Rat p4p5 impl verify
Phase 4-to-5 pipeline: implement RTL then verify from existing P1-3 docs, with P5-to-P4 feedback; stops before Phase 6. Trigger: 'implement and verify'.From its SKILL.md
npx -y skills add babyworm/rtl-agent-team --skill rat-p4p5-impl-verifyAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
SKILL.md
1.7 KB, as published. Nobody here has run it
<Use_When>
- Phase 1-3 design documents exist and RTL implementation is needed
- User says "implement and verify", "uarch to verify", "Phase 4 and 5"
- Need RTL + verification but not design review (Phase 6) </Use_When>
<Do_Not_Use_When>
- Phase 3 μArch specs are not complete (run rat-p1p3-spec-uarch first)
- Only need RTL implementation without verification (use rtl-p4-implement)
- Need the full pipeline from spec (use rat-auto-design) </Do_Not_Use_When>
Prerequisites
Phase 3 completion with review required:
docs/phase-3-uarch/must contain at least one μArch specreviews/phase-3-uarch/uarch-review.mdmust exist
If prerequisites are missing: WARNING — recommend completing Phase 1-3
(via /rtl-agent-team:rat-p1p3-spec-uarch). Proceed with available artifacts — orchestrator will adapt scope.
Execution
Task(subagent_type="rtl-agent-team:uarch-to-verify-orchestrator", prompt="Execute Phase 4→5 RTL implementation and verification pipeline. User input: $ARGUMENTS")
Do not perform any work directly. The orchestrator agent manages prerequisite verification, dual-stream Phase 4, sub-phase Phase 5, feedback loops, and state management.