agentsclimarketplace

Pm planning

Skill avelikiy/great_cto/skills/pm-planning

Don't buy software. Get the work done. GreatCTO ships AI autopilots that run a whole business function — medical coding, legal docs, procurement, accounting, IT, tax — from intake to outcome. A qualified human signs only the judgment calls. Live connectors, built-in compliance.

Install
npx -y skills add avelikiy/great_cto --skill pm-planning

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

What its author says it does

Copied from the file, not written here

Decomposition methodology for pm agent — turns an approved ARCH document into a Beads task list with explicit dependencies, time-boxes, and acceptance criteria. The pipeline can only orchestrate work it can see; this skill defines what "seeable work" looks like.

SKILL.md

5.0 KB, as published. Nobody here has run it

PM planning — decompose ARCH into tasks

The pm agent's job is to take the architect's ARCH document and produce 2 things:

  1. A PLAN-<feature>.md for humans
  2. A sequence of bd create tasks for senior-dev to claim

The plan is good if a fresh senior-dev (no prior context) can pick up the bd tasks and ship without coming back for clarification.

The decomposition rules

Rule 1. Tasks ≤ 4 hours

Anything bigger gets split. If the task is "build the auth system", split into:

  • Schema migration for user table
  • Signup endpoint with hashing
  • Login endpoint with JWT issuance
  • Logout / token revocation
  • Tests

Each ≤ 4h. If you can't split, the task is unclear — go back to ARCH and clarify.

Rule 2. Single output artefact per task

Each task produces ONE of:

  • A code file (new or modified)
  • A database migration
  • A test file
  • A documentation update
  • A config change

If a task produces multiple unrelated artefacts, split it.

Rule 3. Explicit dependencies via --blocks

When task B requires task A's output:

bd create "Task A: schema migration" -p P1
# returns id: my-proj-001-abc

bd create "Task B: signup endpoint" -p P1 \
  --blocks-on my-proj-001-abc \
  --label senior-dev

The pipeline orchestrator reads bd ready --assignee senior-dev to know what's claimable. Tasks blocked on incomplete predecessors don't appear.

Rule 4. Acceptance criteria — what does "done" mean?

Every task description ends with a bulleted "Done when:" section.

## Done when:
- [ ] POST /signup returns 201 with user_id on success
- [ ] Bad email returns 400 with "invalid_email"
- [ ] Duplicate email returns 409 with "email_taken"
- [ ] Password is hashed with argon2 (no plaintext in DB)
- [ ] Unit test in `tests/auth/signup.test.ts` covers all 4 cases
- [ ] `npm test` passes

Senior-dev knows EXACTLY what to ship and when to stop.

Rule 5. Owners and parallelism

If 3 tasks can run in parallel, mark each with the agent it goes to. Don't bundle them.

bd create "..." --label senior-dev
bd create "..." --label senior-dev   # parallel
bd create "..." --label devops       # parallel, different agent

The PLAN-*.md template

# PLAN — <feature>

Date: <ISO>
Architect ARCH: docs/architecture/ARCH-<feature>.md
Owner: pm

## Summary

2-3 sentences. What problem, what solution. Reference ARCH for detail.

## Cost estimate

(Follow skill: cost-model)

## Tasks

1. **<title>** [P1, ≤2h, senior-dev]
   - Goal: <one-sentence>
   - Done when: <bulleted criteria>
   - bd id: <ID after create>

2. **<title>** [P1, ≤4h, senior-dev]
   - Blocked on: 1
   - Goal: ...
   - Done when: ...

3. **<title>** [P2, ≤1h, qa-engineer]
   - Blocked on: 1, 2

## Pre-mortem

(Follow skill: pre-mortem)

## Gates

(Follow GATES_BY_ARCHETYPE for this archetype + project_size)
- [ ] gate:plan — after pm finishes, before senior-dev starts
- [ ] gate:qa — after qa-engineer, before ship
- [ ] gate:ship — after security-officer, before devops

When pm should push back instead of plan

The pm agent is allowed — and EXPECTED — to refuse a plan if the ARCH is incomplete. Specifically:

ARCH is missing acceptance criteria for the feature itself. Push back: "ARCH says 'build webhook handler' but doesn't specify what counts as success. Re-architect with explicit success criteria."

ARCH doesn't specify the failure mode. Push back: "ARCH says 'handle errors gracefully' but doesn't say what 'graceful' means. Define: log + ack? log + retry? log + alert?"

ARCH conflicts with existing ADRs. Push back: "ARCH proposes Postgres but ADR-005 mandated DynamoDB. Resolve before plan."

Push-back goes to the architect with bd update + label re-arch. The plan is BLOCKED until ARCH is refined.

Anti-patterns

Tasks named after components, not goals. "Build UserService" is ambiguous. "Add POST /signup endpoint that hashes password with argon2" is clear.

No dependencies declared. Two tasks editing the same file with no --blocks-on will conflict. Always declare.

Estimating without doing one task. If you genuinely don't know how long task 1 takes, ask senior-dev to do task 1 first and report back. THEN estimate 2–N.

Tasks > 8 hours. Split. No exceptions.

Keep looking

Skills are one crate of 328,083. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.