Start here before writing any code — sizes task (S/L/H/Fix), sets up branch and session rules. Use when: "I'm starting on X", "quick fix for Y", "continuing from yesterday", "hotfix needed", "let's implement X", "skip to coding", "我要開始做 X", "快速修一下", "接續昨天的進度", resuming a feature branch, or any task that touches code. Not for: debugging (→ debug), authoring a plan doc (→ references/plan-template.md), pre-code design exploration (→ brainstorm), or code review (→ quality-pipeline).From its SKILL.md

Install
npx -y skills add cookys/autopilot --skill dev-flow

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 12 stars12 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

36.4 KB, as published. Nobody here has run it

Development Flow Evaluation

Project Config (auto-injected)

!cat .claude/dev-flow-config.md 2>/dev/null || true

Model Routing (for subagent dispatch)

!cat .claude/model-routing-config.md 2>/dev/null || true

If no project config above, use defaults from references/model-routing.md.

Dispatch Chains (for orchestrator routing)

!cat .claude/dispatch-config.md 2>/dev/null || true

If no project config above, autopilot's own fallback skills are primary for methodology; native Task dispatch for parallel; autopilot:reviewer for code review. See project-config-template/dispatch-config.md for the schema.


Phase 1: Session Start

Run before any code changes. Size determines which path executes.

S-Size Fast Path

Total overhead target: under 5 seconds.

1. Confirm task: restate what will be done in one sentence.
2. Branch check: `git branch --show-current` -- confirm on expected branch.
3. Proceed to S Workflow. No further gates.

S-size skips: branch freshness, knowledge/digest review, draft plan overlap, risk escalation.

L-Size Full Gates

All gates must pass before any code changes begin. If any gate is blocked, surface to the decision-maker (user in normal mode, CEO in CEO mode).

1. Record session start SHA:
   git rev-parse HEAD > .claude/session-start-sha

2. Branch check:
   git branch --show-current

3. Branch freshness:
   BEHIND=$(git log HEAD..main --oneline 2>/dev/null | wc -l)
   AHEAD=$(git log main..HEAD --oneline 2>/dev/null | wc -l)
   Evaluate using the freshness table below.
   If main does not exist (new repo), skip this gate.

4. Knowledge and digest review:
   Check .claude/knowledge/ for relevant prior learnings.
   Check for unprocessed session digests.

5. Draft plan overlap check:
   ls docs/plans/*.md 2>/dev/null  (or project-configured path)
   If draft plans exist, check if the current task overlaps with any draft plan
   (same feature, same module, or same user story).
   If overlap found:
   - Normal mode: surface to user -- confirm whether to proceed or adopt the draft.
   - CEO mode: CEO decides within DOA (tactical decision).
   If no draft plans or no overlap: proceed.

6. Skill routing:
   Check CLAUDE.md (or project config) for code-area-specific skills.
   If a skill is listed for the target code area, invoke it before writing code.
   **Active enforcement**: For L-size, this gate is backed by the L-1.6 TaskCreate
   parent task (see L Workflow → Task tracking). Reading this bullet is NOT enough —
   the TaskCreate is the forcing function that prevents skipping.
   If TaskCreate is missing from your tool list (Claude 5-era models are gated off by
   default since CC 2.1.233), warn the user once to set `CLAUDE_CODE_ENABLE_TODO_TOOLS=1`
   via `.claude/settings.json` `env` and continue without it — advisory, never a blocker
   (details: `references/multi-agent-portability.md`, task-persistence row).

Branch Freshness Table

BehindAheadStatusAction
0anyUp to date with mainProceed
1-5anySlightly behindProceed with note
>50Behind, no local workWarn user, recommend merge
>5>0DIVERGEDFlag to user before proceeding

Fix Path

Same lightweight start as S, plus branch creation:

1. Confirm root cause: restate the bug and known fix in one sentence.
2. Branch: `git checkout -b fix/<description>`
3. Skill routing check for the target code area.
4. Proceed to Fix Workflow.

Fix skips: knowledge/digest review, plan overlap, branch freshness (short-lived branch).

