agentsclimarketplace

Well architected

Skill avelikiy/great_cto/skills/well-architected

Don't buy software. Get the work done. GreatCTO ships AI autopilots that run a whole business function — medical coding, legal docs, procurement, accounting, IT, tax — from intake to outcome. A qualified human signs only the judgment calls. Live connectors, built-in compliance.

Install
npx -y skills add avelikiy/great_cto --skill well-architected

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

6-pillar architecture review framework. Adapted from AWS Well-Architected for use by great_cto's architect agent on every non-nano ARCH document. Forces explicit answers across operational excellence, security, reliability, performance, cost, and sustainability — not just feature design.

SKILL.md

6.3 KB, ~1.5k tokens by cl100k_base, as published. Nobody here has run it

Well-Architected — 6 pillars to verify before shipping

Every ARCH document for non-nano work must answer the 6 pillar questions below. Skipping a pillar is allowed only if explicitly justified (e.g. "Sustainability: N/A — backend-only, runs in shared infra.").

This is adapted from AWS Well-Architected (lens: small-team SaaS / LLM applications), trimmed to questions that matter at <10 engineer scale.

Pillar 1 — Operational excellence

Questions

  1. Observability: What metrics, logs, traces do we emit? How do we tell from a dashboard if this is working in prod?
  2. Deployability: How do we ship a change? CI gates? Rollback path?
  3. Runbooks: When this breaks at 3am, what does on-call read?

Pass criteria

  • ✅ One metric per business outcome (e.g. webhook-deliveries-acked)
  • ✅ One log line per request, with request-id correlatable across services
  • ✅ Deploy path is documented and tested (rollback dry-run executed)
  • ✅ Runbook covers top-3 failure modes from pre-mortem

Common fail

❌ "We'll add monitoring later." Monitoring is part of the feature.

Pillar 2 — Security

Questions

  1. Trust boundaries: Where does untrusted data enter? How is it validated/sanitized?
  2. Authn / authz: Who can call this? Who can read/write the data?
  3. Secrets: Where are API keys, DB passwords, JWT signing keys stored?
  4. Data classification: PII? PHI? PCI cardholder data? What's the retention policy?

Pass criteria

  • ✅ Every external input has explicit validation at the boundary
  • ✅ Authz is enforced at the data layer, not just UI
  • ✅ Secrets in env vars or secret manager, never in source
  • ✅ Sensitive data classified and retention policy defined

Common fail

❌ "JWT validates the user, that's our authz." JWT is authentication. Authorization is separate (this user can read THIS row).

Pillar 3 — Reliability

Questions

  1. Failure modes: What happens when a downstream dependency is slow / down / corrupted?
  2. Idempotency: Can a retried request safely re-execute?
  3. Backups & recovery: What's the RPO (data-loss tolerance)? RTO (downtime tolerance)? Test plan for both?
  4. Capacity: What's the max QPS this can handle? What happens at 1.5x that?

Pass criteria

  • ✅ Circuit breakers / timeouts on external calls
  • ✅ State-mutating endpoints accept idempotency keys
  • ✅ Backups documented + restore tested in the last 90 days
  • ✅ Load test exists; results in docs/perf/

Common fail

❌ "Postgres has backups." Backups without a tested restore aren't backups.

Pillar 4 — Performance efficiency

Questions

  1. SLOs: What's the p50/p95/p99 latency target? Error rate? Availability?
  2. Bottlenecks: Profile the critical path — what's the slowest step?
  3. Caching: What's cacheable? Cache invalidation strategy?
  4. Scaling: Vertical or horizontal? Auto-scale rules?

Pass criteria

  • ✅ SLO numbers in the ARCH doc (not "fast enough")
  • ✅ Profile attached for non-trivial requests
  • ✅ Cache strategy documented; invalidation explicit
  • ✅ Scaling decision justified by data, not "feels right"

Common fail

❌ "Database can handle it." Quantify: queries/sec, row count, index hit rate.

Pillar 5 — Cost optimization

Questions

  1. Hot path: What's the most expensive operation per request? Why?
  2. Right-sizing: Is the chosen instance type / model / DB tier the smallest one that meets SLO?
  3. Cleanup: What happens to old data? Old logs? Old branch environments?

Pass criteria

  • ✅ Use skill cost-model to document explicit $ numbers
  • ✅ Choose smallest LLM model that meets quality SLO (haiku before sonnet, sonnet before opus)
  • ✅ Retention policy for logs, metrics, old data

Common fail

❌ Defaulting to Opus / GPT-4 when Haiku would work. Test on Haiku first.

Pillar 6 — Sustainability (env / energy)

Questions

  1. Workload efficiency: Is the code O(n log n) when it could be O(n)?
  2. Idle resources: Can dev environments scale to zero overnight?
  3. Data minimization: Do we collect / store data we never query?

Pass criteria

  • ✅ Hot loop complexity documented
  • ✅ Non-prod resources have shutdown schedules
  • ✅ Data lifecycle covers ingestion, retention, deletion

Common fail

❌ Logs at debug level in prod, never reviewed. Waste of storage + carbon.

Output format — add to ARCH

## Well-Architected review

### 1. Operational excellence
- Metrics: <list>
- Deploy path: <link to runbook>
- Verdict: PASS | RISKS LISTED

### 2. Security
- Trust boundaries: <list>
- Data classification: <PII / PHI / PCI / none>
- Verdict: PASS | RISKS LISTED

### 3. Reliability
- Failure modes: <link to pre-mortem>
- Idempotency: <yes/no per endpoint>
- Verdict: PASS | RISKS LISTED

### 4. Performance
- SLOs: p99=<ms>, error_rate=<%>, availability=<%>
- Verdict: PASS | RISKS LISTED

### 5. Cost
- Per-request cost: $<amount>
- Verdict: PASS | RISKS LISTED

### 6. Sustainability
- Hot-path complexity: O(<n>)
- Verdict: PASS | N/A | RISKS LISTED

## Open risks (rolled up)

<bullet list of all RISKS LISTED items + mitigation in plan>

When PASS is acceptable with risks listed

Not every architecture is bulletproof. PASS-with-risks is OK if:

  • Each risk is explicit (not hand-waved)
  • Each risk has either a mitigation in the plan OR explicit acceptance by the user
  • The pre-mortem section addresses the top-3 risk-score items

Gate:plan can approve a PASS-with-risks; gate:ship needs the mitigations shipped.

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 327,069. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.