Sprint review

Skill bromso/metapowers/plugins/project-management/skills/sprint-review

Prepare sprint review — what was done, what wasn't, stakeholder demo planFrom its SKILL.md

Install
npx -y skills add bromso/metapowers --skill sprint-review

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

4.4 KB, 971 tokens by cl100k_base, as published. Nobody here has run it

Sprint Review

Prepare a sprint review for "$ARGUMENTS". Summarize what was completed, what was not, compare delivery to the sprint goal, and prepare a demo agenda for stakeholders.

Prerequisites

Check that .project/$ARGUMENTS/00-initiate.md exists. If it does not, tell the user to run an Initiate skill first (e.g., project-charter) and stop.

If the user passes --skip-checks, skip the prerequisite check and log the skip to .project/$ARGUMENTS/skip-log.md with a timestamp and reason.

Process

  1. Read existing context:

    • Read .project/$ARGUMENTS/00-initiate.md for project charter and stakeholder context
    • Read .project/$ARGUMENTS/01-plan.md for sprint backlog, sprint goal, and velocity target
    • Read .project/$ARGUMENTS/02-sprint.md for standup history, blocker log, and WIP reviews
  2. List completed stories:

    • For each story in the sprint backlog, determine if it is done (all acceptance criteria met)
    • For completed stories, confirm that acceptance criteria were verified (not just code-complete)
    • Note any stories that were completed but with caveats (partial scope, known issues, tech debt created)
    • Calculate total story points completed
  3. List incomplete stories:

    • For each story not completed, explain the reason: blocked, underestimated, descoped, started late, dependency missed
    • Determine if the incomplete story should carry over to the next sprint or return to the backlog
    • Note how much work remains on each incomplete story (percentage done, remaining tasks)
    • Distinguish between stories that were never started and stories that were started but not finished
  4. Compare actual delivery to sprint goal:

    • Restate the sprint goal from the sprint planning
    • Assess whether the sprint goal was achieved, partially achieved, or missed
    • If partially achieved, explain what parts were delivered and what was not
    • Calculate commitment ratio: completed points / committed points as a percentage
    • Note any work completed that was not in the original sprint backlog (unplanned work, stretch goals)
  5. Prepare demo agenda:

    • Select which completed features to demo (not everything — focus on what stakeholders care about)
    • Order the demo to tell a story: start with the most impactful feature, build logically
    • For each demo item, note: what to show, the key takeaway, and expected time (2-3 minutes each)
    • Identify who will present each item (the person who built it, or a designated presenter)
    • Total demo time should be 15-20 minutes, leaving 10 minutes for questions
  6. List stakeholder questions to address:

    • Anticipate questions stakeholders will ask based on the sprint results
    • Prepare concise answers for: why was X not completed, when will Y be ready, what changed from the plan
    • Note any decisions needed from stakeholders during or after the review
    • Identify topics that need a separate follow-up meeting (do not try to resolve everything in the review)
  7. Gather feedback themes for backlog refinement:

    • Based on sprint outcomes, identify themes for backlog adjustment
    • Were estimates accurate? If not, what type of work was underestimated?
    • Were there recurring blockers that suggest a systemic issue?
    • Did stakeholder priorities shift during the sprint? How should the backlog reflect this?
    • Note any new work items surfaced during the sprint that should be added to the backlog
  8. Write the artifact — append to .project/$ARGUMENTS/03-review.md under a ## Sprint Review section:

    • Sprint Goal Assessment — goal statement, achieved/partial/missed, rationale
    • Completed Stories — list with acceptance criteria status and points
    • Incomplete Stories — list with reasons and carryover recommendation
    • Commitment Ratio — completed points / committed points
    • Demo Agenda — ordered list of features to demo with presenters and timing
    • Stakeholder Questions — anticipated questions with prepared answers
    • Feedback Themes — observations for backlog refinement

Output

Sprint review appended to .project/$ARGUMENTS/03-review.md. Present a summary highlighting:

  • Sprint goal achievement status
  • Commitment ratio (completed vs. committed points)
  • Number of stories completed vs. total
  • Demo agenda overview (features and total time)
  • Top feedback themes for backlog refinement