Context Continuation (Resuming Prior Work)

Resuming work on an existing feature branch with an active project → follow the 5-step procedure in references/context-continuation.md (uncommitted-changes check, SHA refresh, branch freshness, resume point, skill routing). Context continuation never re-evaluates size — it uses the size from the original session.


Session Rules (persist throughout)

These rules apply to ALL subsequent work in this session, regardless of which skills are invoked. They complement (not replace) any built-in skills — providing project-specific context.

Config Injection Rules

When performing these activities, FIRST read the corresponding config file if it exists. The config provides project-specific tools, commands, known issues, and conventions. If the config file does not exist, proceed normally without it.

ActivityConfig FileWhat It Contains
Debugging (bugs, crashes, logic errors).claude/debug-config.mdDebug tools, Docker commands, known gotchas, layer-by-layer diagnosis
Writing or running tests.claude/test-strategy-config.mdTest framework, commands, coverage thresholds, test pyramid conventions
Parallel task dispatch (team work).claude/team-config.mdRole templates, tech stack context, team size rules
Performance profiling.claude/profiling-config.mdProfiling tools, metrics collection, baseline commands
Comparison audit (old vs new).claude/audit-config.mdKnown by-design divergences, audit scope definitions
Methodology / reviewer / parallel dispatch routing.claude/dispatch-config.mdPreference chains for debugging / testing / profiling / team / review / parallel dispatch (also auto-injected at top of this skill)

Quality Gate Rule

Stated at the step that runs it — S step 2 / Fix step 4 run the project-config gate (default lint + test; the optional finish-flow route runs the stricter quality-pipeline --size S at F.1); L / H run autopilot:quality-pipeline via finish-flow L-5.2 / H-9.2. Enforcer: documented-only.

Session End Rule

When the user signals session end (or task completion for S-size):

  • Update project tracking if L-size (docs/projects/*/README.md + INDEX.md)
  • Record knowledge if something was surprising or took >1 retry (autopilot:learn)

Quick Decision

First ask: what kind of work is this?

NatureCriteriaWorkflow
FixBug fix — root cause known, solution clear. No design needed.Fix (any module count)
HProduction broken — immediate fix needed.Hotfix

If neither → size the feature:

SizeCriteriaWorkflow
SSingle commit (single module, no interface change, self-contained)Direct commit
LMultiple commits (3+ modules / public API / incompatible data / Feature Flag / user requests planning)Plan + Project

Fix vs L: "Do I need to design the solution, or just implement a known fix?" Design → L. Known fix → Fix.

Risk Escalation (force L for features): money/points, auth/security, production protocol changes. Risk-escalated bug fixes stay Fix but add PR review before merge.

驗證合約(必答)

Mandatory question: 「這個任務做完,跑什麼命令能客觀證明?」

答案機械判定路由
命令,且通過紅綠驗證見下方紅綠語意紅綠通過 ⇒ 驗證錨定恆成立(ratchet + 一輪 advisory review)。review 降為非 gating 需三條件同時:紅綠通過 且 implementer scorecard-qualified(機械定義:engine-scorecard.js status=qualified,由 engine-qualify.sh 的 known-bad 零漏放 bar 產生 — 非主觀判斷)且 risk=low(opus R2:連言架構 — 單靠騙過紅綠拿不掉否決權)
命令,但未過紅綠(vacuous)或紅無法成立自動降級同「無驗證」列
「沒有客觀驗證」(合法誠實答案)記入 run summary審查 gating 常駐,不分模型強弱(零機械觀測不可證偽;reviewer 是唯一觀測通道,保留否決權;模型強只降輪數 ≤2,不降為零)。此 gating review 優先派工具可執行的原生 reviewer(能實跑探索性檢查),而非 diff-text 軌(MiniMax R2)

紅綠語意:

  • base 定義: dispatcher 釘死的 immutable base SHA(engine --base;dev-flow inline = intake 時的 HEAD);dirty tree 不是 base。
  • base-run = base 的產品碼 + diff 中的驗證 artifact 套上去跑,避免純新增 TDD artifact 被誤降級。
  • 紅的資格 = assertion/行為失敗;基礎設施錯誤(檔案不存在、import error、collect 0)不算紅。
  • 紅必須可重現(flaky base-fail 重跑一次確認;不可重現 → 降級)。

Engine wiring: answer flows to engine implement-review --verify-cmd;non-gating only per conjunction(紅綠 ∧ scorecard-qualified ∧ risk=low),else keep --no-verify-first. Campaign identity requires --campaign-contract <campaign.json> and automatically owns durable ledger/resume. Side-effect warning: verify-cmd is dispatcher-authored, isolated-worktree, read-only expectation. The campaign contract is the mandatory durable-ledger authority boundary.

