Facilitate design workshop
Plan and facilitate design workshops — kickoffs, ideation/design-studio sessions, journey-mapping workshops, prioritization exercises, and design critiques run as group sessions. Use when asked to 'run a workshop', 'facilitate a session', 'plan a kickoff', 'run an ideation/brainstorm', 'do a design sprint exercise', 'run dot voting', 'prioritize as a group', 'run a design critique', or when preparing a whiteboard-challenge / collaborative exercise for a Product Designer interview loop. Covers agenda design, diverge-converge structure, timeboxing, voting mechanics, remote facilitation, and difficult-participant handling.From its SKILL.md
npx -y skills add dineshrevunuru/SuperSkills --skill facilitate-design-workshopAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
16.8 KB, ~4.0k tokens by cl100k_base, as published. Nobody here has run it
Facilitate Design Workshop
Turn a group of people with different agendas into one decision, one map, or one ranked list — inside a timebox, with every voice used and no voice dominating.
When to use / when NOT to use
Use when:
- A project needs group alignment or group generation: kickoff, ideation, journey mapping with stakeholders, prioritization, structured critique.
- You must design the agenda, pick activities, timebox them, and handle the room.
- You're prepping a collaborative exercise or whiteboard challenge for a PD interview loop.
NOT this skill:
- Judging design quality or wording a verdict →
craft-critique(this skill runs the critique session; that skill owns the feedback standard). - Producing HMW questions and need statements from research →
synthesize-research-dataowns those as its Define-stage output; this skill only uses them as ideation seeds. - Building the journey/empathy map artifact and its research grounding →
map-customer-journey; this skill owns running the mapping session. - Your own solo diverge-converge design loop →
explore-divergent-concepts. - One-on-one discovery with a stakeholder →
conduct-stakeholder-interviews. - Presenting finished work for buy-in →
present-and-defend-work.
Step 0 — Should this be a workshop at all?
A workshop spends N people × H hours. Gate it:
| You need… | Run instead |
|---|---|
| Information individuals already have | Interviews or a survey — cheaper, less groupthink |
| A decision one person owns | A decision memo with a recommendation (write-decision-rationale) |
| Feedback on finished work | A review, not a workshop (craft-critique) |
| Genuine co-creation, alignment, or a decision the group must own | A workshop. Continue. |
If you can't name the artifact the group will produce, don't book the room.
The method
1. Pick the workshop type (NN/g's five)
| Trigger | Type | Core output |
|---|---|---|
| Project starting; goals/scope/roles unclear | Discovery (kickoff) | Shared problem statement, goals, risks, roles |
| Team doesn't share an understanding of users | Empathy | Journey map / empathy map, prioritized pain points |
| Problem known; solutions needed | Design (ideation / design studio) | Clustered concepts + 1–3 chosen directions |
| Too many options, no agreed order | Prioritization | Ranked or quadrant-placed list with rationale |
| Work in progress needs structured feedback | Critique | Actionable, objective-anchored feedback list |
Mixed needs → split into separate sessions. A kickoff that also ideates and prioritizes produces three shallow outputs instead of one deep one.
2. Write the workshop goal as a fill-in
"By the end, the group will have produced [artifact] so that [decision or next step] can happen on [date]."
If the blank after "so that" is vague, the workshop is a meeting wearing a costume. Fix the goal before the agenda.
3. Design the agenda — the universal skeleton
Every workshop is this shape; only the middle activities change:
1. Open (5–10%) — goal, ground rules, warm-up
2. Ground (10–15%) — shared context: research insights, problem statement, constraints
3. DIVERGE (25–35%) — individual, silent generation FIRST; quantity over quality
4. Cluster (10–15%) — affinity-group the output; name the clusters
5. CONVERGE (15–20%) — vote / rank / place on matrix
6. Decide (10%) — say the decision out loud; test for consent
7. Close (5–10%) — owners, next steps, where the artifact lives
Diverge-converge is the law. Never let a group discuss its way to ideas — individuals generate silently, then the group converges. Group-first generation anchors on the loudest voice and the first idea.
