agentsclimarketplace

Parallel execution strategy

Skill aneja5/forge-skills/skills/parallel-execution-strategy

An assembly line for AI software development. 35 skills, 11 agent personas, 29 commands. From raw idea to shipped code.

Install
npx -y skills add aneja5/forge-skills --skill parallel-execution-strategy

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 3 stars3 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Use when 3+ independent tasks are ready in .forge/tasks.yaml and multiple agents will work concurrently, when assessing file-conflict risk before dispatching parallel work, when planning branch and merge sequencing for a sprint, or when prior parallel runs have caused merge nightmares.

SKILL.md

7.6 KB, ~1.8k tokens by cl100k_base, as published. Nobody here has run it

Parallel Execution Strategy

Overview

Plan parallel agent execution before dispatching — so two agents never edit the same file, so integration is verified between merges, and so the merge order is fixed in advance. Output is .forge/parallel-plan.md — dependency-free task groups, file-conflict risk per group, branching strategy (one branch per task), PR sequencing, agent isolation (separate worktrees), and integration-test cadence. Pairs with planning-and-task-breakdown (the source tasks.yaml) and git-workflow (the branch and PR mechanics).

When to Use

  • .forge/tasks.yaml has 3+ tasks marked ready and they appear independent
  • Multiple engineers or agents are about to start work in the same week
  • A prior parallel run caused merge conflicts at the end and the team wants a better plan
  • A sprint is about to begin and capacity is "split N ways"

When NOT to Use

  • Only one task is ready — sequential is correct
  • Tasks form a strict dependency chain — sequential is correct
  • The team is two people working on the same file all day — coordinate live, no plan needed

Common Rationalizations

ThoughtReality
"We'll just merge at the end"Merge conflicts at the end compound. Each agent's mental model of the codebase has diverged. Resolving 5 PRs simultaneously is 5x more work than resolving them in sequence.
"Agents can share files, git will sort it out"Git produces unresolvable conflicts when two agents edit the same function with no shared context. The "resolution" is one engineer hand-merging both versions.
"We don't need integration tests between merges"Silent integration failures accumulate. By PR 5, nobody knows which of the previous 4 PRs introduced the bug.
"Sequential is safer than parallel"Sequential wastes parallelizable work. The cost of planning beats the cost of unparallelized execution.
"We'll figure out merge order as we go"First-merger-wins creates rebase chaos. Set the order at dispatch time.
"One worktree is fine, agents can take turns"Agents don't "take turns" — they overwrite each other's working tree state. Each agent needs isolation.

Red Flags

  • Two ready tasks in tasks.yaml that both modify the same file
  • Multiple agents about to start in the same git worktree
  • No integration test gate between parallel groups
  • A "merge day" scheduled at the end of the sprint to resolve everything at once
  • Agents dispatched without knowing what the others are touching
  • No documented merge order — every PR is "ready when ready"
  • A task list that lists modules but not files (file-conflict risk can't be assessed)

Core Process

Step 1: Read .forge/tasks.yaml and identify dependency-free groups

A task is dependency-free with another if both:

  1. Their depends_on lists do not transitively reference each other
  2. Their files lists do not intersect

Group dependency-free tasks. Sequence groups by dependency depth.

Group 1 (ready now):     T-001, T-003, T-007
Group 2 (after Group 1): T-002, T-004
Group 3 (after Group 2): T-005, T-006

Step 2: Assess file-conflict risk per group

For each group, build a matrix:

T-001T-003T-007
src/auth/session.ts✏️
src/api/users.ts✏️
src/components/Button.tsx✏️
src/types/index.ts✏️✏️

Any row with two ✏️ marks is a conflict. Resolve before dispatch:

  • Split the task — extract the shared file into its own prerequisite task
  • Sequence — move one task into a later group
  • Designate a primary — one task owns the file; the other rebases after

Step 3: Assign branching strategy

  • One branch per task: task/T-001-session-refresh
  • All branches base off main (or the integration branch, if used)
  • No long-lived feature branches for parallel work
  • Every branch has the task ID and a one-line description in its name

Step 4: Define PR sequencing and merge order

In .forge/parallel-plan.md:

Group 1 merge order:
  1. T-001 (touches shared types — must land first)
  2. T-007 (independent UI)
  3. T-003 (rebases on T-001's type changes)

Integration test gate runs between T-001 → T-007 and T-007 → T-003.

Merge order is fixed before dispatch. Agents know their PR's position in the queue.

Step 5: Specify agent isolation

Each agent works in its own worktree (or its own clone):

~/work/main           # main worktree, integration testing
~/work/T-001          # agent A's worktree
~/work/T-003          # agent B's worktree
~/work/T-007          # agent C's worktree

git worktree add -b task/T-001-session-refresh ~/work/T-001 main

No agent ever runs in another agent's worktree. No agent ever runs in the main worktree during parallel work.

Step 6: Set the integration-test cadence

Between every PR merge in a group:

  • Pull the latest main into the integration worktree
  • Run the full test suite (unit + integration + e2e on critical paths)
  • Run any contract-conformance tests for the modules that changed
  • If green: merge the next PR
  • If red: pause dispatch, root-cause, and either revert or push a fix before continuing

Between groups:

  • All PRs in the previous group merged and tested green
  • The next group's worktrees rebased on the new main

Step 7: Document the plan in .forge/parallel-plan.md

Sections:

  • Groups and dependency order
  • File-conflict matrix per group (resolved)
  • Branch naming and base
  • Merge order with rationale
  • Worktree assignments
  • Integration test cadence
  • Fallback for conflicts that emerge mid-run

Prepend a forge:meta header (generated_by: parallel-execution-strategy, generated_at: <ISO 8601 UTC with Z>, content_hash: <sha256 first 8 over THIS file's body, excluding the forge:meta block>).

Transitive depends_on: parallel-plan.md builds on tasks.yaml, which itself depends on prd.md, architecture.md, and contracts/*. List the full transitive upstream set in depends_on (paths only — never hashes) AND capture each upstream's content_hash AT generation time in generated_from:

depends_on: [.forge/prd.md, .forge/architecture.md, .forge/contracts/*, .forge/tasks.yaml]
generated_from:
  .forge/prd.md: <prd.md's content_hash at this moment>
  .forge/architecture.md: <architecture.md's content_hash at this moment>
  .forge/contracts/auth-service.md: <hash>   # one entry per resolved glob match
  .forge/contracts/payment-service.md: <hash>
  .forge/tasks.yaml: <tasks.yaml's content_hash at this moment>

Listing only [.forge/tasks.yaml] is wrong — if prd.md changes but tasks.yaml hasn't been re-run yet, parallel-plan.md would appear UP_TO_DATE despite the chain being stale. See forge-dependency-graph: co-output rule.

Verification

  • .forge/parallel-plan.md written
  • No two parallel agents touch the same file (matrix verified)
  • Every parallel task has its own branch with the task ID in the name
  • Every agent has its own worktree
  • Merge order is documented for every group
  • Integration test gate defined between every merge
  • Fallback plan exists for mid-run conflict discovery
  • Plan was reviewed before dispatch — no agent starts work until the plan is signed off