Cto review
Skill alirezarezvani/claude-skills/c-level-advisor/c-level-agents/skills/cto-review
345 Claude Code skills & agent skills & plugins (30+ Agents, 70+ custom commands, 330+ skills, customizable references, scripts)for Claude Code, Codex, Gemini CLI, Cursor, and 8 more coding agents — engineering, marketing, product, compliance, C-level advisory, research, business operations, commercial & finance, and your daily productivity skills.
npx -y skills add alirezarezvani/claude-skills --skill cto-reviewAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
/cs:cto-review <plan> — Architecture and scaling interrogation. Tech debt, scaling cliffs, team scaling, build-vs-buy. Use when committing to an architecture, planning for 10x load, or weighing a rebuild against a vendor.
SKILL.md
3.3 KB, as published. Nobody here has run it
/cs:cto-review — CTO Forcing Questions
Command: /cs:cto-review <plan>
Pressure-tests architecture and engineering scaling decisions. Six questions to surface the next scaling cliff before you hit it.
When to Run
- Before approving a major architecture change
- Before doubling the engineering team
- Before a build-vs-buy decision > $100K/year
- When a system is showing reliability stress (SLOs missed)
- Before committing to a new platform / language / DB
The Six CTO Questions
1. Scaling Cliff
Where does the current architecture break, in terms of users / requests / data volume?
- Be specific. "It breaks at 10× current load because the primary DB writes saturate."
- If you don't know, run a load test before deciding.
2. Tech Debt Inventory
What's the top tech debt item, what's it costing per week, and when does it become blocking?
python ../../../skills/cto-advisor/scripts/tech_debt_analyzer.py
3. Team Scaling
For each open req, what's the ramp time and contribution model?
python ../../../skills/cto-advisor/scripts/team_scaling_calculator.py
4. Build vs Buy
Why are we building this instead of buying it — and what's the 3-year TCO of each?
- If "we want control" or "it's not that hard" — push back.
- If the answer is "this is our core moat," build.
5. SLO / Reliability
What are the SLOs for this system and what's the current error budget burn?
- Without an SLO, you can't reason about reliability tradeoffs.
- See
engineering/slo-architectfor SLO design.
6. Security & Compliance Surface
What does this expose, and has cs-ciso-advisor signed off?
- Architecture decisions are compliance decisions.
- Loop in cs-ciso-advisor before commit.
Workflow
- Run the tech debt analyzer + team scaling calculator
- Define the scaling-cliff hypothesis explicitly
- Cross-check with cs-ciso-advisor for security implications
- Apply the verdict
Output Format
# CTO Review: <plan>
**Date:** YYYY-MM-DD
## Scaling Cliff
- Current capacity: <metric>
- Break point: <metric>
- Headroom: X months at current growth
## Tech Debt
- Top item: <description>
- Cost per week: $X or N eng-hours
- Blocking date estimate: <date>
## Team
- Open reqs: N
- Median ramp: X months
- Contribution model: <pairing / squad / area>
## Build vs Buy
- 3-year build TCO: $X
- 3-year buy TCO: $X
- Strategic fit: <core / context>
- Decision: BUILD | BUY
## Reliability
- SLO defined: yes / no
- Error budget burn: X% (target < Y%)
## Security
- cs-ciso sign-off: ✅ / ❌
## Verdict
🟢 SHIP | 🟡 SHARPEN | 🔴 BLOCK
## Next Steps
[3 concrete actions]
Routing
/cs:ciso-review— mandatory if data surface changes/cs:cfo-review— for build-vs-buy > $100K/cs:execute— quarterly plan/cs:boardroom— for architecture pivots
Related
- Agent:
cs-cto-advisor - Skill:
cto-advisor - SLO:
../../../../engineering/slo-architect/
Version: 1.0.0