State manager
Skill AhmedHabiba/architor/templates/claude/skills/state-manager
Structured, phase-gated architecture design powered by Claude Code. Enforces decision gates, challenges assumptions, and produces documented architecture decisions.
npx -y skills add AhmedHabiba/architor --skill state-managerAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
One thing to look at
- 6 stars6 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.
What its author says it does
Copied from the file, not written here
Manages architecture project state in .arch/state.json and .arch/decisions.md. Activates when reading or updating project phase state, tracking component acceptance, logging decisions, or validating phase transitions.
SKILL.md
5.0 KB, as published. Nobody here has run it
State Manager
State File: .arch/state.json
This file is the single source of truth for project progress. ALWAYS read it before responding to architecture queries. ALWAYS update it after state changes.
Reading State
- Parse the JSON file
- Check
current_phaseto know where we are - Check phase-specific status fields for detail
- For Phase 2, check
sub_phaseand individual acceptance flags (pattern_accepted, components_overview_accepted, cross_cutting_accepted) - For Phase 3, check
componentsobject for per-component status - Check
reopens.countandreopens.maxfor reopen availability
Valid Phase Transitions
not_started → evaluation (when /analyze-prd runs)
evaluation → methodology (when Phase 1 is accepted)
methodology → components (when Phase 2 is fully accepted: pattern + components + cross-cutting)
components → finalization (when ALL components accepted)
Backward transitions are ONLY allowed via /reopen (max 2 per project).
Phase 2 Sub-Phases
pattern → components_overview → cross_cutting
Each sub-phase is accepted independently via /accept. All three must be accepted for Phase 2 to be complete.
Component Status Values
pending → in_progress (when /design-component starts)
in_progress → awaiting_acceptance (when design is presented)
awaiting_acceptance → accepted (when user accepts)
awaiting_acceptance → in_progress (when user refines)
needs-review → in_progress (after a reopen cascades)
Updating State
When updating state.json:
- Read current state
- Validate the transition is legal
- Write the updated state
- Increment
decision_countif a decision was made
Decision Log: .arch/decisions.md
Append-only file. Never edit previous entries. Format:
### [DEC-NNN] Phase X | Category
- **Decision:** [What was decided]
- **Rationale:** [Why this choice]
- **Alternatives:** [What else was considered]
- **Trade-offs:** [What was sacrificed]
- **Risk:** [Any residual risk]
- **Supersedes:** [DEC-NNN — only if this replaces a previous decision]
- **References:** [FR-NNN, DEC-NNN — only if tracing to requirements or cross-cutting decisions]
- **Date:** [ISO timestamp]
Categories: Requirements | Pattern | Technology | Integration | Security | Infrastructure | Process | Reopen
Supersedes and References are optional. Omit the line entirely when not applicable.
Supersession and Traceability Fields
Supersedes — Use when a decision replaces a previous one:
/reopencreates a new decision that supersedes the original acceptance decision for the reopened target/alternativecreates a new decision that supersedes the previous proposal's decision- Format:
**Supersedes:** DEC-003(single) or**Supersedes:** DEC-003, DEC-007(multiple) - NEVER edit the superseded entry — the new entry points backward (like RFC "Obsoletes:" fields)
References — Use when a decision traces to requirements or earlier decisions:
- Phase 3 component technology decisions should reference the FR-NNN requirements they satisfy
- Phase 3 component decisions should reference applicable DEC-NNN cross-cutting decisions from Phase 2C
- Phase 2 acceptance decisions should reference the FR-NNN requirements that drove the pattern choice
- Refinement decisions should reference the DEC-NNN of the original proposal being refined
- Format:
**References:** FR-001, FR-003, DEC-005
Example — supersession (reopen scenario):
### [DEC-012] Phase 2A | Reopen
- **Decision:** Reopened architecture pattern selection
- **Rationale:** New compliance requirement invalidates serverless approach
- **Alternatives:** Could have added compliance layer on top of existing pattern
- **Trade-offs:** Progress reset on 5 items
- **Risk:** Reopens remaining: 1 of 2
- **Supersedes:** DEC-004
- **Date:** 2026-03-11T14:00:00Z
Example — traceability (component design):
### [DEC-015] Phase 3 | Technology
- **Decision:** Selected PostgreSQL 16 for order-service data store
- **Rationale:** ACID compliance required for financial transactions; team has production experience
- **Alternatives:** MongoDB 7 (flexible schema but lacks native ACID), CockroachDB 24 (distributed but overkill)
- **Trade-offs:** Schema migrations required; less flexibility than document store
- **Risk:** Single-node bottleneck if order volume exceeds 50K TPS
- **References:** FR-003, FR-012, DEC-008, DEC-009
- **Date:** 2026-03-11T15:30:00Z
Automatic Logging Events
Log a decision entry for:
- Phase acceptance
- Phase transition
- Sub-phase acceptance (2A, 2B, 2C)
- Technology selection (per component)
- Refinement requests (what changed and why)
- Alternative requests (what was replaced)
- Review findings (significant concerns raised)
- Reopen operations (with cascade details)