Wave planner acpx

Skill Asm3r96/wave-driven-dev/skills/wave-planner-acpx

Wave-Driven Development skills for coding agents: contract-first planning, parallel wave execution, and controlled integration with acpx.

Install
npx -y skills add Asm3r96/wave-driven-dev --skill wave-planner-acpx

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Plan and execute large multi-step, multi-stack changes with contract-first waves, parallel worker ownership, user approval gates, ordered integration, and final verification/docs updates through acpx. Use this when you explicitly want cross-CLI or cross-provider workers instead of Codex subagents.

SKILL.md

5.5 KB, as published. Nobody here has run it

Wave Planner

Create and run a Wave-Driven Development plan for large, cross-stack tasks.

Objective

Produce:

  • Vision and scope boundaries
  • Decision Log
  • Wave 0 contracts
  • Wave 1..N parallel implementation waves
  • Integration wave
  • Final verification wave
  • Documentation update step
  • Saved plan file
  • Ready-to-send worker prompts and execution checklist

Workflow

  1. Decide whether to use this skill:
  • Use only if work is large, multi-step, and touches multiple parts/stacks.
  • If not large enough, do not use this skill.
  • If the user is already in Codex and does not need external workers, recommend using wave-planner instead.
  1. Ask for Gate 1 user approval before planning:
  • Send a short reason: "I recommend Wave method because <short reason>. Do you agree?"
  • Stop until user accepts or declines.
  1. If accepted, draft the plan:
  • Clarify done criteria and out-of-scope.
  • Build Decision Log (naming, API shape, error model, logging, tests, style constraints).
  • Define Wave 0 contracts first (types/interfaces/schemas, boundaries, API shapes, constants, flags/migrations).
  • Save the plan by default inside .planning/; create the folder if it does not exist.
  • Use a clear feature-based filename for the plan.
  1. Choose wave and agent count with balancing rules:
  • Use the minimum number of waves that still avoids conflicts.
  • Group independent tasks into the same wave.
  • Move dependency-bound tasks to later waves.
  • Keep each worker task medium-sized (not tiny and not overloaded).
  • Ensure each worker has explicit file/module ownership.
  1. Produce a one-line execution preview before full detail:
  • One line per wave.
  • One line per worker with task summary.
  1. Produce the full plan with complete shared context:
  • Include full vision and all waves so each worker sees global intent.
  • Include worker-specific goals, files, constraints, and verification.
  • Include explicit wave order for execution (Wave 0, then Wave 1..N, then Integration, then Final Verification, then Docs).
  • Make each worker prompt highly specific: exact ownership, exact files/modules, exact handoff format, exact verification steps, and any important non-goals.
  • Save the full plan to the plan file by default; do not dump the full plan in chat unless the user explicitly asks.
  1. Ask for Gate 2 user approval before execution:
  • "Plan is ready. Execute now?"
  • Stop until user accepts or declines.
  1. If accepted, load and use acpx skill, then execute:
  • Use acpx to create/run named sessions per worker in current wave.
  • Use --prompt-retries when transient failures are likely or already observed.
  • Use --suppress-reads when cleaner logs are helpful for orchestration.
  • Run workers in parallel inside a wave, but execute waves sequentially.
  • Wait for all workers in wave to finish and validate handoffs before next wave.
  • Close worker sessions after completion.
  1. After all waves:
  • Main agent reviews merged result and runs verification tests.
  • Main agent updates existing docs if needed, or adds new docs for new features.
  • Follow existing documentation format and conventions.
  • Main agent updates the original plan file status to Completed or Blocked.
  • Main agent adds final verification notes to the original plan file.

Global Rules

  • Gating rule: planning and execution require explicit user approvals (Gate 1 and Gate 2).
  • Ownership rule: workers edit only assigned files.
  • Dependency rule: if outside scope is needed, return a Dependency Note instead of editing.
  • Consistency rule: follow existing repo patterns; do not invent new architecture unless requested.
  • Verifiability rule: each worker includes at least one concrete verification method.
  • Ordering rule: wave order is strict; do not start next wave early.
  • Session rule: one named session per worker; close finished sessions.
  • Plan-location rule: save plans in .planning/ by default and create the folder if needed.
  • Worker-context rule: every worker must read the original plan file first for the full picture before editing.
  • Verification-scope rule: run targeted checks first, then broader final checks; report unrelated pre-existing failures clearly as outside scope.
  • Docs rule: docs update is mandatory in final step (update existing docs or add new).

Model Routing Configuration

Read templates/model-routing.md before choosing models.

Rules:

  • Classify each worker task as hard, middle, or easy.
  • Select the first available model from that class's ordered list.
  • If a model fails/unavailable, fallback to the next model in order.
  • If placeholder guidance still exists in routing config, stop and tell user to edit routing first.

Mandatory Worker Handoff Format

  1. Summary (1-3 lines)
  2. Files changed (exact list)
  3. Patch/diffs (or exact edits)
  4. How to test (commands + expected result)
  5. Risks/TODOs/Dependency Notes
  6. Main plan log entry (what to append to shared execution log)
  7. Completion marker: WAVE {WAVE_ID} / {AGENT_NAME} DONE

Output Contract

Always output the final plan using this section order:

  • A) Vision
  • B) Decision Log
  • C) Contracts (Wave 0)
  • D) Waves (1..N with agents)
  • E) Integration + Final Verification + Docs
  • F) Worker prompts
  • G) Execution checklist (acpx sessions + wave order)

Use templates from templates/ when helpful.