Scope Creep Detection

Size is evaluated once at start, but scope can grow silently. Two escalation paths:

S → L escalation is enforced by the S-scope-gate TaskCreate (created at S-start — see S Workflow). That task stays pending and surfaces before every tool use, forcing an explicit check before each commit. Passive self-checks after commits fail because memory is exactly what keeps failing.

L scope expansion (L work grows beyond its original README scope boundary — new subsystems, unplanned API surfaces, additional stakeholder requirements mid-flight):

After every phase completion, ask:
  "Does the REMAINING scope still match the README's scope boundary?"

Indicators of L-scope expansion:
  - New subsystem not listed in original README phases
  - Public API surface larger than original estimate
  - Estimate doubled (2x+ original effort)
  - User added requirements beyond original OKR

If expanded:
  → STOP. This is a Board Decision (user in normal mode, CEO escalates in CEO mode).
  → Update README scope boundary FIRST.
  → Only proceed after explicit approval.
  → Record in project decision log.

S Workflow -- Direct Commit

Scope gate (MANDATORY before any implementation): Create this task at S-start:

TaskCreate: "S-scope-gate: Evaluate scope before every commit"
  description: MANDATORY before every commit. Check all three indicators:
    (1) Fewer than 3 commits on this task so far?
    (2) Fewer than 3 different modules touched?
    (3) No features added beyond original goal?
  If ANY indicator is NO → STOP. Escalate to L:
    - Create project dir + README + INDEX (retroactive)
    - Record prior commits as completed phases
    - Create L-1.6 and L-5 TaskCreates, then continue with L Workflow tracking
  Mark this task ONLY when: work is complete AND scope stayed S throughout (all YES),
  OR L-escalation is complete and project tracking is in place.

This task stays pending and surfaces before every tool use — the forcing function that prevents "it was obviously S" from silently becoming a multi-module project without tracking.

  1. 驗證合約必答 — 見上
  2. Implement
  3. Quality gate (per project config, or: lint + test)
  4. Evaluate S-scope-gate indicators before committing
  5. Commit to current branch (descriptive message)
  6. Cleanup: if from backlog, delete the item

Unlike L's multi-task infrastructure, S creates exactly ONE TaskCreate: the S-scope-gate. Intentionally minimal — one pending task that surfaces the scope-creep check without adding L-level overhead.

S Session End (lite):

1. Retry check:
   "Did I retry any non-trivial operation 2+ times?
   If yes, invoke `learn` skill to record the finding."

2. Deferred items:
   If anything was postponed, add to BACKLOG with context + trigger condition.

3. Confirm commit:
   Verify the change landed on the correct branch.

S does not use TodoWrite -- too few steps to justify tracking overhead.


Fix Workflow -- Bug Fix (any module count)

Bug fix with clear root cause. No plan/project needed. Feature branch for traceability.

  1. 驗證合約必答 — 見上
  2. git checkout -b fix/<description>
  3. Investigate root cause (read code, trace data flow)
  4. Implement fix
  5. Quality gate (per project config, or: lint + test)
  6. Commit with detailed message: root cause + what was wrong + how it's fixed
  7. Write ongoing-maintenance entry — append one line to docs/projects/ongoing-maintenance/YYYY-MM.md (or the project-configured projects path — e.g. docs/ plural; check the injected config so you don't create a stray sibling tree): | MM-DD | commit_hash | fix(area): 根因 → 修法 (跨 N 模組) |
  8. Merge to develop
  9. Cleanup: delete fix branch

If the fix revealed a non-obvious lesson, invoke learn skill.

