Quantity takeoff calculator
Construction quantity takeoff skill for concrete, steel, earthwork, and materialsFrom its SKILL.md
npx -y skills add a5c-ai/babysitter --skill quantity-takeoff-calculatorAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
SKILL.md
1.9 KB, 285 tokens by cl100k_base, as published. Nobody here has run it
Quantity Takeoff Calculator Skill
Purpose
The Quantity Takeoff Calculator Skill calculates construction quantities including concrete volumes, steel weights, earthwork quantities, and material takeoffs from drawings or BIM models.
Capabilities
- Concrete volume calculation
- Steel weight calculation
- Earthwork quantities
- Pipe and conduit lengths
- Area calculations (formwork, finishes)
- Unit conversion
- Waste factor application
- BIM-based takeoff
Usage Guidelines
When to Use
- Estimating project quantities
- Supporting cost estimates
- Verifying contractor quantities
- Planning material procurement
Prerequisites
- Design documents available
- Takeoff categories defined
- Unit system established
- Waste factors identified
Best Practices
- Use consistent methods
- Document measurement rules
- Apply appropriate waste factors
- Cross-check critical items
Process Integration
This skill integrates with:
- Construction Cost Estimation
- Specifications Development
Configuration
quantity-takeoff-calculator:
categories:
- concrete
- steel
- earthwork
- masonry
- piping
sources:
- bim-model
- drawings
- cad
units:
- imperial
- metric
Output Artifacts
- Quantity summaries
- Material takeoffs
- Cost backup data
- BOM reports
What ships with it
Read from the repository
Just SKILL.md. No reference files, no scripts.