agentsclimarketplace

Division 28 electronic safety security bid scope

Skill ContractorKeith/contractor-bid/skills/division-28-electronic-safety-security-bid-scope

Whole-division starter rules for CSI Division 28 - Electronic Safety and Security. Use when starting, triaging, validating, or packaging a commercial security, access control, CCTV, or fire alarm bid.From its SKILL.md

Install
npx -y skills add ContractorKeith/contractor-bid --skill division-28-electronic-safety-security-bid-scope

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 4 stars4 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

2.4 KB, as published. Nobody here has run it

Division 28 - Electronic Safety and Security Bid Scope

Company: Your Company CSI division(s): 28 Spec section hints: 28 00 00, 28 05 00, 28 10 00, 28 13 00, 28 20 00, 28 31 00, 28 46 00

Scope Rule

Base bid is limited to CSI Division 28 - Electronic Safety and Security work specifically assigned to the bidder: access control, intrusion detection, video surveillance, electronic detection, fire alarm, and related safety systems. Door hardware, electrical power, network infrastructure, monitoring contracts, owner credentials, and fire protection must be explicitly included, excluded, or flagged before pricing.

Base Scope

  • access control systems when assigned
  • intrusion detection when assigned
  • video surveillance when assigned
  • fire alarm systems when assigned
  • safety and security cabling when assigned
  • head-end equipment and panels
  • testing and certification when assigned

Terms That Usually Identify This Scope

  • security
  • access control
  • card reader
  • CCTV
  • camera
  • intrusion
  • fire alarm
  • detection
  • 28 00

Adjacent Scope To Exclude By Default

  • electrical power
  • door hardware
  • locksmith
  • sprinkler
  • network switch

Adjacent Scope To Flag Before Pricing

  • door hardware
  • monitoring
  • network
  • permit
  • programming

Bid Package Workflow

  1. Put source PDFs, spreadsheets, and addenda in bid-docs/.
  2. Run contractor-bid triage <project> --profile division-28-electronic-safety-security.
  3. Review bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
  4. Fill takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
  5. Fill the takeoff JSON, then run contractor-bid build-workbook <project>.
  6. Run contractor-bid check <project> --profile division-28-electronic-safety-security before sending anything out.
  7. Record user corrections with contractor-bid learn and update this skill/profile when the correction should become a durable rule.

Guardrail

Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.

Keep looking

Skills are one crate of 627,801. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.