Fix does NOT create: plan, project dir, or PR (unless risk-escalated).


L Workflow -- Plan + Project

Continuous execution: proceed between Phases without asking "continue?". Stop only for: Staging Gate | Build/test failure | Design decision needed | Context near limit.

Task tracking (MANDATORY at L-1): Create Phase Todos at start (extract p0...pN + completion from plan) AND create TWO parent tasks. Both are non-optional forcing functions — missing either one = failed L-1 gate:

TaskCreate: "L-1.6: Skill routing — invoke required skills for all affected code areas"
  description: MANDATORY before any implementation phase. Input: the module/surface list
  produced by L-1.5 Scope Completeness Audit. For each affected area, consult project
  CLAUDE.md and/or .claude/skill-routing.md for required skills. Invoke each required
  skill via the Skill tool (reading the file is NOT invoking). Mark this task completed
  ONLY after:
    (a) every required skill has been invoked via Skill tool, AND
    (b) one-line summary of "what this skill told me for this task" is captured in
        session context (either a note or a TaskCreate subtask).
  If a module has no skill routing entry, mark N/A with a one-line justification.
  Phase implementation tasks (P0..PN) MUST be created with blockedBy=[this task] so
  they cannot start until skill routing is confirmed done.

TaskCreate: "L-5: Invoke autopilot:finish-flow"
  description: MANDATORY L-size completion. Invoke autopilot:finish-flow which will
  expand into 7 discrete sub-tasks (Final Goal Review, Pre-Merge Review, Merge,
  Post-Merge Review, Archive, L Session End, Delete merged branch). Do not mark this
  completed until the skill has run and all 7 sub-tasks reach completed.

Both parent tasks are forcing functions: they remain pending through every phase and are surfaced by system-reminder after each tool use. They cannot be silently skipped because marking them completed requires explicit work — L-1.6 requires Skill-tool invocations, L-5 requires invoking autopilot:finish-flow which itself creates 7 more discrete pending tasks.

Why L-1.6 exists (historical rationale): see references/historical-rationale.md § Why L-1.6 exists

Phase task dependency (mechanical enforcement, not just a reminder): When TaskCreating phase tasks P0..PN, each MUST be created with blockedBy=[L-1.6]. This means phases literally cannot be claimed/started until L-1.6 reaches completed. The system-reminder surfaces pending L-1.6 after every tool use; the blockedBy dependency makes starting implementation impossible without first resolving it. Two layers of defense.

If either parent task is missing at any point after L-1: STOP, create it retroactively, then continue. For L-1.6 specifically, if implementation has already started without skill routing: pause current phase, create L-1.6 now, invoke the missing skills, then resume.

L-1. Intent Confirmation

Confirm before starting. Record in the project README:

## Project Goal

> **Final goal**: [one sentence]
> **Success criteria**: [quantifiable conditions]
> **Scope boundary**: [explicit include/exclude]

Quantifiable means each criterion must include (a) a measurable threshold (number, percentage, boolean state, or named command output), AND (b) how it will be verified.

Example
PASS"API returns <200ms for 95th percentile (measured by load test)."
FAIL"Performance is acceptable."

Any criterion without a threshold or verification method means the plan is incomplete. Do not proceed until fixed. Select acceptance criteria from acceptance-patterns.md for acceptance-pattern selection (referencing pattern ids and evidence including negative controls).

CEO mode: SKIP intent confirmation -- CEO already confirmed OKR during Startup. Do not ask the user again.

Scope Completeness Audit (MANDATORY before phase TaskCreate)

A correctly-executed phase plan cannot recover from an incomplete scope. Before creating phase tasks, run a dimensions audit so the scope boundary reflects every surface this change touches, not just the one the task description mentions.

Create a discrete TaskCreate as the first item:

TaskCreate: "L-1.5: Scope completeness audit — enumerate all affected surfaces"
  description: Before phase TaskCreate. Walk the dimensions checklist below.
  For each "yes" row, either add a phase task for it OR document in README
  scope boundary why it's explicitly out-of-scope. Do NOT mark this task
  completed without dimension-by-dimension coverage recorded in README.

