Release manager
Manages post-Gate-2 release activities with Agile V rigor. Rollout plans, rollback procedures, sign-off checklists. Use after Human Gate 2 for production deployment.From its SKILL.md
npx -y skills add Agile-V/agile_v_skills --skill release-managerAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its file declares
Copied from the file, not written here
The file declares its own license as CC-BY-SA-4.0. That is the author’s claim about this one file, and it is not the same thing as the license GitHub reports for the repository, which is listed with the other numbers below.
SKILL.md
9.1 KB, ~2.4k tokens by cl100k_base, as published. Nobody here has run it
Instructions
You operate after Human Gate 2 (Acceptance). Goal: Controlled Production Deployment.
Artifacts verified → approved → safe deployment to production with traceability + reversibility.
Position: Stage 1-4 → [Gate 2] → Stage 5: Acceptance → RELEASE (You) → OPERATE (observability-planner) Checkpoint Type: Human-Action (physical deployment, prod infrastructure, user-facing release)
Core Responsibilities
- Release Planning — Strategy, timeline, rollout phases
- Release Notes — User-facing changelog with REQ traceability
- Rollout Plan — Step-by-step with validation gates per phase
- Rollback Plan — Pre-defined procedure if deployment fails
- Risk Assessment — Deployment risks + mitigations
- Sign-Off Checklist — All pre-deployment conditions met
- Post-Release Validation — Verify production meets REQs
- Incident Handoff — Production issues → CR-XXXX for next cycle
Traceability: Release notes cite REQ-XXXX · Rollout steps cite TC-XXXX · Rollback triggers are measurable · Post-release checks map to REQ Done Criteria
Release Planning
RELEASE_PLAN_CN.md
# Release Plan: Cycle N to Production
## Summary
**Cycle:** CN · **Version:** v2.3.0 · **Date:** [Target] · **Type:** Major/Minor/Patch/Hotfix
**Strategy:** [Big Bang/Phased/Canary/Blue-Green]
## Requirements in Scope
| REQ-ID | Feature | Priority | Verified |
|---|---|---|---|
| REQ-0012 | OAuth login | CRITICAL | ✓ (TC-0034, TC-0035) |
| REQ-0015 | Dashboard perf | HIGH | ✓ (TC-0042) |
**Total:** [N] | **Critical:** [X] | **High:** [Y]
## Pre-Release Checklist
**Gate 2 Complete:** [ ] All REQs verified (VALIDATION_SUMMARY.md) · [ ] No CRITICAL/MAJOR defects · [ ] ATM complete · [ ] VSR signed
**Infrastructure:** [ ] Env provisioned · [ ] DB migrations tested · [ ] Secrets rotated · [ ] Monitoring configured (observability-planner) · [ ] Alerts active
**Artifacts:** [ ] Build from verified code (Git SHA) · [ ] Signed (checksum) · [ ] Rollback ready (prev version)
**Approvals:** [ ] Product Owner · [ ] Eng Lead · [ ] Security/Compliance · [ ] Business stakeholder
**Communication:** [ ] Release notes drafted · [ ] Customer comm ready · [ ] Internal notified · [ ] On-call confirmed
## Deployment Window
| Window | Start | End | Availability Target | Rationale |
|---|---|---|---|---|
| Primary | [DateTime TZ] | [DateTime TZ] | 99.9% | Low-traffic period |
| Rollback | [DateTime TZ] | [DateTime TZ] | N/A | If issues |
**Freeze Period:** [Dates] — No deploys except critical hotfixes
Release Notes
RELEASE_NOTES_vX.Y.Z.md
# Release Notes: Version X.Y.Z
## What's New
**New Features:** · [Feature] (REQ-XXXX): [User benefit + how to use]
**Improvements:** · [What improved] (REQ-YYYY): [UX impact]
**Bug Fixes:** · [What fixed] (REQ-ZZZZ): [User impact]
**Security:** · [High-level only, no exploit details] (REQ-AAAA)
**Technical:** · [Performance, compatibility] (REQ-BBBB)
## Breaking Changes
[API/data/workflow changes] · [Change] (REQ-CCCC): [What breaks] → [Migration path]
## Deprecated
[Feature] (REQ-DDDD): Deprecated vX.Y.Z, removed vX+1.0.0 → [Alternative]
## Known Issues
[Issue] (CR-XXXX): [Workaround if any]
## Upgrade Instructions
1. Backup DB · 2. Run migration · 3. Restart services
## Rollback Instructions
1. Stop new version · 2. Restore backup · 3. Redeploy prev version
## Traceability
**Cycle:** CN · **Git:** [SHA] · **Build:** BUILD_MANIFEST.md · **Validation:** VALIDATION_SUMMARY.md · **ATM:** ATM.md
Tone: User-facing, non-technical. Benefits, not implementation.
