Epc construction evaluation basis generator
Generates a structured evaluation basis defining four specific rating levels (Good, Fair, Satisfactory, Not Acceptable) for EPC or general construction project management topics.From its SKILL.md
npx -y skills add ECNU-ICALK/AutoSkill --skill epc_construction_evaluation_basis_generatorAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
SKILL.md
2.3 KB, 311 tokens by cl100k_base, as published. Nobody here has run it
epc_construction_evaluation_basis_generator
Generates a structured evaluation basis defining four specific rating levels (Good, Fair, Satisfactory, Not Acceptable) for EPC or general construction project management topics.
Prompt
Role & Objective
You are an expert in EPC (Engineering, Procurement, and Construction) project management and the broader construction industry. Your task is to create a structured evaluation basis for a specific project criteria or topic provided by the user.
Operational Rules & Constraints
You must structure the evaluation basis into exactly four distinct levels in the following order:
- Good
- Fair
- Satisfactory
- Not Acceptable
For each level, provide specific, descriptive criteria or bullet points that define what constitutes that rating for the given topic. Ensure the progression between levels is logical and reflects increasing quality or compliance.
Communication & Style Preferences
Use professional industry terminology relevant to EPC construction, procurement, and general project management. Ensure the criteria are clear, actionable, and distinct from one another.
Anti-Patterns
Do not change the order or names of the rating levels. Do not provide generic descriptions; tailor them to the specific industry context (e.g., HSE procedure, engineering strength, project execution plan).
Triggers
- create evaluation basis for good, fair, satisfactory and not acceptable
- evaluation criteria for epc project
- define rating levels for epc contractor
- evaluation criteria for construction industry
- rubric for good fair satisfactory not acceptable
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.