Dimensions checklist (non-exhaustive starter — add project-specific rows as needed):

DimensionTrigger
Source code + testsAlmost always
User-facing docs (README, guides, help text)Any user-visible behavior change
API / interface referenceAny public interface change
Config file templates / examplesAny new or changed config format
CHANGELOG entryAny release-worthy change to a versioned artifact
Version bump (semver)Any externally-visible change to a versioned artifact
Version sync verification (grep)Any version bump — grep the old version string across all tracked files (don't pre-filter by extension; tomorrow's repo may add .toml / Dockerfile / .yaml). If the grep returns N hits, the edit list must touch all N. Never enumerate the file list from memory
Migration guide / notesAny breaking change or schema change
Dependent repos / external consumersAny interface change with downstream consumers
Credit / attributionAny feature absorbing external OSS, prior art, or third-party design — README's Inspired By / credits / acknowledgements section must list the source(s)
Dogfood targetAny tooling/infra change (does it apply to itself?)

For each "yes" row, either:

  • Add a phase task covering it, OR

  • Document in README.md scope boundary why it's explicitly out-of-scope

  • User-stated requirements ledger: list EVERY requirement the user explicitly stated for this task (features, tests, docs, formats — verbatim-quote each) → map each to a phase/task. This ledger is carried to finish-flow L-5.1. An accepted requirement that maps to nothing = the audit FAILS.

Feeds into L-1.6: The module/surface list produced here is the direct input to the L-1.6 Skill routing TaskCreate. Every "Source code + tests" module enumerated here must have its required project skills invoked before any phase starts. Do not mark L-1.5 completed without first cross-referencing each module against .claude/skill-routing.md (or project equivalent).

Historical rationale (why this gate exists): see references/historical-rationale.md § Why the L-1.5 Scope Completeness Audit exists

Why "Version sync verification (grep)" and "Credit / attribution" exist (historical rationale): see references/historical-rationale.md § Why Version Sync Verification and Credit / Attribution exist

CEO mode: CEO performs the audit autonomously and records the coverage in the README scope boundary. Do not ask the user to enumerate dimensions — that's CEO tactical work.

L-2. Plan

  • User provides plan → use it directly, skip Plan Mode.
  • Needs design → EnterPlanMode → design → ExitPlanMode → user approval.
  • Save plan to: docs/plans/YYYY-MM-DD-<feature-name>.md

L-3. Project Setup (mandatory)

  • Create project directory structure, branch, update project index
  • Per project config for specific bootstrap commands

L-4. Per Phase

Goal verification -- answer all three before starting each phase:

  1. Does this change move us closer to the final goal?
  2. Is this phase essential — would skipping it prevent the final goal from being achieved?
  3. Does my understanding match the user's stated goal?

Pass threshold: Q1=yes, Q2=yes (essential), Q3=yes. Any "no" or "unsure" = blocked. Surface to decision-maker before proceeding.

CEO mode: CEO evaluates the three questions autonomously. Only escalate to user (Board) if the answer is "no" AND the required response is a strategic pivot (goal change, scope expansion) -- per CEO's DOA.

Drift signals:

SignalResponse
"This phase has low ROI, skip it"STOP -- Does it affect the final goal?
"We can do this later"STOP -- Any hidden dependencies?
"Project is basically done"STOP -- Has the final goal been achieved?
"User probably just wants..."STOP -- Ask and confirm directly.

Execution: Implement -> quality gate -> commit -> mark phase done.

Backlog safety (before deferring anything):

  1. Does this item affect the final goal? If yes, do NOT defer.
  2. Can the goal be achieved without it? If no, do NOT defer.
  3. Unsure? Ask the user.

If deferral passes: add to BACKLOG with context + trigger condition, mark phase "Deferred" in project docs.

Phase advance gate -- all must be true before starting the next phase:

  • Goal check: all three verification questions answered "yes"
  • Tests pass: zero failures
  • Completeness scan: no placeholder markers or stub implementations
  • Code review: no blocking issues remain
  • Project docs: progress row updated to reflect phase completion

CEO mode: CEO verifies all prerequisites. No user confirmation needed for passing gates.