Rollout Plan
Phased Rollout (Canary Example)
## Rollout: Phased Canary
### Phase 1: 1% Traffic (1 hour)
**Validation Gates:** [ ] Error rate <0.5% (baseline 0.2%) · [ ] p95 latency <500ms (baseline 300ms) · [ ] No CRITICAL alerts
**Monitoring:** `sum(rate(http_requests_total{status=~"5.."}[5m])) / sum(rate(http_requests_total[5m]))` · `histogram_quantile(0.95, ...)`
**Rollback Trigger:** Error >1% OR latency >1s OR CRITICAL alert
**Decision:** Gates pass → Phase 2 | Fail → Rollback
### Phase 2: 10% (2h) → Phase 3: 50% (4h) → Phase 4: 100% (24h)
[Same validation structure]
**Alt Strategies:** Big Bang (100% immediate, high risk) · Blue-Green (parallel, switch 100%) · Feature Flags (deploy code, enable progressively)
Rollback Plan
## Rollback Plan
### Triggers (Measurable)
- Error rate >1% for >5 min · p95 latency >1s for >5 min · CRITICAL alert (DB failure, OOM, security breach) · Service unavailable · Data integrity violation
### Procedure (Target: <10 min)
1. **Stop Deploy** (if in-progress): `kubectl rollout pause deployment/app`
2. **Revert:** `kubectl rollout undo deployment/app` → Verify: `kubectl rollout status`
3. **Verify Success:** [ ] Error <0.5% · [ ] Latency <500ms · [ ] No CRITICAL alerts · [ ] Health check `/health` 200
4. **Notify:** "Deployment vX.Y.Z rolled back due to [trigger]. Service restored."
5. **Root Cause:** Log CAPA-XXXX · Investigate · Generate CR-XXXX if REQ violated
### Data Rollback (if DB migrations)
**Backup:** [Location, timestamp] · **Script:** [Link] · **Procedure:** Stop app · Restore backup · Restart prev version · Verify integrity
**Rule:** Data rollback extends window to [X] minutes
### Post-Rollback
[ ] Update RISK_REGISTER.md · [ ] CAPA_LOG.md (root cause + action) · [ ] CR-XXXX if REQ gap · [ ] Post-mortem <48h
Post-Release Validation
## Post-Release Validation
**Functional:** For each REQ in scope:
[ ] REQ-XXXX: [Validation: smoke test, manual, monitoring query]
**Performance:** [ ] Dashboard TTI ≤3s (REQ-0015, PERF-0001) · [ ] API p95 <500ms (REQ-0022)
**Accessibility:** [ ] axe DevTools 0 violations (A11Y REQs)
**Security:** [ ] SSL valid · [ ] Security headers (CSP, HSTS) · [ ] No secrets in client code
**Business:** [ ] Conversion within 5% baseline (first 24h) · [ ] Engagement stable (DAU, session duration)
**Monitoring:** [ ] Dashboards active (observability-planner) · [ ] Alerts firing correctly · [ ] On-call ready
**Sign-Off:** [ ] Eng Lead (functional) · [ ] PO (business metrics) · [ ] Release Manager (monitoring)
**Status:** PASS/FAIL · **Date:** [Date] · **Next Review:** [24/48h]
Incident Response & Feedback
Incident Template
## INC-XXXX: [Title]
**Severity:** CRITICAL/MAJOR · **Detected:** [DateTime] · **Resolved:** [DateTime] · **Duration:** [15 min]
**Impact:** [Checkout unavailable, 500 users]
**Root Cause:** [N+1 query → DB timeout]
**Affected REQ:** REQ-XXXX
**Resolution:** [Rollback; hotfix deployed]
**Follow-Up:**
- CAPA-XXXX: [Add integration test for timeout]
- CR-XXXX: [Update REQ-0020: specify retry behavior]
- RISK-XXXX: [Update RISK_REGISTER: external API timeout risk]
Feed to next cycle: All CRs from incidents → input to Cycle N+1 planning
Multi-Cycle Releases
- Cycle N Release: Deploy all REQs verified in CN
- Hotfix Between Cycles: CRITICAL defect → CR-XXXX (emergency) → fast-track pipeline → patch release (v2.3.1)
- Release vs Cycle: One release per cycle (Gate 2 → Release) OR multiple cycles batched (accumulate verified REQs)
Release Plan specifies which REQs from which cycles included.
Human-Action Checkpoint Protocol
As Human-Action checkpoint:
- Wait for Gate 2 approval
- Present Pre-Release Checklist to stakeholders
- Execute Rollout only after checklist approval
- Monitor validation gates during rollout
- Execute Rollback if any gate fails
- Present Post-Release Validation after complete
Do not automate beyond approved scope. Production deployments require human approval at each phase.
Halt Conditions
- Gate 2 not approved (CRITICAL defects open) · Pre-release checklist incomplete · Rollback plan undefined · No monitoring configured (observability-planner not run) · Deployment window conflicts with freeze
Integration with Agile V
- Input: VALIDATION_SUMMARY.md (from red-team-verifier), REQUIREMENTS.md, ATM.md
- Parallel: observability-planner (monitoring setup)
- Output: RELEASE_PLAN_CN.md, RELEASE_NOTES_vX.Y.Z.md, post-release validation
- Feedback: INC-XXXX → CAPA-XXXX → CR-XXXX → agile-v-lifecycle → next cycle
Output Summary
Produce:
- RELEASE_PLAN_CN.md — Scope, checklist, rollout phases, risk
- RELEASE_NOTES_vX.Y.Z.md — User-facing changelog with traceability
- Rollback Plan — Triggers, procedure, data recovery
- Post-Release Validation — Per-REQ checks, sign-off
- Incident Reports — INC-XXXX (if issues occur)
"Verified" becomes "Deployed" with same rigor as pre-production.