Timeboxing rules:
- Every activity gets a visible countdown timer. Announce it, run it, end on it.
- Generation blocks stay short — 5–8 minutes. Pressure produces volume; comfort produces polish on one idea.
- Debrief time ≥ activity time. Sketches nobody discusses are theater.
- Build ~20% buffer into the total. A workshop that fills 100% of its slot ends mid-decision.
- When a block overruns: cut a later activity, never compress the converge/decide blocks. Deciding is the point.
4. Pick activities per phase
| Phase | Default activity | Mechanics |
|---|---|---|
| Warm-up | 30-second intro + one-word check-in | Gets every voice in the room within 5 minutes — people who haven't spoken by minute 10 rarely speak at all |
| Ground | Insight walk-through or lightning talk | 10 min max, facilitator or researcher presents; no debate yet |
| Diverge (ideas) | Crazy 8's: fold paper into 8, sketch 8 ideas in 8 minutes | Fat markers, no words-only sketches, no erasing |
| Diverge (ideas, deeper) | Design studio: sketch → 2-min pitch each → group critique → re-sketch | 2 rounds; second round steals shamelessly from round one |
| Diverge (problems/insights) | Silent sticky-note storm, one idea per note | 5 min, then read-aloud posting so ideas transfer without debate |
| Cluster | Affinity diagramming | Group similar notes; name clusters with a verb phrase, not a category noun ("can't tell if booking worked" not "feedback") |
| Converge | Dot voting (rules below) | Fast, democratic, good up to ~25 items |
| Converge (ties / high stakes) | Forced ranking | Each person ranks top 5; sum ranks; discuss only the disagreements |
| Decide | Impact-effort matrix placed live by the group | Quadrants: quick wins (do), big bets (plan), fill-ins (maybe), money pits (kill) |
Dot-voting mechanics (do these exactly):
- Clarify items before voting — questions first, campaigning never.
- Votes per person = items ÷ 4, minimum 3, maximum 6.
- Vote silently and simultaneously (remote: hide others' dots until reveal, if the tool allows).
- Most senior person votes last — or blind. A HiPPO's early dots magnetize everyone else's.
- Stacking allowed (multiple dots on one item) unless you need spread.
- Read the result as a signal, not a verdict: top 3–5 advance to discussion; the decider still decides.
Choosing a prioritization method:
- Group in the room, < 25 items, need speed → dot voting → impact-effort matrix.
- You have real reach/effort data → RICE (score async, discuss outliers live).
- Deadline fixed, scope negotiable → MoSCoW.
- Deciding which features delight vs. merely satisfy → Kano (needs user survey data — don't fake it in the room).
- No data at all → impact-effort with explicit "these placements are hypotheses" framing.
5. Run the room
- Facilitator ≠ participant. You steward the process; you don't pitch ideas. If you must contribute, say so explicitly and hand the pen back fast.
- Instructions twice: say them AND show them written on the board/slide. Then ask one person to repeat the task back.
- Silence is working time. Don't fill silent generation with talk.
- Park it publicly: a visible "parking lot" for off-topic-but-real issues. Naming it there is what lets you move on without dismissing the person.
- Close every loop: end with decisions restated, owners named, and where the artifact lives. Send the artifact within 24h — an unshared workshop output rots into "that meeting we had."
6. Critique sessions specifically
Run critique as a facilitated format, not open-mic reactions:
- Presenter states: what stage the work is at, what feedback they want, what's out of scope. Write these on the board.
- Feedback must anchor to a stated objective — facilitate with "which objective does that serve?" when comments drift to taste.
- No live redesigning. "What if you just…" goes to the parking lot.
- Feedback standard, verdict language, and evidence discipline: per
craft-critique. This skill only runs the session around it. - Close the loop: presenter states what they'll act on; follow up when they do — that's what keeps people bringing work to critique.
