agentsclimarketplace

Deployment procedures

Skill alex-voloshin-dev/ai-skills/.agents/skills/deployment-procedures

Production deployment procedures with rollback plans, health checks, and verification steps. Use when deploying to production, planning rollback strategies, or verifying production health after deployment.From its SKILL.md

Install
npx -y skills add alex-voloshin-dev/ai-skills --skill deployment-procedures

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 2 stars2 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

2.9 KB, as published. Nobody here has run it

Deploy to Production

Production deployment skill providing rollback procedures, health check patterns, and verification checklists. Ensures safe, repeatable production deployments.

When to Use

  • Deploying application updates to production
  • Planning rollback strategies before deployment
  • Verifying production health after deployment
  • Investigating post-deployment issues

When NOT to Use

  • Deploying to staging (use deploy-staging skill workflow)
  • Making infrastructure changes (use infra-change skill workflow)
  • Planning release version and changelog (use release skill workflow)

Deployment Strategies

StrategyWhen to UseRiskDowntime
Rolling updateStandard deploys, stateless servicesLowZero
Blue-GreenCritical services, instant rollback neededLowZero
CanaryHigh-risk changes, gradual validationMediumZero
RecreateStateful services, breaking schema changesHighBrief

Rolling Update (Default)

  • Gradually replace old pods with new ones
  • Health checks gate the rollout — unhealthy pods stop the rollout
  • Configure maxSurge and maxUnavailable for rollout speed
  • Monitor error rates during rollout window

Canary Deployment

  1. Deploy new version to small subset (5–10% traffic)
  2. Monitor error rate, latency, and business metrics for 5–10 minutes
  3. If healthy → gradually increase traffic (25% → 50% → 100%)
  4. If degraded → route all traffic back to stable version

Blue-Green Deployment

  1. Deploy new version alongside current (green alongside blue)
  2. Run full smoke tests against green
  3. Switch traffic from blue to green
  4. Keep blue running for instant rollback (15–30 minutes)
  5. Decommission blue after confidence period

Pre-Deployment Checklist

  • All tests pass on release branch
  • Staging deployment verified
  • Database migrations tested (forward and rollback)
  • Feature flags configured
  • Monitoring dashboards ready
  • On-call team notified
  • Rollback plan documented and tested
  • Release notes prepared

Post-Deployment Verification

  • Health endpoint returns 200
  • Error rate ≤ pre-deploy baseline
  • Latency P95 within SLO target
  • No new error patterns in logs
  • Key user journeys functional
  • Database connections stable
  • External integrations responding
  • Alerts not firing

Integration

  • Follows rules: devops-engineer role (infrastructure), sre-engineer role (SLOs, monitoring)
  • Used by workflows: deploy-production skill, deploy-staging skill
  • Companion resources: rollback-procedure.md

Keep looking

Skills are one crate of 627,801. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.