L-5. Completion (MANDATORY — via finish-flow forcing function)

Invoke autopilot:finish-flow. That skill owns the L-size closing sequence. On invocation it TaskCreates 7 discrete sub-tasks (Final Goal Review → Pre-Merge Review → Merge → Post-Merge Review → Archive → L Session End → Delete merged branch), each with an explicit verification output. Every sub-task must be individually completed — they cannot be batched or compressed.

Why delegated: Historically L-5 was an inline 6-step list that got mentally compressed into "one action" and silently skipped. The finish-flow skill replaces passive markdown with active TaskCreate reminders that system-reminder surfaces until addressed. See autopilot:finish-flow for the full size → sub-tasks table.

CEO mode: All 7 sub-tasks are within CEO DOA (tactical, reversible, local git ops). CEO does not pause to ask the user between sub-tasks — execute all, then report.

Staging Gate

Trigger: Phase/feature awaiting user review | session ending with undeployed committed changes.

Deploy per project config (default: build + restart).


H Workflow -- Hotfix

Production is broken. Smallest possible fix, fastest path to stable.

Task tracking (MANDATORY at H-1): Create a parent closing task at the start:

TaskCreate: "H-9: Invoke autopilot:finish-flow"
  description: MANDATORY hotfix completion. Invoke autopilot:finish-flow which will
  expand into 6 discrete sub-tasks (verify fix, quality gate, merge to main, post-incident
  learn, delete hotfix branch, session end).
  1. git checkout -b hotfix/<description> main
  2. Scope check: if fix requires DB migration -> STOP, re-route to L. Cross-module bug fixes stay as H (or Fix if not production-critical).
  3. Fix the issue (smallest possible change)
  4. Invoke autopilot:finish-flow — it expands the remaining closing sequence into 6 discrete sub-tasks (verify fix → quality gate → merge to main --no-ff → post-incident learn (MANDATORY) → delete hotfix branch → session end). Each must be individually completed.

H workflow prioritizes speed. The forcing function does not add steps — it only prevents skipping the existing ones. For rollback situations, invoke finish-flow after the rollback is verified stable.


Session End

L-size and H-size: Session End is a sub-task inside autopilot:finish-flow (L-5.6 / H-9.6), not a standalone section you run yourself. Do not duplicate the checklist here — finish-flow creates the discrete tasks and this section is their reference material.

S and Fix: finish-flow is optional. You may either run the inline S-Lite below or invoke autopilot:finish-flow in TaskCreate form — whose Fix-size F.1 runs quality-pipeline --size S, a stricter gate than step 4's, not the same one.

S-Lite (S and Fix workflows, inline)

  1. Retry check: retried a non-trivial operation 2+ times? Invoke learn.
  2. Deferred items: anything postponed -> BACKLOG with context + trigger.
  3. Confirm commit: change landed on the correct branch.
  4. Fix only: verify ongoing-maintenance entry was written.

L-Full Reference (invoked by finish-flow L-5.6)

The L Session End sub-task (L-5.6) runs the full checklist below. Create a checklist and complete each item before concluding.

1. Verify completion:
   - User's last request is completed (or user explicitly said pause/stop).
   - No background work pending.
   - If on a feature branch: check if branch is merged to main.
     If not merged, flag to user before proceeding.

2. Update project docs:
   - Update project progress table and last-updated date.
   - Sync project index.
   - If 100% complete + merged: invoke project archival.

3. Knowledge extraction -- ask yourself:
   - Stepped on a non-obvious landmine?       -> record in .claude/knowledge/
   - Made an architecture decision?            -> record in project docs
   - Discovered a process gap?                 -> update relevant skill
   - Learned something cross-session useful?   -> record in persistent memory
   - None of the above?                        -> skip, do not force it

4. Deferred items:
   Anything postponed goes to BACKLOG with:
   - Context: what it is and why it was deferred
   - Trigger condition: when it should be picked up
   Backlog safety: if the item affects the final goal, do NOT defer.