Remote facilitation deltas
- Cap at 2 hours with a break every 45–50 min. A full-day in-person workshop becomes 2–3 remote sessions.
- Pre-build the board (FigJam/Miro/Mural): one frame per activity, instructions written inside each frame, sticky templates ready. Participants should never create structure, only fill it.
- Tech check + pre-work async: context reading and even silent idea generation happen before the call; live time is for cluster-converge-decide.
- Co-facilitator required at 6+ participants: they watch chat, fix tech, and note parking-lot items while you run the room.
- Name-call gently: remote silence hides; round-robin ("Priya, then Sam") replaces "any thoughts?"
- One activity per frame; zoom the group to it. Free-roaming participants get lost and quietly disengage.
- Multitasking is the default remote failure: short blocks, frequent hand-offs, and visible timers are the countermeasure — not pleading for cameras.
Difficult-participant playbook
| Pattern | What it looks like | Do this |
|---|---|---|
| Dominator | Answers first, longest, every time | Structured turns: "Let's hear three voices we haven't yet." Give them a job (timekeeper, scribe) |
| HiPPO | Senior voice; room reorients to their opinion | Brief them beforehand to speak last; silent + simultaneous voting; ask them to frame constraints, not solutions |
| Skeptic ("workshops are theater") | Arms crossed, "we already know the answer" | Assign them the critic role explicitly in converge — skepticism is useful there; useless in diverge |
| Derailer | Real issue, wrong meeting | Park it visibly, name a follow-up owner, return to the timer |
| Silent one | Contributes nothing aloud | Silent-writing activities are your equalizer; then read-alouds and round-robins. Never cold-spotlight with "you've been quiet" |
| Wordsmither | Polishes sticky-note grammar while the timer runs | "Rough is right — we fix words after we pick ideas" |
| Live redesigner (critique) | "What if you moved that button…" | "Parking lot — critique names problems; the presenter owns solutions" |
Escalation rule: correct the process publicly ("let's return to the exercise"), correct the person privately at the break. Never argue content with a derailer mid-session — you become a participant and lose the room.
Worked example — 90-min remote prioritization workshop
Context: A booking product has a backlog of 18 proposed fixes for appointment no-shows. Team of 7 (PM, 2 engineers, designer, owner, 2 support staff). Goal fill-in: "By the end, the group will have produced a top-5 ranked fix list with impact-effort placement so that the next sprint can be scoped on Thursday."
| Time | Block | Activity | Output |
|---|---|---|---|
| 0:00–0:05 | Open | Goal + ground rules + one-word check-in | Every voice heard once |
| 0:05–0:15 | Ground | PM lightning talk: no-show data + top 3 support themes (pre-read sent Monday) | Shared context |
| 0:15–0:25 | Diverge | Silent pass: each person adds missing fixes as stickies (pre-built frame) | 18 → ~24 items |
| 0:25–0:35 | Cluster | Affinity-group duplicates; verb-phrase cluster names | ~14 distinct items |
| 0:35–0:40 | Clarify | Questions only — no advocacy | Items understood |
| 0:40–0:48 | Converge | Dot vote: 4 dots each, silent, owner votes last | Top 6 surface |
| 0:48–1:05 | Decide | Place top 6 on impact-effort matrix live; engineers anchor effort, support anchors impact | Quadrant placement |
| 1:05–1:15 | Decide | Discuss disagreements only (items where placement was contested) | Top 5 ranked |
| 1:15–1:25 | Close | Restate ranking aloud; owner confirms; name Thursday scoping owner; parking lot reviewed | Decision + owners |
| 1:25–1:30 | Buffer | (Used by 0:48 block — matrix placement always overruns) | — |
What this run catches — the two failures a naive version walks into. (1) At 0:05 the owner opened with "it's obviously the reminder SMS, let's just build that." The silent pass at 0:15 absorbs the pull to debate a favorite before anyone generates — the owner's fix lands as one sticky among ~24, not the anchor the room ranks around. Group-first discussion here would have ended the workshop at minute 10 with the loudest voice's answer. (2) The matrix block ran long (it always does). The buffer at 1:25 absorbed it and the 1:05–1:15 decide block stayed intact — because a session that clusters beautifully and never ranks produced nothing. Had it overrun further, the cut comes from Clarify or Cluster, never from the ranking.
