Division 28 electronic safety security bid scope
Skill ContractorKeith/contractor-bid/skills/division-28-electronic-safety-security-bid-scope
Whole-division starter rules for CSI Division 28 - Electronic Safety and Security. Use when starting, triaging, validating, or packaging a commercial security, access control, CCTV, or fire alarm bid.From its SKILL.md
npx -y skills add ContractorKeith/contractor-bid --skill division-28-electronic-safety-security-bid-scopeAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 4 stars4 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
2.4 KB, as published. Nobody here has run it
Division 28 - Electronic Safety and Security Bid Scope
Company: Your Company CSI division(s): 28 Spec section hints: 28 00 00, 28 05 00, 28 10 00, 28 13 00, 28 20 00, 28 31 00, 28 46 00
Scope Rule
Base bid is limited to CSI Division 28 - Electronic Safety and Security work specifically assigned to the bidder: access control, intrusion detection, video surveillance, electronic detection, fire alarm, and related safety systems. Door hardware, electrical power, network infrastructure, monitoring contracts, owner credentials, and fire protection must be explicitly included, excluded, or flagged before pricing.
Base Scope
- access control systems when assigned
- intrusion detection when assigned
- video surveillance when assigned
- fire alarm systems when assigned
- safety and security cabling when assigned
- head-end equipment and panels
- testing and certification when assigned
Terms That Usually Identify This Scope
- security
- access control
- card reader
- CCTV
- camera
- intrusion
- fire alarm
- detection
- 28 00
Adjacent Scope To Exclude By Default
- electrical power
- door hardware
- locksmith
- sprinkler
- network switch
Adjacent Scope To Flag Before Pricing
- door hardware
- monitoring
- network
- permit
- programming
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/. - Run
contractor-bid triage <project> --profile division-28-electronic-safety-security. - Review
bid-package-working/takeoff/candidate-pages.md(candidate pages plus scope signals). - Fill
takeoff/scope-pages-sources.json, then runcontractor-bid build-packets <project>. - Fill the takeoff JSON, then run
contractor-bid build-workbook <project>. - Run
contractor-bid check <project> --profile division-28-electronic-safety-securitybefore sending anything out. - Record user corrections with
contractor-bid learnand update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.