishing-a-development-branch. - The output is the public comms — route to
release-comms. - The rollout decision involves stakeholder conflict — route to
stakeholder-tradeofffirst. - The decision is reversible-and-cheap — write a one-line note, skip the full artefact.
When the agent should load this
- "Sind wir launch-ready?"
- "Bau mir die Rollback-Kriterien für Phase X."
- "Ops-Handoff für die Release morgen."
- "Was bricht, wenn wir den Flag flippen?"
- "Pre-merge-Checklist für PR #N."
Output
- Launch shape — one-sentence statement of the change.
- Pre-merge checklist — gate · status · evidence (citation).
- Rollout plan — stages × mechanism · order · telemetry · owner.
- Rollback contract — per stage: trip wire · decision window · abort path · irreversible steps.
- Ops handoff — pager mapping · runbook link · sign-off.
- Outstanding — anything blocking the launch; explicit, not collapsed.
Gotcha
- A checklist with all green and no citations is theatre; every green needs an artefact.
- A trip wire without a decision window is unactionable — "if errors spike" is not a trigger; "5xx > 2% for 10 min" is.
- Irreversible steps without written sign-off are the most common post-mortem ancestor — surface, do not skip.
Do NOT
- Do NOT write the comms text here — that is
release-comms. - Do NOT lock the rollback contract verbally — it lives in the output block, citable.
- Do NOT let any stage own itself — every stage names a role from the team spine slot.
- Do NOT hand the artefact to a receiver who has not signed off on ops handoff.