agentsclimarketplace

Schedule extractor

Skill dleerdefi/claude-code-construction/.claude/skills/schedule-extractor

Extract tabular schedule data from construction drawings — door, window, finish, fixture, panel schedules — and output to Excel. Triggers: 'door schedule', 'extract schedule', 'schedule to Excel', 'panel schedule'.From its SKILL.md

Install
npx -y skills add dleerdefi/claude-code-construction --skill schedule-extractor

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

3 things to look at

  • reads credentialsReads from 1 credential source: `.construction/database.yaml`.
  • runs commandsInstructs the agent to run 8 commands, including `{query_command} -c "SELECT id, schedule_type, title, sheet_id, bounding_region FROM schedules WHERE project_id = '{PROJECT_ID}'"` and 7 more.
  • fetches URLsInstructs the agent to fetch 1 URL, including {api_url}/projects/{project_id}/schedules/ingest.

SKILL.md

15.0 KB, ~3.8k tokens by cl100k_base, as published. Nobody here has run it

Schedule Extractor

Extracts tabular schedule data embedded in drawing sheets or spec pages and outputs structured Excel files. Schedules are typically one element among many on a sheet — or the entire sheet may be a schedule.

Workflow

Extraction Progress:
- [ ] Step 1: Discover schedule locations
- [ ] Step 2: Isolate (crop) the schedule region
- [ ] Step 3: Extract structured data (pdfplumber + vision)
- [ ] Step 4: Validate and clean data
- [ ] Step 5: Output to Excel
- [ ] Step 6: Write graph entry

Step 1: Discover Schedule Locations

Use a multi-source discovery approach, checking all available sources:

Source A — Sheet titles in sheet index (primary, most reliable)

Search .construction/index/sheet_index.yaml (or the sheet index you've built) for sheets with "SCHEDULE" in the title. Many important schedules occupy an entire sheet — the sheet title tells you exactly what it is:

  • "DOOR SCHEDULE" → entire sheet is a door schedule
  • "FINISH SCHEDULE" or "ROOM FINISH SCHEDULE" → entire sheet is finishes
  • "WINDOW SCHEDULE" → entire sheet is windows
  • "PANEL SCHEDULE" → electrical panel schedule
  • "FIXTURE SCHEDULE" → plumbing fixtures

For dedicated schedule sheets, the entire page is the extraction target — no need to crop.

Source B — AgentCM database query (supplementary)

If .construction/database.yaml exists, read query_command from it, then query known schedules:

# Read query_command and project_id from .construction/database.yaml
{query_command} -c "SELECT id, schedule_type, title, sheet_id, bounding_region FROM schedules WHERE project_id = '{PROJECT_ID}'"

This returns all schedules already detected (including stubs from Group Review with bounding regions). For embedded schedules on non-schedule sheets, check the bounding_region column.

Note: Schedule bounding region detection is still being refined — treat these as hints, not definitive boundaries. Always verify with vision.

Source C — Discipline-based heuristics

Schedules appear on specific sheet types:

  • Door schedule → typically on A-0.XX or A-8.XX sheets, or a dedicated sheet
  • Window schedule → same sheets as door schedule, or separate
  • Room finish schedule → A-0.XX or interior sheets
  • Panel schedule → E-X.XX electrical sheets
  • Fixture schedule → P-X.XX plumbing sheets
  • Equipment schedule → M-X.XX mechanical sheets

Source D — Vision scan (fallback)

If no index or graph is available:

${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} --dpi 150 --output full_sheet.png

Use vision on the full sheet image: "Identify any tabular schedules on this drawing sheet. Report the approximate bounding box coordinates (top-left x,y and bottom-right x,y) as percentages of the image dimensions, the schedule type, and the column headers visible."

Step 2: Isolate the Schedule Region

For dedicated schedule sheets (entire page is a schedule): Skip cropping — use the full page.

For embedded schedules (schedule is one element on a larger sheet):

Crop the identified region with padding:

${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/crop_region.py full_sheet.png \
  --box {x1},{y1},{x2},{y2} \
  --padding 20 \
  --output schedule_crop.png

Re-rasterize at higher DPI (300) for the cropped region to improve text clarity:

${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} \
  --dpi 300 \
  --crop {x1},{y1},{x2},{y2} \
  --output schedule_hires.png

Step 3: Extract Structured Data

Use a try → validate → fallback approach:

Method A — pdfplumber table extraction (try first)

Use pdfplumber's extract_tables() method on the target page. If multiple tables are found, select the largest one (most rows with the most columns — schedules are wide). The first row of the selected table contains headers; subsequent rows are data. If no tables are found or results look garbled, fall back to vision (Method B).

Evaluate Method A — Quality Gate

Check these criteria before proceeding:

  1. Row count: Did pdfplumber extract at least 10 data rows? Most schedules have 20-200+ entries.
  2. Column consistency: Do ≥80% of rows have the same number of columns? Inconsistent columns = parsing error.
  3. Non-empty cells: Are >50% of cells non-empty? Mostly-empty extraction = parsing failed.
  4. First column validity: Does the first column contain recognizable IDs (door numbers, room numbers, equipment tags)?

