Audit sprint jira

Skill abrahamFerga/scrum-skills/skills/audit-sprint-jira

A vendor-agnostic library of AI agent skills built around the Scrum framework. Works with Claude Code, Cursor, GitHub Copilot, and any agentskills.io-compatible agent.

Install
npx -y skills add abrahamFerga/scrum-skills --skill audit-sprint-jira

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

One thing to look at

  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Audits a completed or in-progress Jira sprint against Scrum and Jira best practices — checks Sprint Goal presence, issue hygiene, workflow transitions, field completeness, story point coverage, and sub-task consistency. Surfaces findings with severity levels and offers to add comments to specific issues or export a summary report. Use when anyone says things like "audit our sprint in Jira", "review the Jira sprint", "check our Jira sprint health", "are our issues following best practices", or "sprint health check in Jira". Don't use for Azure DevOps — use audit-sprint-ado instead. Don't use for Sprint Planning, Daily Scrum, or Retrospective. Requires a Jira MCP connection.

The file declares its own license as MIT. That is the author’s claim about this one file, and it is not the same thing as the license GitHub reports for the repository, which is listed with the other numbers below.

SKILL.md

7.6 KB, as published. Nobody here has run it

Jira Sprint Audit

Purpose

Jira's flexibility is powerful and, unchecked, leads to boards where issues sit in the wrong state, story points are missing, epics are unlinked, and the Sprint Goal exists only in someone's memory. This audit checks both Scrum health and Jira hygiene so the team can trust their data and improve how they work.


Prerequisites

This skill requires an active Jira MCP connection. If mcp__jira__* tools are not available, let the user know and stop.


Step 1 — Identify the sprint

Ask: "Which sprint should I audit — the current active one, the most recently closed one, or a specific sprint by name?"

Use the available Jira sprint listing tool to confirm the sprint ID and name. Store as $SPRINT.


Step 2 — Fetch sprint data

Retrieve all issues in $SPRINT:

  • All issues assigned to the sprint, including their type, status, story points, assignee, epic link, sub-tasks, and description/AC fields
  • Sprint details including the Sprint Goal (if set)

Group issues by type: Story, Task, Bug, Sub-task, Epic, other.


Step 3 — Run the audit

Grade each check as:

  • Pass — meets the standard
  • ⚠️ Warning — worth improving
  • Fail — missing or broken; impacts team effectiveness

Area 1 — Sprint Goal (Scrum)

CheckPass condition
Sprint Goal definedSprint has a non-empty goal field
Sprint Goal is outcome-orientedGoal is a value statement, not a task list or feature dump
Committed issues relate to the Sprint GoalNo large clusters of work that don't connect to the goal

A missing Sprint Goal means the team cannot assess whether the Sprint succeeded — it reduces the Sprint to a time-boxed to-do list.

Area 2 — Issue Hygiene (Jira)

CheckPass condition
All issues have an assigneeNo unassigned In Progress or Done issues
Stories are linked to an EpicUnlinked stories are harder to track against the Product Goal
Bugs are linked to the story they affectUnlinked bugs obscure cause and context
Issue titles are descriptiveNo "Story 1", "Bug", or untitled issues
No duplicate issuesCheck for titles that are near-identical
Issue types used correctlyNo Stories filed as Tasks or Bugs filed as Stories

Area 3 — Story Points and Sizing (Jira + Scrum)

Story points enable velocity tracking and honest sprint commitment. Missing or wildly inconsistent values degrade planning accuracy over time.

CheckPass condition
All Stories have story pointsNo unpointed Stories in the sprint
All Bugs have story pointsBugs consume capacity — they should be sized
Points are within a reasonable rangeFlag outliers significantly above the team's typical velocity per issue (may indicate unrefined work)
Sprint total points are within historical capacityFlag sprints where total commitment significantly exceeded typical velocity

Area 4 — Acceptance Criteria and Definition of Done (Scrum + Jira)

CheckPass condition
All Stories have acceptance criteriaAC field or clearly marked section in the description is not empty
Done issues have ACs that are verifiableACs are conditions, not vague summaries
All sub-tasks closed when parent is DoneOpen sub-tasks on a Done issue creates inconsistent data
Resolution is set on closed issuesIssues marked Done should have an explicit resolution (e.g. "Done", "Fixed")
DoD applied consistentlyDone issues should visibly meet the team's agreed Definition of Done

Area 5 — Workflow Transitions (Jira)

Jira workflow history reveals how work actually flowed. Unusual transitions are worth understanding — they may reflect real complexity or they may reflect a habit that obscures progress.

CheckPass condition
No issues moved directly from Backlog / To Do → DoneDirect jumps should have a comment explaining why
No issues stuck In Progress for the entire sprint without updatesFlag issues with no status change and no comments for > 3 days
Closed sprints have no issues left in an active stateAll in-progress work should have been moved or resolved at sprint close
Sub-tasks reflect parent issue statusSub-tasks still In Progress when parent is Done are a data inconsistency

Area 6 — Sprint Closure Hygiene (Jira)

CheckPass condition
Sprint was formally closed in JiraNot abandoned or left active past end date
Incomplete issues were explicitly moved, not left in the closed sprintIssues left behind at sprint close are invisible in future planning
Velocity is calculableCompleted story points can be totalled for the sprint

Step 4 — Present the audit report

Jira Sprint Audit — [SPRINT NAME]
Audited: [DATE]

Sprint Goal
  ✅ / ⚠️ / ❌  [Check]: [finding]

Issue Hygiene
  ✅ / ⚠️ / ❌  [Check]: [finding]
  (list specific issue keys where relevant)

Story Points & Sizing
  ✅ / ⚠️ / ❌  [Check]: [finding]

Acceptance Criteria & DoD
  ✅ / ⚠️ / ❌  [Check]: [finding]

Workflow Transitions
  ✅ / ⚠️ / ❌  [Check]: [finding]

Sprint Closure
  ✅ / ⚠️ / ❌  [Check]: [finding]

Summary
  [N] passed · [N] warnings · [N] failed

Top recommendations
1. [Most impactful fix — name specific issue keys where possible]
2. ...

Step 5 — Offer follow-up actions

Ask the user which, if any, follow-up actions to take:

  1. Add comments to specific issues — for issues with AC, sizing, or DoD findings, offer to post a comment using the Jira comment tool, addressed to the assignee or PM/PO
  2. Export the report — output the full audit as a formatted block for the team to paste into Confluence, a Jira ticket, or a Retrospective board
  3. No action — present the report only

Never take any of these actions without explicit confirmation.


Guardrails

  • Never transition issue status, update fields, or reassign issues without explicit user confirmation.
  • Never frame findings as individual failures — focus on team patterns and process health.
  • If sprint data is incomplete (e.g. Sprint Goal missing, sprint still active), report the gap clearly rather than skipping the check.
  • Story point data is team-internal — do not suggest sharing velocity or capacity data outside the team without understanding the user's intent.
  • If a pattern appears across multiple sprints (e.g. consistently missing ACs, recurring unlinked bugs), name it as a systemic issue worth raising in the Retrospective.