agentsclimarketplace

Release

Skill deusXmachina-dev/memorylane/.agents/skills/release

Prepare a MemoryLane release by updating the version and release notes, then creating and pushing the tagged release commit that triggers CI. Use when the user asks to release, ship, publish, bump version, or cut a stable or prerelease version.From its SKILL.md

Install
npx -y skills add deusXmachina-dev/memorylane --skill release

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

3.8 KB, as published. Nobody here has run it

MemoryLane Release Workflow

Use this skill for both normal releases and prereleases. The GitHub Actions release pipeline builds macOS and Windows artifacts after the tagged commit is pushed. Tags without a suffix publish regular releases. Tags with a semver suffix such as -beta.1 publish GitHub prereleases.

Prerequisites

  • Working tree is clean (git status shows nothing to commit)
  • On the main branch, up to date with origin
  • Dependencies installed with npm install

Steps

1. Install dependencies

npm install

Always run this first so all workspace packages are present before any release edits, checks, or git operations.

2. Determine the new version

Ask the user if not provided.

  • Stable: MAJOR.MINOR.PATCH
  • Prerelease: MAJOR.MINOR.PATCH-label.N

The git tag format is always v<version>.

3. Review changes since the last tag

git log --oneline $(git describe --tags --abbrev=0)..HEAD
git diff --stat $(git describe --tags --abbrev=0)..HEAD

Summarize the key user-facing changes. This drives RELEASE_NOTES.md.

4. Bump version in package.json

Update the "version" field to the new version.

5. Update RELEASE_NOTES.md

Follow the existing format in the file. Keep the wording brief and current.

  • Title: # MemoryLane vX.Y.Z
  • What's Changed: Summarize the commits into user-facing bullet points. Reference GitHub issues where applicable (for example closes #4).
  • Features: Update the feature list if new capabilities were added.
  • Known Issues & Limitations: Remove any issues that have been resolved. Add new ones if applicable.
  • Installation: Keep the macOS and Windows install guidance aligned with the current release channel.
  • Full Changelog: Update the tag reference in the URL.

6. Update README.md if needed

Check the "Coming Soon" and "Limitations" sections. If a released feature is listed there, move or remove it.

7. Format and lint

npm run format
npm run lint

8. Commit and tag

Stage only the files you changed:

git add package.json package-lock.json RELEASE_NOTES.md
# Add README.md only if it changed for this release.
git add README.md
git commit -m "release: vX.Y.Z"
git tag vX.Y.Z

Create the tag only after the commit succeeds. Do not run git commit and git tag in parallel.

If the version is a prerelease, keep the same commit format and tag shape:

git commit -m "release: vX.Y.Z-label.N"
git tag vX.Y.Z-label.N

After tagging, verify it points at the release commit:

git rev-parse HEAD
git rev-parse vX.Y.Z

For prereleases:

git rev-parse HEAD
git rev-parse vX.Y.Z-label.N

These SHAs must match before pushing.

9. Push the commit and tag

git push origin HEAD
git push origin vX.Y.Z

For a prerelease version, push the prerelease tag instead:

git push origin HEAD
git push origin vX.Y.Z-label.N

Pushing the tag triggers .github/workflows/release.yml. That workflow builds both platforms and creates the GitHub release automatically.

Checklist

Before finishing, verify:

  • package.json version matches the new tag
  • package-lock.json version matches the new tag
  • RELEASE_NOTES.md title and changelog link reference the new version
  • Resolved known issues are removed from release notes
  • README.md "Coming Soon" doesn't list shipped features
  • npm install has been run before release steps
  • npm run format and npm run lint pass
  • Commit message matches the version tag
  • The correct v<version> tag is pushed to origin

Keep looking

Skills are one crate of 627,801. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.