Spec to plan

Skill agent-ix/quoin/skills/spec-to-plan

Convert ISO spec requirements (StR, FR, NFR) into a TDD-based project plan with dependency analysis, parallel execution tracks, quality gates, and task decomposition. Selects or starts a plan and writes a frontmatter-typed plan bundle under plan/<Plan-id>-<slug>/ (Plan + Task + index + log).From its SKILL.md

Install
npx -y skills add agent-ix/quoin --skill spec-to-plan

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 20 stars20 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

SKILL.md

5.2 KB, as published. Nobody here has run it

Spec to Plan

This skill provides a structured workflow for converting ISO/IEC/IEEE 29148 compliant specifications into an executable, dependency-aware project plan with parallel execution tracks and quality gates.

A project may hold multiple plans — each a named group of tasks (e.g. "core app", "packaging", "a11y hardening"). Every plan is a self-describing bundle under plan/<Plan-id>-<slug>/ containing an index.md, a log.md, the plan.md itself, and a tasks/ directory. Plans, tasks, and the index/log files are frontmatter-typed (Plan, Task, index, log) so the dependency graph and all task metadata are machine-parseable and quire-validatable.

Purpose

Use this skill when:

  • You are starting a new implementation effort based on an existing Spec.
  • You want to add a new plan to a project that already has one or more.
  • You need to generate a Test Plan before writing code (TDD).
  • You want to ensure full traceability from Requirements (StR/FR/NFR) to Tests.
  • You need to identify what can be parallelized vs what must be serial.
  • You want quality gates to catch fundamental problems before downstream work is wasted.

Pre-conditions (Readiness Gate)

Task generation MAY begin only when ALL of the following are true:

  • All requirements are atomic and testable.
  • Ownership is assigned (see spec-scope-boundary-analysis).
  • Dependencies are known (see spec-dependency-analysis).
  • Risks are classified (see spec-risk-complexity-analysis).
  • Verification strategy is defined (see spec-evidence-analysis).
  • Failure-domain analysis is complete (see spec-failure-domain-analysis).

Failure to meet these conditions WILL result in unstable tasking. If any condition is unmet, stop and complete the corresponding analysis skill first.

Steps

All steps required!

  1. Plan Selection: Select an existing plan to continue, or start a new one. Skip only if the target plan is already fixed in this session's context. Scaffolds the bundle (index.md, log.md, tasks/).
  2. Analysis: Analyze the spec structure and map dependencies into the bundle's plan.md.
  3. Test Plan: Generate the list of required tests.
  4. Execution Plan: Derive dependency graph, critical path, parallel tracks, quality gates, and task decomposition into frontmatter-typed Task files.

Output

This skill produces or updates a plan bundle at <project_root>/plan/<Plan-id>-<slug>/:

  • plan.md (type: Plan): The central living document — requirements summary, dependency graph, execution tracks, quality gates, and test plan. It is an orchestration overview, not a mirror of the bundle: ownership, the DAG, and test traces are authoritative in the task frontmatter, so plan.md states each fact once (see references/step-3-execution-plan.md). Frontmatter relationships: trace (references) the requirements the plan covers.
  • tasks/Task-NNN-<slug>.md (type: Task): One file per task. Frontmatter carries the machine contract — status, track, priority, and relationships: edges (depends_on for the DAG, references for requirement ownership, verifies for test traces). The body holds the human sections (Scope/Subtasks/Deliverables/Notes).
  • index.md (type: index): ## Contents link list to plan.md and every task — the bundle's table of contents.
  • log.md (type: log): ## History of dated plan lifecycle events (plan created, tasks added, status changes).

Validate the bundle with: quire validate --scope <project_root> "plan/**/*.md"

--scope is the repository root, and must be passed explicitly. Since quire-cli v0.16.0 (quire-rs CR-045) the command derives two roots from it and never interchanges them: spec documents are read from <repo>/spec only, trace tags from the source tree at <repo> excluding spec/. A repo with no spec/ exits with a diagnostic naming the missing document root rather than scanning the whole tree, and a matrix outside spec/ (a fixture, a plan/ copy) mints nothing. A relative glob resolves under --scope only in scoped mode (no --module); with --module it resolves against the process working directory, and an omitted --scope defaults to . — so a run launched from a parent directory validates the wrong tree and exits 0 for whatever it matched. Check quire --version ≥ 0.16.0 before relying on any of this; ≤ 0.15.0 has the pre-split traversal semantics.

Open in the review cockpit

After the bundle validates, run filament open <plan-bundle>/plan.md to open the plan in the running filament-ide cockpit (it fires the filament-ide:// deep link and prints a clickable link as a fallback). Skip silently if the filament command is not installed.