Critical path analyzer

Skill a5c-ai/babysitter/library/specializations/domains/business/project-management/skills/critical-path-analyzer

Perform critical path method (CPM) analysis with forward/backward pass calculationsFrom its SKILL.md

Install
npx -y skills add a5c-ai/babysitter --skill critical-path-analyzer

Assembled from the repository path, not quoted from the project. Check it against their README if it does not work.

SKILL.md

3.0 KB, 456 tokens by cl100k_base, as published. Nobody here has run it

Critical Path Analyzer

Overview

The Critical Path Analyzer skill performs comprehensive Critical Path Method (CPM) analysis on project schedules. It calculates forward and backward passes to determine early/late dates, identifies float values, and highlights the critical path - the longest sequence of dependent activities that determines the minimum project duration.

Capabilities

Core CPM Calculations

  • Calculate forward pass (early start/finish dates)
  • Calculate backward pass (late start/finish dates)
  • Determine total float and free float
  • Identify critical path activities
  • Detect near-critical paths (activities with low float)

Advanced Analysis

  • Perform what-if analysis for schedule compression
  • Calculate schedule risk exposure
  • Generate critical path reports and visualizations
  • Support multiple calendar assignments
  • Handle complex dependency relationships (FS, SS, FF, SF with lag/lead)

Schedule Optimization

  • Identify crashing candidates based on cost-duration tradeoffs
  • Recommend fast-tracking opportunities
  • Calculate compression costs and benefits
  • Model resource-constrained critical path

Usage

Input Requirements

  • Activity list with unique identifiers
  • Activity durations
  • Predecessor/successor relationships with dependency types
  • Optional: Activity calendars
  • Optional: Resource assignments for resource-constrained analysis

Output Deliverables

  • Critical path activity list
  • Float analysis report (total float, free float per activity)
  • Near-critical path identification
  • Network diagram with critical path highlighted
  • Schedule risk metrics

Example Use Cases

  1. Schedule Development: Identify critical path during initial planning
  2. Schedule Recovery: Find compression opportunities when behind schedule
  3. Risk Assessment: Analyze schedule risk through float analysis
  4. What-If Analysis: Model schedule impacts of changes

Process Integration

This skill integrates with the following processes:

  • Schedule Development and Critical Path Analysis
  • earned-value-management.js
  • Program Dependency Management
  • Risk Planning and Assessment

Dependencies

  • Network diagram algorithms
  • Scheduling mathematics libraries
  • Graph traversal algorithms
  • Date/time calculation utilities

Related Skills

  • SK-001: Gantt Chart Generator
  • SK-003: Resource Leveling Optimizer
  • SK-019: Dependency Mapper

What ships with it

Read from the repository

Just SKILL.md. No reference files, no scripts.

Keep looking

Skills are one crate of 326,059. Ordering is by how many stacks a row turns up in, so the top of any crate is what has actually been picked rather than what has the most stars.