Wip review

Skill bromso/metapowers/plugins/project-management/skills/wip-review

Review work-in-progress against sprint goal and capacityFrom its SKILL.md

Install
npx -y skills add bromso/metapowers --skill wip-review

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

5.0 KB, ~1.2k tokens by cl100k_base, as published. Nobody here has run it

WIP Review

Review work-in-progress for "$ARGUMENTS". Count items by status, check WIP limits, compare progress to burndown, identify bottlenecks and idle capacity, and recommend adjustments.

Prerequisites

Check that .project/$ARGUMENTS/00-initiate.md exists. If it does not, tell the user to run an Initiate skill first (e.g., project-charter) and stop.

If the user passes --skip-checks, skip the prerequisite check and log the skip to .project/$ARGUMENTS/skip-log.md with a timestamp and reason.

Process

  1. Read existing context:

    • Read .project/$ARGUMENTS/00-initiate.md for team roster and project context
    • Read .project/$ARGUMENTS/02-sprint.md if it exists (for sprint state, standups, and previous WIP reviews)
    • Read .project/$ARGUMENTS/01-plan.md if it exists (for sprint backlog, assignments, and capacity)
  2. Count items by status:

    • Categorize all sprint backlog items into columns: To Do, In Progress, In Review, Done
    • Count items and story points in each column
    • Calculate percentage of total work in each status
    • Show the flow: how many items moved between columns since the last review
  3. Check WIP limits:

    • Recommended WIP limit: no more than 2 items per person in progress at any time
    • For each team member, count their in-progress items
    • Flag anyone exceeding the WIP limit (context switching reduces productivity)
    • Flag anyone with zero in-progress items (possible idle capacity or blocker)
    • If the team as a whole has too much WIP, recommend finishing before starting
  4. Compare progress to burndown ideal line:

    • Calculate sprint progress: % of sprint elapsed (days elapsed / total sprint days)
    • Calculate work progress: % of sprint goal completed (points done / total points committed)
    • Compare the two: work progress should be close to or ahead of sprint progress
    • Classify status:
      • Ahead: work progress > sprint progress + 10%
      • On Track: work progress within 10% of sprint progress
      • Behind: work progress < sprint progress - 10%
      • At Risk: work progress < sprint progress - 25%
    • If behind or at risk, calculate how much work needs to complete per remaining day to recover
  5. Identify bottlenecks:

    • Where is work piling up? (e.g., many items in "In Review" means review capacity is the bottleneck)
    • Are there stories that have been in progress for more than 2 days without moving? (stuck work)
    • Is one person assigned to too many stories? (overloaded team member)
    • Is one skill area blocking others? (e.g., all backend work done but frontend is bottlenecked)
    • For each bottleneck, explain the impact and suggest a remedy
  6. Identify idle capacity:

    • Who has bandwidth to take on more work?
    • Are there team members who completed their tasks and have nothing queued?
    • Can idle capacity be redirected to help with bottlenecks?
    • Is idle capacity a sign that work was not broken down enough (large stories blocking parallelism)?
  7. Calculate sprint goal completion percentage:

    • % of sprint goal completed = completed story points / committed story points
    • % of sprint elapsed = days elapsed / total sprint days
    • Sprint health ratio = (% goal completed) / (% sprint elapsed)
    • Health ratio > 1.0 = ahead, 0.9-1.0 = on track, 0.7-0.9 = behind, < 0.7 = at risk
    • Project estimated completion: at current velocity, when will committed work be done?
  8. Recommend adjustments:

    • If ahead: consider pulling stretch goals into the sprint
    • If on track: maintain current pace, no changes needed
    • If behind: recommend specific actions:
      • Re-prioritize: focus on sprint-goal stories, defer non-essential work
      • Swarm: redirect idle capacity or multiple people to the most critical stories
      • Cut scope: remove stretch goals or negotiate committed scope with the product owner
      • Resolve blockers: escalate any blockers that are slowing progress
    • If at risk: recommend an immediate conversation with the product owner about scope
  9. Write the artifact — append to .project/$ARGUMENTS/02-sprint.md under a ## WIP Review section:

    • Status Board — items and points by column (To Do, In Progress, In Review, Done)
    • WIP Limit Check — per-person WIP count with flags for violations
    • Burndown Status — sprint progress vs. work progress with classification
    • Bottlenecks — identified bottlenecks with impact and remedies
    • Idle Capacity — team members with bandwidth and suggested reallocation
    • Sprint Health — completion percentage, health ratio, and projected completion
    • Recommended Adjustments — specific actions based on current status

Output

WIP review appended to .project/$ARGUMENTS/02-sprint.md. Present a summary highlighting:

  • Sprint burndown status (ahead/on-track/behind/at-risk)
  • Sprint health ratio
  • Number of WIP limit violations
  • Top bottleneck and recommended action
  • Key adjustment recommendation