Within 24h: board screenshot + top-5 list + parking-lot owners posted to the team channel.
Anti-patterns
| Don't | Do |
|---|---|
| Group brainstorming out loud from minute one | Silent individual generation, then share |
| Agenda with no artifact named | Goal fill-in first; artifact drives agenda |
| "Any thoughts?" to a silent remote room | Round-robin by name; silent-writing first |
| Voting before clarifying questions | Clarify → then silent vote |
| Letting the exec vote first | Senior votes last or blind |
| Compressing the decide block to fit overrun | Cut a diverge round instead — deciding is the point |
| Critique as open-mic reactions | Scoped objectives + facilitated turns (per craft-critique) |
| Workshop output living in the facilitator's head | Artifact shared within 24h, owners named |
| Booking a workshop to deliver information | Send a doc; workshops are for co-creation and decisions |
| 4-hour remote marathon | 2h cap, breaks every 45–50 min, pre-work async |
Output format (workshop plan)
# Workshop Plan: [name]
**Type:** discovery / empathy / design / prioritization / critique
**Goal:** By the end, the group will have produced [artifact] so that [decision/next step] by [date].
**Participants:** [names + roles + who is the decider]
**Mode:** in-person / remote — [tool]
**Pre-work:** [what, sent when]
## Agenda
| Time | Block | Activity | Instructions (verbatim) | Output |
## Materials
[Board link / frames, timers, markers, templates]
## Risks
[Named difficult-participant risks + planned countermeasures]
## After
[Artifact destination, share deadline, follow-up owner]
Sources
- 5 UX Workshops cheat sheet — https://www.nngroup.com/articles/5-ux-workshops/
- Workshop Facilitation 101 — https://www.nngroup.com/articles/workshop-facilitation-101/
- Facilitating a Design Studio Workshop — https://www.nngroup.com/articles/facilitating-design-studio-workshop/
- Foundational workshop activities (affinity, dot voting, forced ranking) — https://www.nngroup.com/articles/workshop-activities/
- Facilitating AI-Enhanced Workshops — https://www.nngroup.com/articles/facilitating-ai-workshops/
- Design Critiques: Encourage a Positive Culture — https://www.nngroup.com/articles/design-critiques/
- Following Up After a Design Critique — https://www.nngroup.com/articles/after-design-critique/
- Recovering Derailed Critiques — https://www.nngroup.com/articles/derailed-design-critiques/
- How-Might-We Questions — https://www.nngroup.com/articles/how-might-we-questions/
- Prioritization Methods (impact-effort, RICE, Kano, MoSCoW) — https://www.nngroup.com/articles/prioritization-methods/
- Prioritization Matrices — https://www.nngroup.com/articles/prioritization-matrices/
- Journey Mapping 101 — https://www.nngroup.com/articles/journey-mapping-101/
Boundaries
- craft-critique owns feedback quality, verdict language, and the evidence-discipline protocol; this skill owns the critique session — scope, turns, parking lot, follow-up.
- synthesize-research-data owns producing HMW questions and need statements (Define-stage outputs); this skill consumes them as ideation seeds.
- map-customer-journey owns the journey/empathy map artifact and its research grounding; this skill owns facilitating the group mapping session.
- explore-divergent-concepts owns Dinesh's solo research→concepts→pick loop; this skill owns the multi-person version.
- conduct-stakeholder-interviews owns 1:1 discovery; a kickoff workshop often follows those interviews.
- present-and-defend-work owns presenting finished work and handling dissent; workshops generate, presentations persuade.
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.