Decompose by attention

Skill AlexTavor/engineering-discipline/skills/decompose-by-attention

Break a unit of work into pieces small enough to plan in about a minute and review in about a minute, so each piece fits a single pass of attention. Fires whenever you scope a task, turn a goal into a plan, or turn a plan into changes, and recursively whenever a scope feels too big to hold in one pass, spans more than about three distinct concerns, or mixes high-level design with low-level detail. Also when a user says 'break this down', 'this ticket is too big', 'split this work', or 'chunk the plan'. This sizes the work itself, not bundling finished changes into PRs (pr-sizing) or reviewing a grown module (cohesion-review).From its SKILL.md

Install
npx -y skills add AlexTavor/engineering-discipline --skill decompose-by-attention

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

4.6 KB, as published. Nobody here has run it

decompose-by-attention

When to apply

Any time you are scoping work — turning a goal into a plan, a plan into changes, or checking a single change before drafting it. The skill is recursive: apply it at every level until each unit is atomic.

The attention-size principle

A work unit is correctly sized when both hold:

  • Planning takes ~1 minute of operator attention. Long enough to encode intent; short enough to hold the whole scope in working memory.
  • Completion review takes ~1 minute. Long enough to verify the artifact matches intent; short enough that no part of the review goes perfunctory.

"1 minute" is approximate — it anchors the discipline. What matters is that the scope fits a single attention episode, not that a stopwatch ratifies it. If you lose context mid-plan or mid-review, the scope is too big.

Why attention rather than lines of code, complexity, or hours: implementation capacity is cheap and expert attention is the bottleneck. Attention is the actual currency of review.

Too-big heuristics

A scope is too big if any one is true:

  1. Distinct-concern count > 3. Touching more than three distinct concerns (e.g. "schema for X, validator for X, migration for X, doc for X" = four) is a candidate to carve. The rule isn't "always carve at 4"; it's "at 4+, check whether they're truly cohesive or coincidentally bundled."
  2. Judgment-call density > 2 per minute of planning. More than two non-trivial design decisions per planning minute is denser than the attention budget allows. Each decision deserves its own sub-unit where it's the centerpiece.
  3. Concern span across abstraction levels. Mixing high-level architecture with low-level detail (design the schema AND choose the library AND write the migration) needs separation — one level per attention episode.

Atomic-enough heuristics

A scope is correctly atomic when both hold:

  1. Artificial-seam test. Carving further forces inventing seams that don't match natural concern boundaries (e.g. splitting "fields" from "invariants" when they're inseparable). Carving would create ceremony, not value.
  2. Natural cohesion. One centerpiece — one schema, one skill, one script, one decision — even if it ships supporting artifacts (tests, examples, fixtures). Multiple centerpieces is a bundling smell.

When both hold, stop carving.

Recursive carve protocol

  1. Top level (goal → plan): too big → sub-units; atomic-enough → one unit.
  2. Mid level (plan → changes): multiple distinct logic units → multiple changes; already atomic → one.
  3. Unit level: a stopping check before drafting. A unit that fails the atomic-enough heuristics needs further carving first.

Terminates when every unit passes both atomic-enough heuristics. No fixed depth limit; deep nesting is allowed if the work has nested cohesion.

Anti-pattern catalogue

  1. Count-targeting (Goodhart). "The last plan had 7 units, so this one should too." The number is a by-product of the carve, not its goal; targeting it distorts the carve.
  2. Decomposing for ceremony. Splitting trivially-small work (rename foo→bar / update bar's usages / update bar's tests) into separate units because the workflow expects several. Ceremony for no attention payoff.
  3. Bundling unrelated work. Packing multiple unrelated concerns (schema validator AND CI pipeline AND deploy docs) into one unit to cut count. More concerns than one attention episode holds — exactly what carving prevents.
  4. Carving on lines-of-code. "This file is big; split it." Lines are an output proxy; attention is the currency. A large file with one cohesive concern is fine; a small file spanning three concerns is not.
  5. Carving on file boundaries. Treating "one file per unit" as the rule. If a single concern legitimately spans two files (a schema and its companion example), keep them together.

Related

  • pr-sizing — the same principle at PR scope.