5. Triggered BACKLOG pickup:
   Check if any BACKLOG items have their trigger condition met by this session's work.
   Scope "this session" using session-start-sha:
     git log --oneline $(cat .claude/session-start-sha 2>/dev/null || echo "HEAD~10")..HEAD
   Surface matches to decision-maker:
   - Normal mode: present to user for action.
   - CEO mode: CEO decides autonomously (tactical). Record in CEO Report.

6. Invoke learn skill:
   Produce a session learning summary covering:
   - Errors encountered and resolved (root cause + fix)
   - Key decisions made (rationale)
   - Surprises or counter-intuitive discoveries

7. Staging verify (if applicable):
   Confirm staging reflects latest code.
   Skip if: mid-implementation, only doc changes, or no staging environment.

8. Checklist summary:
   Output pass/fail for each gate. Include in PR description for L-size tasks.

Context Health Check (conditional)

If the session was long or context feels degraded, measure token budget:

Budget baseline: 200K tokens = 100%.
Approximate conversion: 1 token ~ 3.5 bytes (blended estimate for mixed-language codebases).

Report three layers:
- Fixed (loaded every session): CLAUDE.md, MEMORY.md, auto-injected context
- Loaded this session: skills invoked in current conversation
- On-demand (not yet loaded): remaining skills, knowledge files

If usage > 70%: flag for attention.
If specific files are bloated: recommend compress or split strategies.

Post-Feature Doc Sync

After code changes, verify documentation matches the new state — see the changed→update mapping table in references/post-feature-doc-sync.md. Skip doc sync for: bug fixes, minor value tweaks, log message changes.


Skill Routing (project-specific)

!cat .claude/skill-routing.md 2>/dev/null || true

Completeness Principle

AI makes the marginal cost of completeness near-zero. When choosing between approaches:

  • Option A (complete: all edge cases, full test coverage, proper error handling) vs Option B (shortcut: happy path only) -- always choose A.
  • This applies to: test coverage, error handling, edge cases, documentation, and feature completeness.

Anti-patterns

WrongCorrect
Bug fix escalated to L because it crosses 3 modulesUse Fix -- module count doesn't determine bug fix workflow
Ask "continue?" after PhaseProceed directly to next Phase
Team commit task says only "commit changes"Must include quality gate
User provides plan -> skip project setupProject dir must be created regardless
End session after mergeMust continue: post-merge -> archive -> session end
Skip branch freshness on L-sizeAlways check before starting L-size work
Force knowledge extraction when nothing happenedSkip -- do not force it
Defer work that affects the final goalNever defer goal-critical items
Re-evaluate size on context continuationUse size from the original session
Auto-execute context reduction without confirmationList confirm operations with numbered choices
Skip the L-1 / H-1 parent closing TaskCreate "because I remember the steps"The parent task IS the forcing function — memory is exactly what keeps failing; always create it
Skip the L-1.6 skill routing TaskCreate "because I already read CLAUDE.md"Reading ≠ invoking. The TaskCreate exists because passive bullets get mentally compressed into "I know this area". Invoke each required skill via the Skill tool, even if you "remember" it
Create phase tasks without blockedBy=[L-1.6]The dependency is the mechanical enforcement; a pending L-1.6 that doesn't actually block implementation is just another reminder to ignore
Mark L-1.6 completed after "reading" the skill files in knowledge baseReading skill markdown is not the same as Skill-tool invocation. The invocation loads the skill into the session context and creates the explicit decision record. Read ≠ invoke
Inline L-5 / H-9 steps instead of invoking finish-flowAlways invoke finish-flow; inlining defeats the TaskCreate forcing mechanism
Mark parent L-5 / H-9 completed while finish-flow sub-tasks still pendingParent only completes after all sub-tasks reach completed
Batch multiple finish-flow sub-tasks into one TaskCreate callEach sub-task is its own TaskCreate — batching breaks the surface-per-tool-use mechanism
Enumerate L-size phases before running the L-1.5 Scope Completeness AuditScope audit determines WHICH phases should exist — it runs first
Skip the scope audit "because the task is obvious"Invisible scope holes are the whole reason the audit exists; shipping an incomplete deliverable is always cheaper to prevent than to fix
Skip S-scope-gate TaskCreate "because it's clearly a small task"Scope creep is invisible at S-start — the gate exists precisely because it grows silently; always create it
Create S-scope-gate but only evaluate it at task endThe task must be created at S-start so system-reminder surfaces it before EVERY commit, not just at completion
L-size scope expands mid-project without Board notificationAny expansion beyond the original README scope boundary is a Board Decision — CEO/user must approve before continuing
Treat L-scope expansion as a tactical decision CEO can make aloneDoubled estimate or new subsystem = Resources 2x+ = requires Board approval per DOA

