Division 25 integrated automation bid scope
Skill ContractorKeith/contractor-bid/skills/division-25-integrated-automation-bid-scope
Whole-division starter rules for CSI Division 25 - Integrated Automation. Use when starting, triaging, validating, or packaging a commercial building automation or integration bid.From its SKILL.md
npx -y skills add ContractorKeith/contractor-bid --skill division-25-integrated-automation-bid-scopeAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 4 stars4 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
SKILL.md
2.4 KB, as published. Nobody here has run it
Division 25 - Integrated Automation Bid Scope
Company: Your Company CSI division(s): 25 Spec section hints: 25 00 00, 25 05 00, 25 08 00, 25 10 00, 25 30 00, 25 50 00, 25 90 00
Scope Rule
Base bid is limited to CSI Division 25 - Integrated Automation work specifically assigned to the bidder: building automation integration, networking, controllers, programming, sequences, analytics, and system interfaces. Mechanical controls in Division 23, electrical power, low-voltage cabling, cybersecurity requirements, and owner platform work must be explicitly included, excluded, or flagged before pricing.
Base Scope
- integrated automation controllers
- building automation software when assigned
- integration gateways and interfaces
- sequences and programming
- automation network coordination
- graphics and trend setup when assigned
- commissioning support when assigned
Terms That Usually Identify This Scope
- integrated automation
- building automation
- BAS
- BMS
- DDC
- controls integration
- gateway
- sequence of operation
- 25 00
Adjacent Scope To Exclude By Default
- electrical power
- mechanical equipment
- low-voltage cabling
- fire alarm
Adjacent Scope To Flag Before Pricing
- owner platform
- cybersecurity
- network
- commissioning
- training
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/. - Run
contractor-bid triage <project> --profile division-25-integrated-automation. - Review
bid-package-working/takeoff/candidate-pages.md(candidate pages plus scope signals). - Fill
takeoff/scope-pages-sources.json, then runcontractor-bid build-packets <project>. - Fill the takeoff JSON, then run
contractor-bid build-workbook <project>. - Run
contractor-bid check <project> --profile division-25-integrated-automationbefore sending anything out. - Record user corrections with
contractor-bid learnand update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.