Decision:

  • All 4 checks pass → Method A succeeded, proceed to Step 4
  • Any check fails → Method A failed, use Method B below
QUALITY GATE:
  extracted_rows >= 10?          YES → check next  |  NO → use Method B
  column_consistency >= 80%?     YES → check next  |  NO → use Method B
  non_empty_cells >= 50%?        YES → check next  |  NO → use Method B
  first_col_has_valid_ids?       YES → use Method A |  NO → use Method B

Method B — Vision extraction (fallback)

When pdfplumber fails (common with complex layouts, merged cells, non-standard table lines):

  1. Rasterize the sheet at 150 DPI for overview:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} --dpi 150 --output full_sheet.png
  1. Use vision on the full sheet image to read the schedule directly:

"This is a construction drawing sheet containing a schedule (tabular data). Extract ALL rows from the schedule as a JSON array of objects. The first row of the table contains column headers — use those as object keys. Each subsequent row is one entry. Preserve exact values including dimensions, abbreviations, and codes. If a cell is empty, use null."

  1. For dense schedules with small text, re-rasterize at 300 DPI and crop to just the schedule region:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} --dpi 300 --output schedule_hires.png

Method C — Hybrid (for maximum accuracy)

Run both methods and cross-validate:

  • pdfplumber gives exact text positioning and catches every character
  • Vision catches content pdfplumber misses (stamps, handwritten marks, non-standard table layouts)
  • Compare row counts: if they differ by >10%, investigate the discrepancy
  • Use vision results for rows that pdfplumber returned empty or garbled

Step 4: Validate and Clean

After extraction (by either method):

  • Row count check: Compare extracted count against what's visually present. If off by >10%, re-extract using the other method.
  • Column structure: Verify headers match expected schedule type (door schedule has MARK/SIZE/TYPE/FRAME/HARDWARE; finish schedule has RM.NO/NAME/FLOOR/BASE/WALLS/CLG)
  • Merged cell cleanup: Expand merged header cells (e.g., "WALLS" spanning A/B/C/D sub-columns)
  • Normalize dimensions: 3' - 0" → 3'-0" (remove spaces around dashes)
  • Flag revisions: Note any cells within revision clouds or delta markers
  • Cross-reference with database: If .construction/database.yaml exists, read query_command from it, then verify room numbers via {query_command} -c "SELECT number FROM rooms WHERE project_id = '{PROJECT_ID}' AND number = '{room_number}'" and door numbers via {query_command} -c "SELECT tag_number FROM graph_elements WHERE element_type = 'door' AND tag_number = '{door_mark}'"

Step 5: Output to Excel

${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/scripts/schedule_to_xlsx.py \
  --data schedule_data.json \
  --type door_schedule \
  --project "Project Name" \
  --sheet "A-0.01" \
  --output "Door_Schedule_A-0.01.xlsx"

The script creates a formatted Excel workbook with:

  • Header row with project info and source sheet
  • Auto-sized columns
  • Conditional formatting for empty/flagged cells
  • Source metadata in a separate tab

Step 6: Ingest to Database

After Excel output, POST extracted data to the AgentCM schedule ingest API so it's stored in PostgreSQL, linked to rooms, and queryable by agents:

# Read api_url and project_id from .construction/database.yaml
curl -X POST "{api_url}/projects/{project_id}/schedules/ingest" \
  -H "Content-Type: application/json" \
  -d @schedule_ingest_payload.json

The ingest payload JSON follows this structure:

{
  "sheetId": "<uuid of the source sheet>",
  "scheduleType": "door",
  "title": "DOOR SCHEDULE",
  "rowEntityType": "door",
  "columns": [
    {"key": "MARK", "header": "MARK"},
    {"key": "WIDTH", "header": "WIDTH"},
    {"key": "HEIGHT", "header": "HEIGHT"},
    {"key": "TYPE", "header": "TYPE"},
    {"key": "FRAME", "header": "FRAME"},
    {"key": "HARDWARE_SET", "header": "HARDWARE SET"},
    {"key": "FIRE_RATING", "header": "FIRE RATING"}
  ],
  "rows": [
    {
      "entityIdentifier": "2.101A",
      "cells": {"MARK": "2.101A", "WIDTH": "3'-0\"", "HEIGHT": "7'-0\"", "TYPE": "A", "FRAME": "HM", "HARDWARE_SET": "HW-3", "FIRE_RATING": "1 HR"}
    }
  ],
  "sourceMethod": "pdfplumber",
  "confidence": 0.95
}

Schedule types and their rowEntityType:

  • Door schedule → "door" (room derived from door number: "2.101A" → Room 2.101)
  • Window schedule → "window" (room derived from window mark)
  • Finish schedule → "room" (entity identifier IS the room number)
  • Panel schedule → "equipment"
  • Fixture schedule → "fixture" (room linked spatially from plan tags)

The ingest endpoint automatically:

  1. Creates/updates the schedule record
  2. Inserts all rows with GIN-indexed jsonb cells
  3. Links rows to rooms (exact match, fuzzy match, or creates rooms from schedule data)
  4. Extracts finish/hardware codes into the code legends table
  5. Creates pending links for fixtures/equipment that need spatial resolution

