Risk register
Portable, version-controlled Claude Code configuration — structured engineering workflows with problem definition, systems analysis, and verification gatesFrom the repository description
npx -y skills add chriscantu/claude-config --skill risk-registerAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.