Dhtmlx js gantt

Skill DHTMLX/skills/dhtmlx-js-gantt

Agent skills for DHTMLX libraries - guardrails, patterns, and pitfall prevention for AI coding assistants working with DHTMLX Gantt, Scheduler, and other components

Install
npx -y skills add DHTMLX/skills --skill dhtmlx-js-gantt

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Builds and integrates core DHTMLX JavaScript Gantt into JavaScript or TypeScript applications. Covers setup, initialization, lifecycle, gantt.parse/gantt.load, templates, events, plugins, DataProcessor, task/link CRUD, projects/summary tasks, milestones, multiple instances, resources, calendars, undo/redo, row reorder, sortorder, baselines, critical path, locale/i18n, styling, and theming for dhtmlx-gantt (MIT Community edition at v10+, GPL Standard at v9.x), @dhx/trial-gantt, and @dhx/gantt (Professional). Applies when working with gantt charts, project timelines, task dependencies, task CRUD, summary tasks, milestones, resource panels, working calendars, lightboxes, workload views, baselines, or weekend highlighting, regardless of whether "DHTMLX" is mentioned by name. Provides verified API guidance rather than guessing core Gantt APIs and surfaces edition limits before scaffolding.

SKILL.md

8.4 KB, as published. Nobody here has run it

Source Of Truth

Use only:

  1. The current project's files, structure, and established patterns
  2. DHTMLX MCP for core Gantt API details: https://docs.dhtmlx.com/mcp
  3. Official DHTMLX Gantt docs as fallback: https://docs.dhtmlx.com/gantt/

Never invent config names, template callbacks, event names, method signatures, data shapes, or backend behavior.

If any core Gantt API detail is unclear, resolve it through DHTMLX MCP before writing code.

Preflight

Before writing code, identify:

  • delivery: npm package (dhtmlx-gantt, @dhx/trial-gantt, @dhx/gantt) — check package.json, imports, lockfiles. Or script tag / CDN — check <script> tags in HTML, vendored dhtmlxgantt.js, the @license banner inside that file, or the runtime gantt.license / gantt.version fields.
  • edition: the free dhtmlx-gantt package is MIT Community at v10+ and GPL Standard at v9.x — resolve which by version (gantt.version / lockfile), since the package name is shared (gantt.license is "mit" vs "gpl"). @dhx/trial-gantt and @dhx/gantt are Professional. The two free editions have different feature sets — MIT adds projects/milestones/custom types/multiple instances but drops undo, markers, multiselect, unscheduled tasks, the new-task placeholder, working-time calendars, and WBS. See references/editions.md for detection and the per-edition feature matrix.
  • runtime: plain JavaScript, TypeScript, Vite, browser-only <script>, or another app setup
  • outbound changes: no persistence, gantt.createDataProcessor, or custom backend/API clients
  • inbound changes: none, hard reload (gantt.clearAll + gantt.parse), or incremental updates via gantt.silent-wrapped API calls — see references/data-and-crud.md. For real-time streams use gantt.ext.liveUpdates — see references/live-updates.md.

Workflow

  1. Confirm the installed DHTMLX Gantt package and import path.
  2. Decide the outbound and inbound change strategies before implementing CRUD or external sync.
  3. Read only the reference file needed for the task:
  4. Use DHTMLX MCP before relying on advanced or unfamiliar APIs.
  5. Implement with documented APIs only.

MCP Server

This skill relies on DHTMLX MCP for API verification. If the dhtmlx-mcp tool is not available, ask the user to add it:

Claude Code:

claude mcp add --transport http dhtmlx-mcp https://docs.dhtmlx.com/mcp

Codex:

codex mcp add dhtmlx-mcp --url https://docs.dhtmlx.com/mcp

If MCP is not available, use the official docs at https://docs.dhtmlx.com/gantt/ as fallback.

Consult MCP First For

Consult DHTMLX MCP before using or changing:

  • template callbacks you have not already verified
  • lifecycle patterns around multiple instances or repeated mount/unmount
  • advanced DataProcessor modes, delete confirmation, resources, or assignments
  • row reorder config, events, and event signatures
  • resource panel, resource datastore, resource timeline, or histogram APIs
  • working calendar rules and work-time helpers
  • lightbox section types and option-list patterns
  • CSS variable names beyond the current project usage
  • gantt.plugins({...}) extension loading and the matching gantt.ext.* surfaces (critical path, marker, tooltip, keyboard navigation, undo, export, auto-scheduling)
  • locale and i18n customization via gantt.i18n.setLocale and gantt.locale.labels.*
  • baseline render templates and baseline data shape
  • gantt.ext.liveUpdates (RemoteEvents, remoteUpdates) and the multi-user backend WebSocket protocol

Hard Rules

  • The Gantt container must have explicit height.
  • Import the matching Gantt CSS.
  • Use the app theme as the single source of truth.
  • Prefer documented config, templates, events, and methods over undocumented internals.
  • Access resources, assignments, baselines, and custom datastores with gantt.getDatastore(...); never build application code around internal fields such as gantt.$resourcesStore or gantt.$data.*.
  • When schedule logic depends on working time, use Gantt's calendar-aware methods and pass task context where available: isWorkTime, calculateDuration, calculateEndDate, and getClosestWorkTime. Do not replace them with weekday checks or raw timestamp arithmetic.
  • Prefer semantic Gantt helpers such as isSummaryTask, eachTask, getParent, and uid over duplicating task-type detection, tree traversal, hierarchy lookup, or temporary-id generation.
  • Do not add manual render, datastore refresh, assignment-date synchronization, or resize loops after documented Gantt mutations unless the documentation for that exact flow requires it.
  • Keep DHTMLX init/parse/events/DataProcessor cleanup in one lifecycle boundary.
  • Normalize date values before persistence.
  • Build backend payloads explicitly from normalized task/link models.
  • Return { id: databaseId } or { tid: databaseId } after creates when the backend assigns a real id.
  • When applying external changes via gantt.addTask / updateTask / deleteTask (or link/datastore equivalents), wrap them in gantt.silent(...) so they do not echo back through the DataProcessor.
  • Treat row reorder as a dedicated batch flow, not a normal single-task update.
  • Gantt template return values (task_text, tooltip_text, column template, scale formatters, etc.) are injected as raw HTML. Sanitize or HTML-escape every user-supplied string before it enters Gantt (or in the template) — never trust task text, descriptions, resource names, or any other free-text field to be safe.
  • Before scaffolding a feature, confirm it exists in the detected edition (see references/editions.md). If it does not — a PRO feature on either free install, or a Standard/GPL feature (undo, markers, multiselect, unscheduled tasks, new-task placeholder, working-time calendars, WBS) on a MIT Community install — warn the user before scaffolding, naming the edition(s) that support it and the upgrade/switch path, then still scaffold the requested code. Do not silently substitute or omit it.

Quick Checklist

  • Correct package identified
  • Edition determined (MIT vs GPL resolved by version) and any feature unavailable in that edition flagged
  • Matching CSS import used
  • Explicit height provided
  • Outbound and inbound change strategies decided
  • Dates normalized before persistence
  • DataProcessor return values handled
  • Advanced APIs verified with MCP
  • No undocumented datastore fields or duplicate calendar/tree helpers used
  • Manual refresh or synchronization calls justified by the documented flow