Stakeholder update

Skill Abhillashjadhav/PM-agent-OS/.claude/skills/stakeholder-update

Evidence-aware product-management skills and reviewer agents for discovery, strategy, build, launch, and iteration.

Install
npx -y skills add Abhillashjadhav/PM-agent-OS --skill stakeholder-update

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

3 things to look at

  • 29 days oldThe repository was created 29 days ago. New is not bad, but a brand new repository carrying a familiar-sounding name is the shape a typosquat arrives in, and there has been no time for anyone else to find a problem with it.
  • no licenseNo license file was found in the repository. Code published without one is not open source by default, so using it at work is a question for whoever answers licensing questions where you are.
  • 1 stars1 stars. Stars are a popularity signal and not a quality one, but at this level it is likely that nobody has read this closely except its author, and you would be relying on your own review.

What its author says it does

Copied from the file, not written here

Launch-stage skill: turns raw project state into audience-calibrated status updates whose numbers reconcile exactly to the input — emphasis varies by audience, facts never do. Use when project state needs communicating — 'write the launch status update for the exec team', 'weekly stakeholder update from these notes', 'update sales on where the launch stands' — or when /pm routes such a request here. Do NOT use for public launch announcements (announcement-drafter), for logging decisions to memory (pm-context-system), for one-off meeting summaries, or for cadence-process questions.

SKILL.md

4.8 KB, as published. Nobody here has run it

Stakeholder Update

The same truth, calibrated per audience. Emphasis and detail change with the reader; the numbers and the bad news never do.

Verification gates (defined first; output is blocked until all pass)

  • G1 — Numbers reconcile: every figure in the update appears in, or derives arithmetically from, the input state. No invented progress: nothing "on track" that the state marks late, no sentiment claims ("customers love it") without a signal in the state.
  • G2 — Calibration without drift: audience versions differ in emphasis, ordering, and detail level — never in facts. Bad news present in the state appears in every version; a risk visible to engineering but hidden from the exec update fails the gate.
  • G3 — Context travels with comparisons: a number measured against a target or assumption keeps its time frame and basis (11% at day 12 of a 90-day 15% assumption — not "missing target", not "strong adoption"). Delays carry cause + recovery, not omission.

Steps

  1. Reconcile first. Extract every number, date, target, and issue from the state into a fact table. This table is the update's source of truth — both versions cite it, and the gate check re-derives against it.
  2. Sort facts by audience relevance, not by comfort: exec (risk, trajectory, decisions needed), sales (customer-visible wins, timing, talking points), team (details, blockers, credit). Relevance ranks facts; it never removes the uncomfortable ones.
  3. Frame comparisons honestly. Every actual-vs-target keeps its denominator and clock (day 12 of 90). Ahead/behind/too-early-to-call each have a legitimate framing; pick the true one.
  4. Write the versions: lead with what this audience must know, three-to-six tight facts with their anchors, delays with cause + recovery, then the audience-specific ask or next step from the state.
  5. Gate pass. Re-derive every figure against the fact table (G1), diff the versions for missing bad news (G2), check every comparison for its context (G3). Fix and re-run; maximum 2 repair loops, then report the failure.

Output format

FACT TABLE (from state): 40% rollout (target 100% Fri, 2d late — residency bug, fixed Tue)
· attach 11% at day 12 (assumption: 15% by day 90) · 14 tickets / 2 escalations (both
the bug) · 1 of 3 stalled deals reopened · error 0.3% vs 0.5% rollback line · cohort 3 Thu

TO EXEC — AI summaries: late but recovering, risk contained
Rollout at 40% vs 100% planned — 2 days late on an EU residency bug, fixed Tuesday;
cohort 3 resumes Thursday. Attach 11% at day 12 against a 15%-by-day-90 assumption —
tracking, too early to call. Errors 0.3% vs 0.5% rollback line. 2 escalations, both
the fixed bug. Decision needed: none this week.

TO SALES — one deal back, timing for the rest
Stalled deal #1 reopened, demo booked. Full rollout completes after Thursday's cohort
— safe to schedule demos from Friday. Known issue to acknowledge if asked: EU delay,
fixed. Attach 11% at day 12 (early).
GATE CHECK: G1 pass (n/n reconciled) · G2 pass (bad news in both) · G3 pass

Hard rules

  1. Every number re-derives from the state. If the state doesn't say it, the update doesn't claim it — including mood ("team is confident") and reception ("well received").
  2. Bad news is never audience-filtered. Calibration decides how prominently, never whether.
  3. Comparisons keep their clocks. An early number measured against a later target is framed as early, not as a miss and not as a win.
  4. "On track" is a claim about the plan in the state, not a reassurance. Late is written as late, with cause and recovery.

Limitations

  • The update is only as current as the state provided; it reports, it doesn't fetch — stale input produces a faithful stale update.
  • Audience calibration follows the stated audiences and their stated interests; unlisted audiences need another pass.
  • The skill formats truth; it can't detect state that is itself wrong (a padded input produces a faithfully padded update).
  • Tone is professional-neutral; org-specific voice is the user's edit, and the numbers must survive that edit.