agentsclimarketplace

Backend deployment

Skill ahtishamshahzad/agent_dev_flow/.ai/skills/backend/backend-deployment

Use to plan backend deployment — target selection, environment config/secrets, build artifact (container) discipline, migration-on-deploy ordering, zero-downtime rollout with health checks, worker/scheduler deployment, and rollback. Deploys require approval.From its SKILL.md

Install
npx -y skills add ahtishamshahzad/agent_dev_flow --skill backend-deployment

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

2 things to look at

  • 26 days oldThe repository was created 26 days ago. New is not bad, but a brand new repository carrying a familiar-sounding name is the shape a typosquat arrives in, and there has been no time for anyone else to find a problem with it.
  • 0 stars0 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

5.8 KB, ~1.1k tokens by cl100k_base, as published. Nobody here has run it

Backend Deployment

Purpose

Get the backend into environments safely and repeatably: chosen target, disciplined artifacts, migration ordering, health-checked rollout, and a rollback that's been thought through before it's needed. Actual deploys/publishes are outward-facing — explicit approval (../../release-planning, Gate 7).

When to Use

  • When planning how/where the backend runs (staging/production) or changing the deploy pipeline.
  • Not for release go/no-go itself (../../release-planning) or store/app publishing.

Inputs

  • Deployment target constraints/preferences (PaaS, containers on cloud, VMs) — a stack decision needing approval.
  • Env/secret model (../../environment-audit), DB migration flow (../../database/database-migrations), async surfaces (queues, scheduled-jobs).

Discovery Questions

  • What target fits the team's ops capacity (managed PaaS vs orchestrated containers vs VMs)?
  • How many environments, and what differs between them (config only, ideally)?
  • What's the rollout policy — can the product tolerate seconds of downtime, or is zero-downtime required?
  • Do workers/schedulers deploy with the API or separately (queues says separately)?

Responsibilities

  • Recommend the target on requirements + ops capacity, with trade-offs, for approval.
  • Artifact discipline: one immutable build (container image or equivalent) promoted across environments — never rebuilt per environment; config/secrets injected at runtime (backend-security), validated at boot (fail fast, before traffic).
  • Migration ordering: migrations run as a deploy step before new code serves traffic; expand→migrate→contract for zero-downtime schema change (../../database/database-migrations owns the pattern) — old code must survive the new schema during rollout.
  • Rollout: readiness-gated (only healthy instances get traffic — backend-observability checks), rolling/blue-green per target capability; graceful shutdown (drain requests, finish/release jobs — queues).
  • Async surfaces: workers and schedulers as separately deployable processes; deploy order vs migrations considered for them too.
  • Rollback: previous artifact redeployable in minutes; know which migrations are roll-forward-only and what that means for reverting (usually: fix forward for schema, roll back code).
  • Pipeline: CI gates (tests, ../../security-review hooks) before deploy; deploy actions logged; production deploys approved per ../../../system/QUALITY_GATES.md.

Required Workflow

  1. Recommend target + environment topology; get approval.
  2. Define artifact build + promotion flow.
  3. Define config/secret injection + boot validation.
  4. Sequence migrations vs code rollout (API, workers, schedulers).
  5. Define health-gated rollout + graceful shutdown + rollback runbook.
  6. Wire CI gates; record the deploy/rollback procedure.

Decision Rules

  • Prefer the most managed target that meets requirements — ops burden is a permanent tax.
  • Same artifact in staging and production; environment differences live in config only.
  • A migration that old code can't run against blocks zero-downtime rollout — split it (expand/contract) or accept and record downtime.
  • Rollback plans that were never rehearsed are hopes; rehearse in staging.

Rules

  • No deploy/publish without explicit approval; staging first.
  • Secrets never bake into artifacts or logs.
  • Every production deploy has: approver, artifact ID, migration list, rollback step — recorded.

Anti-Patterns

  • Building on the production box / rebuilding per environment.
  • Running migrations manually "when someone remembers."
  • Deploying new code before its migration (or a contracting migration before old code is gone).
  • Killing workers mid-job on deploy (no drain).
  • Rollback = "restore yesterday's DB backup" as the primary plan.

Validation Checklist

  • Target recommended with trade-offs; approved.
  • Immutable artifact promoted across environments.
  • Config validated at boot; secrets runtime-injected.
  • Migration ↔ rollout ordering safe (expand/contract where needed).
  • Health-gated rollout + graceful shutdown incl. workers/schedulers.
  • Rollback runbook exists and was rehearsed.
  • CI gates + approval flow wired.

Definition of Done

A recorded, approved deployment design — target, artifact flow, config/secret handling, safe migration ordering, health-gated rollout for API and async processes, rehearsed rollback — with production deploys gated on explicit approval.

Related Skills

../../release-planning, ../../environment-audit, ../../database/database-migrations, ../../database/backup-recovery, backend-observability, queues, scheduled-jobs, backend-security, ../../github-repository (CI/CD residence).

Related Knowledge

../../../knowledge/ (ops capacity, environment topology, downtime tolerance).

Related References

../../../references/backend/deployment/ (runbooks, when populated).

Context Loading Guidance

  • Requires: target constraints, env/secret model, migration flow, async inventory.
  • Does not require: application feature code, endpoint detail.
  • May load: ../../database/database-migrations (ordering), ../../release-planning (gate).
  • Stop when: the deploy design + rollback runbook are recorded and approvals wired.

Token Efficiency Guidance

The deploy sequence diagram (build → migrate → roll API → roll workers) plus the rollback runbook are the artifacts; skip cloud-vendor feature tours.

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 326,736. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.