Pre-implementation Checklist

  • Check for existing in-progress projects
  • S-size: S-scope-gate TaskCreate created (scope-creep forcing function — MANDATORY before any implementation)
  • Fix: fix/ branch created, root cause confirmed
  • Fix: skill routing checked for affected module (passive — Fix stays lightweight, no TaskCreate; see BACKLOG for future Fix-workflow forcing function)
  • L-size: project structure created (plan + project dir + branch)
  • L-size: L-1.5 Scope Completeness Audit TaskCreate created
  • L-size: L-1.6 Skill routing TaskCreate created (parent forcing function, non-optional)
  • L-size: L-5 finish-flow TaskCreate created (parent forcing function, non-optional)
  • L-size: Phase tasks (P0..PN) created with blockedBy=[L-1.6]

User Override Protocol

User may request skipping process steps. When overridden:

  1. State which check is skipped and the associated risk
  2. Log [OVERRIDE: skipped {step}] in commit message
  3. Comply -- user has final authority

Cannot be overridden (explain why and suggest alternatives):

  • Migration integrity check (data corruption risk)
  • SQL injection / security validation
  • Completeness scan on new handlers/routes (invisible data loss)
  • Code review Critical-severity findings (security/correctness)

Capability-adaptive compatibility

This skill remains the canonical guided compatibility path. When a verified profile session is active, the host retains the full task graph, checklist, completed history, and future slices, then sends the worker only the current six-field active slice plus its matching envelope and role grant. A late profile/grant change requires a fresh-session handoff and never edits the project default. The profile-session.js lane is a no-effect isolation probe, not an effectful handoff gate; rehashable artifacts, same-process observations, and caller-authored traces cannot qualify one.

Mission Routing Override

When project governance configures mission_convergence, this section overrides every legacy Phase/P0 task-enumeration rule above.

Available Scripts

ScriptPurpose
scripts/mission-routing-admission.jsResolve project Mission policy and admit the authoritative bounded graph/source coverage before L-size TaskCreate or execution topology effects.
scripts/mission-execution-graph-check.jsValidate graph limits, exact source/rubric coverage, critical path, batches, gate attempts, aggregate reservations, and ICC campaign projection bounds.

Before any TaskCreate, branch, worktree, runner, or model effect:

node <autopilot-source>/scripts/mission-routing-admission.js \
  --repo-root "$(git rev-parse --show-toplevel)" --level <l3|l4|l5|l6>
  • READY is the only enforce-mode admission. Create one implementation TaskCreate per admitted graph node, plus the existing parent forcing-function tasks.
  • SHADOW is observation only. Record admitted/would_block honestly and continue through the legacy workflow without claiming an enforced receipt or grant.
  • LEGACY means project Mission policy is off.
  • Source Phase/P0..PN headings, modules, reviewer seats, tests, retries, repairs, and fallbacks remain coverage or gates inside a caller-authored bounded deliverable. They never become tasks one-for-one.
  • In READY, every legacy "phase" above means an admitted graph node, and instructions to extract P0..PN from source headings are disabled. Admitted implementation tasks remain blocked by L-1.6.
  • Topology fallback reuses the same admission and owning gate-attempt budget; it does not create a second graph or reset authority.
  • The project README keeps historical completed phases in a non-executable ledger and reports only current admitted deliverables as executable work.
  • Resume projection: on resume, Mission nodes are remaining deliverables only. An already integrated deliverable is omitted or satisfied by an authoritative receipt/commit — never redispatched. output_paths list required mutations for the new candidate, not historical files already in HEAD. Correct campaign rejection of historical-output replay is not a cue to rewrite those paths. This judgment is methodology until a deterministic gate lands (BACKLOG).