Also write the graph finding entry (for backwards compatibility with existing skills):

${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/graph/write_finding.py \
  --type "schedule_extracted" \
  --title "Door schedule extracted from A-0.01" \
  --source_sheet "A-0.01" \
  --output_file "Door_Schedule_A-0.01.xlsx" \
  --data '{"schedule_type": "door", "row_count": 45, "columns": ["MARK","SIZE","TYPE","FRAME","HARDWARE SET"]}'

Schedule Reconciliation (Excel → DB Round-Trip)

When a PE edits an exported Excel schedule and wants changes applied back to the database:

Reconciliation Workflow

Reconciliation Progress:
- [ ] Step R1: Read metadata from edited Excel
- [ ] Step R2: Compute changeset (diff vs DB)
- [ ] Step R3: POST changeset to reconcile endpoint
- [ ] Step R4: Report summary to user

Step R1: Read Metadata from Edited Excel

Exported Excel files contain reconciliation anchors:

  • Hidden _agentcm_meta sheet with schedule_id, schedule_type, sheet_id
  • Hidden _row_key column A with entity identifiers (door numbers, room numbers, etc.)

If the Excel lacks _agentcm_meta, it was not exported by AgentCM — treat as a fresh import (re-run the extraction workflow above).

Step R2: Compute Changeset

Run the diff engine to compare the edited Excel against current DB state:

${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/scripts/xlsx_to_changeset.py \
  --excel "edited_schedule.xlsx" \
  --query-command "$(cat .construction/database.yaml | grep query_command | cut -d'"' -f2)" \
  --output changeset.json

The script:

  1. Reads _agentcm_meta → extracts schedule_id
  2. Reads data sheet → extracts _row_key column + all data columns
  3. Queries DB for current schedule rows/cells via psql
  4. Computes diff: cell changes, new rows, deleted rows, new columns, hidden columns
  5. Outputs a structured JSON changeset

Step R3: POST Changeset to Reconcile Endpoint

# Read api_url and project_id from .construction/database.yaml
curl -X POST "{api_url}/projects/{project_id}/schedules/reconcile" \
  -H "Content-Type: application/json" \
  -d @changeset.json

The reconcile endpoint applies changes with:

  • Override protection: All user edits set isUserOverride=TRUE — future re-extractions will not overwrite them
  • Audit trail: Every cell edit, row add/delete, and column change is logged to schedule_change_log
  • Conflict detection: If a re-extraction later disagrees with a user override, a conflict is created (not silently overwritten)

Step R4: Report Summary

The endpoint returns an ExcelReconcileResult:

{
  "rowsUpdated": 3,
  "rowsAdded": 1,
  "rowsSoftDeleted": 0,
  "cellsChanged": 7,
  "conflictsCreated": 0,
  "columnsAdded": 0,
  "columnsHidden": 0,
  "errors": []
}

Report the summary to the user. If errors is non-empty, surface those for review.

Anchored Excel Export

When exporting schedules for PE review, always include reconciliation anchors:

${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/scripts/schedule_to_xlsx.py \
  --data schedule_data.json \
  --type door_schedule \
  --project "Project Name" \
  --sheet "A-0.01" \
  --schedule-id "{schedule_uuid}" \
  --sheet-id "{sheet_uuid}" \
  --output "Door_Schedule_A-0.01.xlsx"

The --schedule-id and --sheet-id flags embed metadata in the hidden _agentcm_meta sheet, enabling the round-trip reconciliation workflow.

Schedule Type Reference

TypeCommon columnsNotes
DoorMark, Width, Height, Type, Frame, Hardware Set, Fire RatingCross-ref hardware sets with spec 08 71 00
WindowMark, Width, Height, Type, Glazing, Frame MaterialCheck for energy code compliance
Room FinishRoom #, Name, Floor, Base, North/South/East/West Walls, CeilingFinish codes defined in legend
PanelCircuit #, Description, Load (VA), Breaker Size, PhaseVerify total load vs panel capacity
Fixture (Plumbing)Mark, Description, Manufacturer, Model, ConnectionCross-ref with spec Division 22
Equipment (HVAC)Tag, Description, CFM/BTU, Voltage, WeightCross-ref with spec Division 23

File Safety

Never overwrite an existing schedule extraction. The export script uses safe_output_path() which appends _v2, _v3, etc. automatically.


Allowed Scripts

Allowed scripts — exhaustive list. Only execute these scripts during this skill:

  • ../../scripts/pdf/rasterize_page.py — rasterize PDF pages for vision extraction
  • ../../scripts/pdf/crop_region.py — crop schedule region from full sheet image
  • scripts/schedule_to_xlsx.py — Excel export with reconciliation anchors
  • scripts/xlsx_to_changeset.py — diff edited Excel against DB for reconciliation
  • ../../scripts/graph/write_finding.py — graph entry (Step 6)

What ships with it: 4 files

17.3 KB alongside SKILL.md, 3 of them executable

agents/

scripts/

Keep looking

Skills are one crate of 625,857. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.