Risk assessment

Skill bromso/metapowers/plugins/project-management/skills/risk-assessment

A Claude Code plugin that adds an agentic skills framework, with MCP's and a meta prompting processes. Inspired by "Superpowers" & "Figma Console MCP", but not just for development or design; but for all aspect within the digital production cycle.

Install
npx -y skills add bromso/metapowers --skill risk-assessment

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Identify score and plan mitigations for project risks

SKILL.md

4.7 KB, as published. Nobody here has run it

Risk Assessment

Identify, score, and plan mitigations for risks in "$ARGUMENTS". Brainstorm risks across categories, score each by likelihood and impact, plot on a risk matrix, define mitigation strategies for top risks, assign owners, and set a review cadence.

Prerequisites

None — this is a utility skill. It can be run at any time, with or without existing project artifacts.

If .project/$ARGUMENTS/ exists, read any available artifacts for context. If it does not exist, proceed based on information the user provides.

Process

  1. Gather context:

    • If .project/$ARGUMENTS/ exists, read available artifacts for project scope, team, timeline, and stakeholder information
    • Ask the user about the project or initiative if no context is available
    • Understand the project phase — risks differ between early planning, active development, and delivery
  2. Brainstorm risks across categories:

    • Technical: architecture complexity, dependency risks, performance bottlenecks, security vulnerabilities, tech debt, integration challenges, unfamiliar technologies
    • People: key-person dependency, skills gaps, team turnover, availability conflicts, onboarding delays, team morale
    • Schedule: deadline pressure, dependency chains between workstreams, scope creep, underestimated effort, long feedback loops
    • Scope: unclear or changing requirements, conflicting stakeholder priorities, gold-plating, missing acceptance criteria
    • External: vendor delays, third-party API changes, market shifts, regulatory changes, competitor moves, budget cuts
    • Aim for 10-20 risks across categories — enough to be thorough without being overwhelming
    • Write each risk as a specific statement: "X may happen, causing Y" (not vague concerns)
  3. Score each risk by likelihood and impact:

    • Likelihood (1-5): 1 = rare, 2 = unlikely, 3 = possible, 4 = likely, 5 = almost certain
    • Impact (1-5): 1 = negligible, 2 = minor, 3 = moderate, 4 = major, 5 = severe
    • Risk score = likelihood x impact (range 1-25)
    • Document brief rationale for each score — why this likelihood? why this impact level?
  4. Plot on risk matrix and classify:

    • High risk (score 15-25): requires active mitigation, regular monitoring, escalation plan
    • Medium risk (score 8-14): needs a mitigation plan, monitor periodically
    • Low risk (score 1-7): accept and monitor, revisit if conditions change
    • Present the risk matrix visually as a table with likelihood on one axis and impact on the other
  5. Define mitigation strategy for each high and medium risk:

    • Avoid: eliminate the risk by changing the plan (e.g., drop a risky feature, choose a proven technology)
    • Transfer: shift the risk to someone else (e.g., insurance, outsource to a specialist, use a managed service)
    • Mitigate: reduce likelihood or impact (e.g., add testing, build a prototype, cross-train team members, add buffer)
    • Accept: acknowledge the risk and prepare a contingency plan if it occurs
    • For each mitigation: describe the specific action, estimated effort, and how it reduces the risk score
    • Define trigger conditions — what signals that this risk is materializing?
  6. Assign risk owners:

    • Each high and medium risk gets a single owner (one person accountable for monitoring and mitigation)
    • The owner does not have to do all the work — they ensure the mitigation plan is executed
    • Match owners to their area of expertise or responsibility
  7. Set review cadence:

    • High-risk projects: weekly risk review (5-10 minutes in standup or dedicated slot)
    • Normal projects: biweekly risk review
    • Stable projects: monthly risk review
    • At each review: check for new risks, update scores on existing risks, verify mitigations are progressing, close resolved risks
  8. Write the artifact — save to .project/$ARGUMENTS/risk-assessment.md:

    • Risk Register — table with columns: ID, Category, Risk Statement, Likelihood, Impact, Score, Classification, Strategy, Owner
    • Risk Matrix — visual matrix showing risk distribution
    • Mitigation Plans — detailed plans for each high and medium risk
    • Review Cadence — frequency and format for risk reviews
    • Next Review Date — when to revisit this assessment

Output

Risk assessment saved to .project/$ARGUMENTS/risk-assessment.md. Present a summary highlighting:

  • Total risks identified and distribution across categories
  • Number of high, medium, and low risks
  • Top 3 risks with their scores and mitigation strategies
  • Recommended review cadence